1206 papers:
- CBSE-2015-KimBNMLSLP #analysis #probability #scheduling
- Quantitative Schedulability Analysis of Continuous Probability Tasks in a Hierarchical Context (JHK, AB, UN, MM, KGL, AS, IL, LTXP), pp. 91–100.
- CASE-2015-AlfonsoXA #approach #capacity #programming #representation #scheduling
- A simulation-optimization approach for capacity planning and appointment scheduling of blood donors based on mathematical programming representation of event dynamics (EA, XX, VA), pp. 728–733.
- CASE-2015-CarnielBRM #scheduling
- Including workers with disabilities in flow shop scheduling (GCC, AJB, MR, CM), pp. 985–991.
- CASE-2015-KarnikD #online #scheduling
- Optimal scheduling of campaigns on on-line forums (AK, PD), pp. 775–780.
- CASE-2015-KouiderHOO #approach #graph #integer #linear #scheduling #source code
- Mixed integer linear programs and tabu search approach to solve mixed graph coloring for unit-time job shop scheduling (AK, HAH, SO, AO), pp. 1177–1181.
- CASE-2015-LennvallRS #automation #scheduling
- Scheduling of electrical loads in home automation systems (TL, LR, PS), pp. 1307–1312.
- CASE-2015-LinYCLL #constraints #scheduling
- A master-axis-based feedrate scheduling with jerk constraints for five-axis tool center point trajectory (MTL, NTY, WTC, CYL, YML), pp. 111–116.
- CASE-2015-MonchY #constraints #parallel #scheduling
- Scheduling jobs on parallel machines with qualification constraints (LM, CY), pp. 657–658.
- CASE-2015-SchafaschekQC #clustering #composition #scheduling #tool support
- Local modular supervisory control applied to the scheduling of cluster tools (GS, MHdQ, JERC), pp. 1381–1388.
- CASE-2015-SunWWL15a #optimisation #scheduling
- Simulation-based production scheduling with optimization of electricity consumption and cost in smart manufacturing systems (ZS, DW, LW, LL), pp. 992–997.
- CASE-2015-XuZLW #order #probability #scheduling #throughput
- Stochastic customer order scheduling to maximize throughput (XX, YZ, HL, MW), pp. 665–670.
- CASE-2015-ZhuQZ #clustering #modelling #multi #petri net #scheduling #tool support
- Petri net modeling and one-wafer scheduling of single-arm tree-like multi-cluster tools (QZ, YQ, MZ), pp. 292–297.
- DAC-2015-HuangCZL #behaviour #named #realtime #scheduling
- PASS: priority assignment of real-time tasks with dynamic suspending behavior under fixed-priority scheduling (WHH, JJC, HZ, CL), p. 6.
- DAC-2015-MaoHCL #named
- VWS: a versatile warp scheduler for exploring diverse cache localities of GPGPU applications (MM, JH, YC, HL), p. 6.
- DAC-2015-RahimiCMGB #clustering #embedded #hardware #memory management #scheduling #variability
- Task scheduling strategies to mitigate hardware variability in embedded shared memory clusters (AR, DC, AM, RKG, LB), p. 6.
- DAC-2015-ThieleAE #analysis #scheduling
- Improving formal timing analysis of switched ethernet by exploiting FIFO scheduling (DT, PA, RE), p. 6.
- DAC-2015-ZhangLSLWXY #energy #migration #scheduling
- Deadline-aware task scheduling for solar-powered nonvolatile sensor nodes with global energy migration (DZ, YL, XS, JL, TW, CJX, HY), p. 6.
- DATE-2015-Baruah #graph #scheduling
- The federated scheduling of constrained-deadline sporadic DAG task systems (SB), pp. 1323–1328.
- DATE-2015-ChenYQFM #evaluation #model checking #scheduling #statistics #using
- Variation-aware evaluation of MPSoC task allocation and scheduling strategies using statistical model checking (MC, DY, XQ, XF, PM), pp. 199–204.
- DATE-2015-DuqueDY #adaptation #behaviour #fault #reliability #runtime
- Improving MPSoC reliability through adapting runtime task schedule based on time-correlated fault behavior (LARD, JMMD, CY), pp. 818–823.
- DATE-2015-HanFNQ #energy #fault tolerance #multi #scheduling
- Energy minimization for fault tolerant scheduling of periodic fixed-priority applications on multiprocessor platforms (QH, MF, LN, GQ), pp. 830–835.
