Travelled to:
1 × Canada
1 × France
5 × USA
Collaborated with:
I.Yoon A.M.Memon A.A.Porter T.R.Gross T.Long J.Kim P.J.Keleher M.A.Marsh B.Bhattacharjee
Talks about:
test (5) compat (4) softwar (3) compon (3) increment (1) collabor (1) scalabl (1) priorit (1) network (1) languag (1)
Person: Alan Sussman
DBLP: Sussman:Alan
Contributed to:
Wrote 7 papers:
- CBSE-2014-LongYMPS #collaboration #component #testing
- Enabling collaborative testing across shared software components (TL, ICY, AMM, AAP, AS), pp. 55–64.
- CBSE-2011-YoonSMP #component #incremental #testing #towards
- Towards incremental component compatibility testing (ICY, AS, AMM, AAP), pp. 119–128.
- ICSM-2009-YoonSMP #component #testing
- Prioritizing component compatibility tests via user preferences (ICY, AS, AMM, AAP), pp. 29–38.
- ISSTA-2008-YoonSMP #effectiveness #scalability #testing
- Effective and scalable software compatibility testing (ICY, AS, AMM, AAP), pp. 63–74.
- ASE-2007-YoonSMP #testing
- Direct-dependency-based software compatibility testing (ICY, AS, AMM, AAP), pp. 409–412.
- HPDC-2007-KimKMBS #network #using
- Using content-addressable networks for load balancing in desktop grids (JSK, PJK, MAM, BB, AS), pp. 189–198.
- FPCA-1987-GrossS #array
- Mapping a single-assignment language onto the Warp systolic array (TRG, AS), pp. 347–363.