Travelled to:
1 × Japan
2 × USA
Collaborated with:
M.Becker C.Tischer A.Müller M.Ketterer L.Baum G.Molter
Talks about:
product (2) establish (1) influenc (1) variabl (1) reusabl (1) process (1) automot (1) requir (1) famili (1) domain (1)
Person: Lars Geyer
DBLP: Geyer:Lars
Contributed to:
Wrote 3 papers:
- SPLC-2007-TischerMKG #product line #why
- Why does it take that long? Establishing Product Lines in the Automotive Domain (CT, AM, MK, LG), pp. 269–274.
- SPLC-2002-GeyerB #on the #process #product line
- On the Influence of Variabilities on the Application-Engineering Process of a Product Family (LG, MB), pp. 1–14.
- ICRE-2000-BaumBGM #component #design #requirements #reuse #using
- Mapping Requirements to Reusable Components Using Design Spaces (LB, MB, LG, GM), pp. 159–167.