- DATE-2015-HerberRWH #realtime #scheduling #using
- Real-time capable CAN to AVB ethernet gateway using frame aggregation and scheduling (CH, AR, TW, AH), pp. 61–66.
- DATE-2015-HuangKGT #scheduling
- Run and be safe: mixed-criticality scheduling with temporary processor speedup (PH, PK, GG, LT), pp. 1329–1334.
- DATE-2015-KanounS #big data #concept #data type #detection #learning #online #scheduling #streaming
- Big-data streaming applications scheduling with online learning and concept drift detection (KK, MvdS), pp. 1547–1550.
- DATE-2015-KapadiaP #adaptation #named #parallel #scheduling
- VARSHA: variation and reliability-aware application scheduling with adaptive parallelism in the dark-silicon era (NAK, SP), pp. 1060–1065.
- DATE-2015-KimAS #bound #composition #scheduling
- Schedulability bound for integrated modular avionics partitions (JEK, TFA, LS), pp. 37–42.
- DATE-2015-LeleMB #case study #data flow
- FP-scheduling for mode-controlled dataflow: a case study (AL, OM, KvB), pp. 1257–1260.
- DATE-2015-LiaoWC #3d #manycore #online
- An online thermal-constrained task scheduler for 3D multi-core processors (CHL, CHPW, KC), pp. 351–356.
- DATE-2015-PsarrasSND #named #network #performance #scheduling
- PhaseNoC: TDM scheduling at the virtual-channel level for efficient network traffic isolation (AP, IS, CN, GD), pp. 1090–1095.
- DATE-2015-WangNRQ #manycore #realtime #scheduling #statistics
- Multi-core fixed-priority scheduling of real-time tasks with statistical deadline guarantee (TW, LN, SR, GQ), pp. 1335–1340.
- DATE-2015-WaqasGKSBSVC #heuristic #online #scalability #scheduling
- A re-entrant flowshop heuristic for online scheduling of the paper path in a large scale printer (UW, MG, JK, LJS, TB, SS, PV, HC), pp. 573–578.
- SIGMOD-2015-ClinkenbeardN #communication #scheduling
- Job Scheduling with Minimizing Data Communication Costs (TC, AN), pp. 2071–2072.
- SIGMOD-2015-DokaPTMK #big data #data analysis #multi #named #workflow
- IReS: Intelligent, Multi-Engine Resource Scheduler for Big Data Analytics Workflows (KD, NP, DT, CM, NK), pp. 1451–1456.
- TACAS-2015-BransenBCD #attribute grammar #order #scheduling #using
- Linearly Ordered Attribute Grammar Scheduling Using SAT-Solving (JB, LTvB, KC, AD), pp. 289–303.
- PLDI-2015-MachadoLR #concurrent #debugging #difference
- Concurrency debugging with differential schedule projections (NM, BL, LETR), pp. 586–595.
- ICALP-v1-2015-DisserKL #bidirectional #scheduling
- Scheduling Bidirectional Traffic on a Path (YD, MK, EL), pp. 406–418.
- FM-2015-EisentrautGHS0 #bisimulation #probability
- Probabilistic Bisimulation for Realistic Schedulers (CE, JCG, HH, LS, LZ), pp. 248–264.
- FM-2015-ZhuYGZZZ #data flow #graph #model checking #scheduling
- Static Optimal Scheduling for Synchronous Data Flow Graphs with Model Checking (XZ, RY, YLG, JZ, WZ, GZ), pp. 551–569.
- AdaEurope-2015-ZamoranoG #analysis #scheduling
- Schedulability Analysis of PWM Tasks for the UPMSat-2 ADCS (JZ, JG), pp. 85–99.
- CAiSE-2015-SenderovichWGMK #network #process #validation
- Discovery and Validation of Queueing Networks in Scheduled Processes (AS, MW, AG, AM, SK, CAB), pp. 417–433.
- ICEIS-v1-2015-ConstantinoTPLR #scheduling
- A Variable Neighbourhood Search for Nurse Scheduling with Balanced Preference Satisfaction (AAC, ET, RLP, DLS, WR), pp. 462–470.
- ICEIS-v1-2015-GharbiGB #approach #configuration management #embedded #hybrid #realtime #scheduling #search-based
- A Hybrid Genetic based Approach for Real-time Reconfigurable Scheduling of OS Tasks in Uniprocessor Embedded Systems (IG, HG, SB), pp. 385–390.
