Collaborated with:
Z.Wang F.T.S.Chan
Talks about:
parallel (2) product (2) control (2) system (2) machin (2) manufactur (1) distribut (1) probabl (1) priorit (1) steadi (1)
Person: Wenliang Chen
DBLP: Chen:Wenliang
Contributed to:
Wrote 2 papers:
- CASE-2016-ChenW #capacity
- Integrated capacity planning and production control of a parallel-machine manufacturing system (WC, ZW), pp. 401–406.
- CASE-2017-ChenWC #multi #policy #probability
- Steady state probability distribution of a two-product-type and multi-parallel-machine system under prioritized hedging point control policy (WC, ZW, FTSC), pp. 224–230.