Travelled to:
1 × China
1 × India
1 × Taiwan
2 × USA
Collaborated with:
L.Li Y.Ma J.Wang Hong Lu 0013 Q.Wu X.Gu Z.Wang Jianfeng Lu 0004 Lianlian Zhang Xiaoyu Lu Junxia Xing
Talks about:
schedul (9) semiconductor (5) base (5) manufactur (4) algorithm (4) machin (4) energi (3) parallel (2) process (2) object (2)
Person: Fei Qiao
DBLP: Qiao:Fei
Contributed to:
Wrote 11 papers:
- CASE-2014-WangQ #collaboration #energy #enterprise #optimisation
- Cost and energy consumption collaborative optimization for sintering burdening in iron and steel enterprise (JW, FQ), pp. 486–491.
- CASE-2013-QiaoMG #algorithm #data-driven #scheduling
- Attribute selection algorithm of data-based scheduling strategy for semiconductor manufacturing (FQ, YM, XG), pp. 410–415.
- CASE-2009-LiQW #parallel #scheduling
- ACO-based scheduling of parallel batch processing machines to minimize the total weighted tardiness (LL, FQ, QW), pp. 280–285.
- CASE-2008-LiQ #scheduling
- ACO-based scheduling for a single Batch Processing Machine in semiconductor manufacturing (LL, FQ), pp. 85–90.
- CASE-2008-LiQ08a #performance #requirements #scheduling
- The impact of the qual-run requirements of APC on the scheduling performance in semiconductor manufacturing (LL, FQ), pp. 242–246.
- CASE-2006-WangQW #multi #optimisation #scheduling
- Scheduling Semiconductor Wafer Fabrication with Optimization of Multiple objectives (ZW, FQ, QW), pp. 253–258.
- CASE-2016-MaQL #scheduling
- Learning-based dynamic scheduling of semiconductor manufacturing system (YM, FQ, JL0), pp. 1394–1399.
- CASE-2017-LuQ #algorithm #energy #parallel #problem #scheduling #search-based
- An improved genetic algorithm for a parallel machine scheduling problem with energy consideration (HL0, FQ), pp. 1487–1492.
- CASE-2018-ZhangQW #algorithm #assessment #health
- Equipment health assessment and fault-early warning algorithm based on improved SVDD (LZ, FQ, JW), pp. 716–721.
- CASE-2019-MaLQ #data-driven #information management #scheduling
- Data Driven Scheduling Knowledge Management for Smart Shop Floor (YM, XL, FQ), pp. 109–114.
- CASE-2019-XingQ0 #algorithm #energy #hybrid #multi #scheduling
- A Hybrid Multi-objective Algorithm for Energy-Efficient Scheduling Considering Machine Maintenance* (JX, FQ, HL0), pp. 115–120.