- ICEIS-v1-2015-NouriDG #algorithm #flexibility #multi #problem #scheduling #search-based
- Genetic Algorithm Combined with Tabu Search in a Holonic Multiagent Model for Flexible Job Shop Scheduling Problem (HEN, OBD, KG), pp. 573–584.
- SEKE-2015-RahmeX #scheduling
- Reliability-Based Software Rejuvenation Scheduling for Cloud-Based Systems (JR, HX), pp. 298–303.
- SIGIR-2015-KharitonovMSO #online #scheduling
- Optimised Scheduling of Online Experiments (EK, CM, PS, IO), pp. 453–462.
- QAPL-2015-KawamotoG #data flow
- Quantitative Information Flow for Scheduler-Dependent Systems (YK, TGW), pp. 48–62.
- SAC-2015-CremonaMN #composition #named #representation #simulation
- TRES: a modular representation of schedulers, tasks, and messages to control simulations in simulink (FC, MM, MDN), pp. 1940–1947.
- SAC-2015-IqbalAB #design #framework #network #scheduling
- Designing network servers within a hierarchical scheduling framework (ZI, LA, MB), pp. 653–658.
- SAC-2015-LeeP #reduction
- Search space reduction for electric vehicle-based tour schedules (JL, GLP), pp. 2075–2076.
- SAC-2015-Lopez-CasadoPCM #named #network #novel
- GlSch: a novel scheduler for a heterogeneous telescope network (MCLC, CJPdP, JCC, VFM, GOL, AJCT, JS, EM, JM, SK, FMS), pp. 2263–2270.
- SAC-2015-LujakF #named #scheduling
- ORCAS: optimized robots configuration and scheduling system (ML, AF), pp. 327–330.
- SAC-2015-SaezPCCP #manycore #named #symmetry
- ACFS: a completely fair scheduler for asymmetric single-isa multicore systems (JCS, AP, FC, DC, MPM), pp. 2027–2032.
- SAC-2015-SilvaMFM #evaluation #metric #mobile
- A scheduler for mobile cloud based on weighted metrics and dynamic context evaluation (FAS, PRMM, GF, RRMM), pp. 569–576.
- ESEC-FSE-2015-HuangR #branch
- Finding schedule-sensitive branches (JH, LR), pp. 439–449.
- CGO-2015-KimHSLH #architecture #concurrent #cpu #modelling #programming #scheduling #thread
- Locality-centric thread scheduling for bulk-synchronous programming models on CPU architectures (HSK, IEH, JAS, SSL, WmWH), pp. 257–268.
- HPCA-2015-BeckmannTS #distributed #scalability
- Scaling distributed cache hierarchies through computation and data co-scheduling (NB, PAT, DS), pp. 538–550.
- HPCA-2015-ZhuHR #energy #mobile #scheduling #web
- Event-based scheduling for energy-efficient QoS (eQoS) in mobile Web applications (YZ, MH, VJR), pp. 137–149.
- SOSP-2015-YangHAKKAKAA #scheduling
- Split-level I/O scheduling (SY, TH, NA, SSK, AK, SAK, RTK, ACAD, RHAD), pp. 474–489.
- CAV-2015-CernyCHRRST #scheduling #synthesis #using
- From Non-preemptive to Preemptive Scheduling Using Synchronization Synthesis (PC, EMC, TAH, AR, LR, RS, TT), pp. 180–197.
- CASE-2014-ChenGGLCL #analysis #approach #behaviour #scheduling
- A residential load scheduling approach based on load behavior analysis (SC, FG, XG, TL, YC, YL), pp. 954–959.
- CASE-2014-CuiL #scheduling
- Integrated production scheduling and periodic maintenances on a single machine with release dates (WWC, ZL), pp. 353–358.
- CASE-2014-DengWW #algorithm #distributed #problem #scheduling
- A competitive memetic algorithm for the distributed flow shop scheduling problem (JD, LW, SW), pp. 107–112.
- CASE-2014-HaoLGC #effectiveness #flexibility #markov #network #nondeterminism #problem #scheduling
- An effective Markov network based EDA for flexible job shop scheduling problems under uncertainty (XCH, LL, MG, CFC), pp. 131–136.
- CASE-2014-HerrNV #complexity #distributed #framework #scheduling
- Prognostics-based scheduling in a distributed platform: Model, complexity and resolution (NH, JMN, CV), pp. 1054–1059.
- CASE-2014-HuangJXGX #energy #nondeterminism #probability #scheduling
- EV charging load scheduling following uncertain renewable energy supply by stochastic matching (QH, QSJ, LX, XG, XX), pp. 137–142.
- CASE-2014-LiLT #petri net #probability #process #scheduling
- A color petri net based scheduling model for remanufacturing system with stochastic process routing (LL, CL, YT), pp. 474–479.
- CASE-2014-LiY #scheduling
- ACO-ICSA based scheduling of re-entrant manufacturing system with Mix-processing Style (LL, QY), pp. 87–92.
- CASE-2014-LiZLM #approach #capacity #scheduling
- An intercell scheduling approach considering transportation capacity (ML, HZ, DL, XM), pp. 594–599.
- CASE-2014-MaTLZLD #algorithm #hybrid #optimisation #scheduling
- A hybrid particle swarm optimization and simulated annealing algorithm for job-shop scheduling (PCM, FT, YL, LZ, HXL, ZD), pp. 125–130.
- CASE-2014-ParidariPSJ #energy #performance #scheduling
- Energy and CO2 efficient scheduling of smart appliances in active houses equipped with batteries (KP, AP, HS, KHJ), pp. 632–639.
- CASE-2014-WangCG #algorithm #constraints #estimation #hybrid #multi #problem #scheduling
- Hybrid estimation of distribution algorithm with multiple subpopulations for semiconductor manufacturing scheduling problem with limited waiting-time constraint (HKW, CFC, MG), pp. 101–106.
- CASE-2014-WangW #algorithm #estimation #problem #scheduling #testing
- Compact estimation of distribution algorithm for semiconductor final testing scheduling problem (SW, LW), pp. 113–118.
- CASE-2014-WuBZ #approach #linear #scheduling
- Linear programming-based approach to scheduling of crude oil operations in refinery with oil type mixing requirement (NW, LB, MZ), pp. 430–435.
- CASE-2014-YangWQZ #clustering #multi #scheduling #tool support
- Optimal scheduling of single-arm multi-cluster tools with two-space buffering modules (FY, NW, YQ, MZ), pp. 75–80.
- CASE-2014-YuanLJ #health #probability #problem #scheduling
- Home health care crew scheduling and routing problem with stochastic service times (BY, RL, ZJ), pp. 564–569.
- CASE-2014-YugmaBDV #bibliography #integration #process #scheduling
- Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook (CY, JB, SDP, PV), pp. 93–98.
- CASE-2014-ZengXLMS #evaluation #performance
- An analytical model for performance evaluation of operating room schedules in orthopedic surgery (ZZ, XX, JL, HM, SGSR), pp. 570–575.
- CASE-2014-ZhangXG #multi #scheduling
- Simulation-based surgery appointment sequencing and scheduling of multiple operating rooms (ZZ, XX, NG), pp. 399–404.
- CASE-2014-ZhuWQZ #analysis #clustering #constraints #modelling #multi #petri net #scheduling #tool support
- Modeling and schedulability analysis of single-arm multi-cluster tools with residency time constraints via Petri nets (QZ, NW, YQ, MZ), pp. 81–86.
- DAC-2014-HuangYT #fault tolerance #on the #scheduling
- On the Scheduling of Fault-Tolerant Mixed-Criticality Systems (PH, HY, LT), p. 6.
- DAC-2014-SagstetterAWLSCK #architecture #framework #integration
- Schedule Integration Framework for Time-Triggered Automotive Architectures (FS, SA, PW, ML, HS, SC, AK), p. 6.
- DAC-2014-TsengHPK #energy #manycore #mobile #scheduling
- User-Centric Energy-Efficient Scheduling on Multi-Core Mobile Devices (PHT, PCH, CCP, TWK), p. 6.
- DATE-2014-AzimCPF #communication #distributed #generative #multi #realtime
- Generation of communication schedules for multi-mode distributed real-time applications (AA, GC, RP, SF), pp. 1–6.
- DATE-2014-CannellaBS #approach #realtime #scheduling #streaming #using
- System-level scheduling of real-time streaming applications using a semi-partitioned approach (EC, MB, TS), pp. 1–6.
- DATE-2014-CilardoFGM #communication #manycore #scheduling #synthesis
- Joint communication scheduling and interconnect synthesis for FPGA-based many-core systems (AC, EF, LG, AM), pp. 1–4.
- DATE-2014-FrijnsASVGSC #analysis #graph
- Timing analysis of First-Come First-Served scheduled interval-timed Directed Acyclic Graphs (RF, SA, SS, JV, MCWG, RRHS, HC), pp. 1–6.
- DATE-2014-Fu0PJZ #data flow #detection #fault #parallel #thread
- A fault detection mechanism in a Data-flow scheduled Multithreaded processor (JF, QY, RP, CRJ, CZ), pp. 1–4.
- DATE-2014-GaoGWP #energy #fault #fault tolerance #framework #in the cloud #scheduling
- An energy-aware fault tolerant scheduling framework for soft error resilient cloud computing systems (YG, SKG, YW, MP), pp. 1–6.
- DATE-2014-Guan0 #analysis #performance #scheduling
- General and efficient Response Time Analysis for EDF scheduling (NG, WY), pp. 1–6.
- DATE-2014-GuGD0 #multi #scheduling
- Partitioned mixed-criticality scheduling on multiprocessor platforms (CG, NG, QD, WY), pp. 1–6.
- DATE-2014-HanZLD #named #scheduling
- SAFE: Security-Aware FlexRay Scheduling Engine (GH, HZ, YL, WD), pp. 1–4.
- DATE-2014-KahngK #logic #memory management #scheduling
- Co-optimization of memory BIST grouping, test scheduling, and logic placement (ABK, IK), pp. 1–6.
- DATE-2014-LeeF #framework #named #realtime #runtime #scheduling
- GPU-EvR: Run-time event based real-time scheduling framework on GPGPU platform (HL, MAAF), pp. 1–6.
- DATE-2014-MarianiPZS #design #named #predict #scheduling #simulation #using
- DeSpErate: Speeding-up design space exploration by using predictive simulation scheduling (GM, GP, VZ, CS), pp. 1–4.
- DATE-2014-MullerM #scheduling
- The schedulability region of two-level mixed-criticality systems based on EDF-VD (DM, AM), pp. 1–6.
- DATE-2014-SongLKSCR #energy #scheduling
- Energy-efficient scheduling for memory-intensive GPGPU workloads (SS, ML, JK, WS, YGC, SR), pp. 1–6.
- DATE-2014-ZhuGBS #data flow #graph #scheduling
- Memory-constrained static rate-optimal scheduling of synchronous dataflow graphs via retiming (XYZ, MG, TB, SS), pp. 1–6.
- VLDB-2014-ZhangLTYTX #fault tolerance #internet #named #resource management #scheduling
- Fuxi: a Fault-Tolerant Resource Management and Job Scheduling System at Internet Scale (ZZ, CL, YT, RY, HT, JX), pp. 1393–1404.
- STOC-2014-ImKM #algorithm #constraints #scheduling
- Competitive algorithms from competitive equilibria: non-clairvoyant scheduling under polyhedral constraints (SI, JK, KM), pp. 313–322.
- ICALP-v1-2014-EsfandiariHKLMR #online #order #probability #scheduling
- Online Stochastic Reordering Buffer Scheduling (HE, MH, MRK, VL, HM, HR), pp. 465–476.
- ICALP-v1-2014-HohnMW #cost analysis #how #scheduling
- How Unsplittable-Flow-Covering Helps Scheduling with Job-Dependent Cost Functions (WH, JM, AW), pp. 625–636.
- ICALP-v1-2014-MakarychevP #scheduling
- Precedence-Constrained Scheduling of Malleable Jobs with Preemption (KM, DP), pp. 823–834.
- AdaEurope-2014-BurnsW #programming #scheduling
- Deadline-Aware Programming and Scheduling (AB, AJW), pp. 107–118.
- AdaEurope-2014-QamhiehM #analysis #graph #multi #scheduling
- Schedulability Analysis for Directed Acyclic Graphs on Multiprocessor Systems at a Subtask Level (MQ, SM), pp. 119–133.
- AdaEurope-2014-SaezC #kernel #predict #realtime
- Integrated Schedulers for a Predictable Interrupt Management on Real-Time Kernels (SS, AC), pp. 134–148.
- AdaEurope-2014-SaezRC #ada #multi #realtime #reliability #scheduling
- Reliable Handling of Real-Time Scheduling Attributes on Multiprocessor Platforms in Ada 2012 (SS, JR, AC), pp. 74–90.
- ICEIS-v1-2014-HaddadCSM #algorithm #heuristic #named #parallel #problem #scheduling
- AIV: A Heuristic Algorithm based on Iterated Local Search and Variable Neighborhood Descent for Solving the Unrelated Parallel Machine Scheduling Problem with Setup Times (MNH, LPC, MJFS, NM), pp. 376–383.
- ICEIS-v1-2014-NoelMC #algorithm #problem #scheduling
- Evolutionary Algorithms Applied to Agribusiness Scheduling Problem (AN, JMJ, AAC), pp. 489–496.
- SEKE-2014-LeungLZ #process #scheduling
- Snowball Effects on Risk Mitigation Scheduling: Process and Tool (HKNL, KML, PZ), pp. 582–585.
- ECOOP-2014-ImamS #parallel #scheduling
- Cooperative Scheduling of Parallel Tasks with General Synchronization Patterns (SMI, VS), pp. 618–643.
- SAC-2014-AndradeRMOCFR #architecture #hybrid #performance #scheduling
- Efficient dynamic scheduling of heterogeneous applications in hybrid architectures (GA, GSR, DM, RSO, EC, RF, LCdR), pp. 866–871.
- SAC-2014-Chen #analysis #behaviour #coordination #energy #research #scheduling #student
- Student research abstract: demand behavior analysis and coordination scheduling for energy saving in smart building (SC), pp. 569–570.
- SAC-2014-GeorgiadisP #algorithm #online #problem #scheduling #smarttech
- Dealing with storage without forecasts in smart grids: problem transformation and online scheduling algorithm (GG, MP), pp. 518–524.
- SAC-2014-HenrioR #declarative #scheduling
- Declarative scheduling for active objects (LH, JR), pp. 1339–1344.
- SAC-2014-KangS #analysis #implementation #scheduling
- Schedulability analysis support for automotive systems: from requirement to implementation (EYK, PYS), pp. 1080–1085.
- SAC-2014-Rohrig #domain-specific language #process #scheduling
- A domain specific language for process scheduling (DR), pp. 1550–1551.
- SAC-2014-Sechting #framework #independence
- A platform independent scheduler framework (CRS), pp. 1552–1553.
- SAC-2014-WangH #data access #fine-grained #performance
- An I/O scheduler based on fine-grained access patterns to improve SSD performance and lifespan (MW, YH), pp. 1511–1516.
- FSE-2014-Kasi #detection #scheduling
- Minimizing software conflicts through proactive detection of conflicts and task scheduling (BKK), pp. 807–810.
- ASPLOS-2014-DingZZES #compilation #complexity #runtime #scheduling
- Finding the limit: examining the potential and complexity of compilation scheduling for JIT-based runtime systems (YD, MZ, ZZ, SE, XS), pp. 607–622.
- ASPLOS-2014-MenychtasSS #performance #scheduling
- Disengaged scheduling for fair, protected access to fast computational accelerators (KM, KS, MLS), pp. 301–316.
- HPCA-2014-LeeSMKSCR #concurrent #resource management #scheduling #thread
- Improving GPGPU resource utilization through alternative thread block scheduling (ML, SS, JM, JK, WS, YGC, SR), pp. 260–271.
- HPDC-2014-BeaumontM #analysis #matrix #multi #scheduling
- Analysis of dynamic scheduling strategies for matrix multiplication on heterogeneous platforms (OB, LM), pp. 141–152.
- HPDC-2014-ChenWDZXJS #clustering #scheduling
- Communication-driven scheduling for virtual clusters in cloud (HC, SW, SD, BBZ, ZX, HJ, XS), pp. 125–128.
- LCTES-2014-BebelisFG #data flow #framework #manycore #parametricity
- A framework to schedule parametric dataflow applications on many-core platforms (VB, PF, AG), pp. 125–134.
- OSDI-2014-0001RB #concurrent #debugging #kernel #named
- SKI: Exposing Kernel Concurrency Bugs through Systematic Schedule Exploration (PF, RR, BBB), pp. 415–431.
- OSDI-2014-BoutinELSZQWZ #coordination #named #scalability #scheduling
- Apollo: Scalable and Coordinated Scheduling for Cloud-Scale Computing (EB, JE, WL, BS, JZ, ZQ, MW, LZ), pp. 285–300.
- OSDI-2014-VenkataramanPAFS #clustering #power of #scheduling
- The Power of Choice in Data-Aware Cluster Scheduling (SV, AP, GA, MJF, IS), pp. 301–316.
- PPoPP-2014-0003VTCT #data type #scheduling
- Data structures for task-based priority scheduling (MW, FV, JLT, DC, PT), pp. 379–380.
- PPoPP-2014-AgrawalFSSU #data type #parallel #scheduling #source code
- Provably good scheduling for parallel programs that use data structures through implicit batching (KA, JTF, BS, JS, RU), pp. 389–390.
- PPoPP-2014-EslamimehrP #concurrent #scheduling #source code
- Race directed scheduling of concurrent programs (ME, JP), pp. 301–314.
- PPoPP-2014-RaoZ #performance #scheduling #towards #virtual machine
- Towards fair and efficient SMP virtual machine scheduling (JR, XZ), pp. 273–286.
- PPoPP-2014-ThomsonDB #bound #concurrent #empirical #testing #using
- Concurrency testing using schedule bounding: an empirical study (PT, AFD, AB), pp. 15–28.
- VMCAI-2014-SchwarzSVA #analysis #precise #source code
- Precise Analysis of Value-Dependent Synchronization in Priority Scheduled Programs (MDS, HS, VV, KA), pp. 21–38.
- CASE-2013-FantiIRU #analysis #scheduling #simulation
- A simulation based analysis of production scheduling in a steelmaking and continuous casting plant (MPF, GI, GR, WU), pp. 150–155.
- CASE-2013-JiaJL #algorithm #scheduling
- A job-family-oriented algorithm for re-entrant batch processing machine scheduling (WJ, ZJ, YL), pp. 1022–1027.
- CASE-2013-JinM #algorithm #clustering #constraints #scheduling #tool support
- Transient scheduling of single armed cluster tools: Algorithms for wafer residency constraints (HYJ, JRM), pp. 856–861.
- CASE-2013-KimLK #clustering #scheduling #tool support
- Optimal scheduling of transient cycles for single-armed cluster tools (DKK, TEL, HJK), pp. 874–879.
- CASE-2013-LiF #approach #integer #linear #multi #problem #programming #scheduling
- A mixed integer linear programming approach for multi-degree cyclic multi-hoist scheduling problems without overlapping (XL, RYKF), pp. 274–279.
- CASE-2013-MoubarakAB #composition #configuration management #multi #scheduling
- Reconfiguring a modular robot into a humanoid formation: A multi-body dynamic perspective on motion scheduling for modules and their assemblies (PMM, EJA, PBT), pp. 687–692.
- CASE-2013-Pan #combinator #problem #scheduling
- A combinatorial auctions perspective on min-sum scheduling problems (YP), pp. 564–569.
- CASE-2013-QiaoMG #algorithm #data-driven #scheduling
- Attribute selection algorithm of data-based scheduling strategy for semiconductor manufacturing (FQ, YM, XG), pp. 410–415.
- CASE-2013-QiaoWZ #clustering #scheduling #tool support
- Scheduling of time constrained dual-arm cluster tools with wafer revisiting (YQ, NW, MZ), pp. 868–873.
- CASE-2013-SunSS #optimisation #scheduling
- Integrated operating room scheduling optimization under particularly workload constrain of surgeon (BS, JS, LS), pp. 972–977.
- CASE-2013-WangSS #novel #order #polynomial #problem #scheduling
- A novel quadratic formulation for customer order scheduling problem (LW, ZS, LS), pp. 576–580.
- CASE-2013-ZhengC #enterprise #industrial
- Master production schedule and system for excelling enterprise resources (SEER) in the LED industry (JNZ, CFC), pp. 1034–1039.
- CASE-2013-ZhuGX #scheduling
- MDP-based appointment scheduling for one examination of two types of outpatients (LZ, NG, XX), pp. 764–769.
- CASE-2013-ZhuWQZ #clustering #modelling #multi #petri net #scheduling #tool support
- Petri net modeling and one-wafer scheduling of single-arm multi-cluster tools (QZ, NW, YQ, MZ), pp. 862–867.
- DAC-2013-AxerE #fault #probability #scheduling
- Stochastic response-time guarantee for non-preemptive, fixed-priority scheduling under errors (PA, RE), p. 7.
- DAC-2013-CalimeraMP #constraints #energy #fault #scheduling
- Energy-optimal SRAM supply voltage scheduling under lifetime and error constraints (AC, EM, MP), p. 6.
- DAC-2013-NathAR #concurrent #scheduling #thread
- Temperature aware thread block scheduling in GPGPUs (RN, RZA, TSR), p. 6.
- DAC-2013-ZhangGQ #embedded #energy #performance #scheduling
- Improving charging efficiency with workload scheduling in energy harvesting embedded systems (YZ, YG, QQ), p. 8.
- DATE-2013-CastellanaF #analysis #independence #liveness #scheduling #synthesis
- Scheduling independent liveness analysis for register binding in high level synthesis (VGC, FF), pp. 1571–1574.
- DATE-2013-ChantemYHD #manycore #online #reliability #scheduling
- Enhancing multicore reliability through wear compensation in online assignment and scheduling (TC, XY, XSH, RPD), pp. 1373–1378.
- DATE-2013-DaneshtalabEPT #interface #manycore #named #network
- CARS: congestion-aware request scheduler for network interfaces in NoC-based manycore systems (MD, ME, JP, HT), pp. 1048–1051.
- DATE-2013-El-ShambakeyR #named #realtime #scheduling
- FBLT: a real-time contention manager with improved schedulability (MES, BR), pp. 1325–1330.
- DATE-2013-GangadharanCZ #scheduling
- Quality-aware media scheduling on MPSoC platforms (DG, SC, RZ), pp. 976–981.
- DATE-2013-GaoGB #fault tolerance #scheduling #using
- Using explicit output comparisons for fault tolerant scheduling (FTS) on modern high-performance processors (YG, SKG, MAB), pp. 927–932.
- DATE-2013-GoswamiMSXC #design #multi
- Multirate controller design for resource- and schedule-constrained automotive ECUs (DG, AM, RS, CJX, SC), pp. 1123–1126.
- DATE-2013-KimYIBS #manycore #realtime #scheduling
- Optimized scheduling of multi-IMA partitions with exclusive region for synchronized real-time multi-core systems (JEK, MKY, SI, RMB, LS), pp. 970–975.
- DATE-2013-RizkBJMA #case study #design
- Statically-scheduled application-specific processor design: a case-study on MMSE MIMO equalization (MR, AB, MJ, YM, YA), pp. 677–680.
- DATE-2013-SuZ #algorithm #scheduling
- An elastic mixed-criticality task model and its scheduling algorithm (HS, DZ), pp. 147–152.
- DATE-2013-WangJSZ #fault tolerance #framework #scheduling
- A work-stealing scheduling framework supporting fault tolerance (YW, WJ, FS, QZ), pp. 695–700.
- DATE-2013-YoonKBS #design #multi #optimisation #parametricity #scheduling
- Holistic design parameter optimization of multiple periodic resources in hierarchical scheduling (MKY, JEK, RMB, LS), pp. 1313–1318.
- DATE-2013-ZhaoGZ #named #scheduling
- PT-AMC: integrating preemption thresholds into mixed-criticality scheduling (QZ, ZG, HZ), pp. 141–146.
- VLDB-2013-ChiHHN #query #scheduling
- Distribution-Based Query Scheduling (YC, HH, WPH, JFN), pp. 673–684.
- VLDB-2013-ZhuFCY #approximate #incremental #personalisation #rank
- Incremental and Accuracy-Aware Personalized PageRank through Scheduled Approximation (FZ, YF, KCCC, JY), pp. 481–492.
- TACAS-2013-KempfBM #nondeterminism #probability #scheduling
- As Soon as Probable: Optimal Scheduling under Stochastic Uncertainty (JFK, MB, OM), pp. 385–400.
- PLDI-2013-LifflanderKK
- Steal Tree: low-overhead tracing of work stealing schedulers (JL, SK, LVK), pp. 507–518.
- PLDI-2013-NowatzkiSCSER #architecture #constraints #framework #scheduling
- A general constraint-centric scheduling framework for spatial architectures (TN, MST, LDC, KS, CE, BR), pp. 495–506.
- STOC-2013-ChawlaHMS #independence #scheduling
- Prior-independent mechanisms for scheduling (SC, JDH, DLM, BS), pp. 51–60.
- ICALP-v1-2013-MegowV #scheduling
- Dual Techniques for Scheduling on a Machine with Varying Speed (NM, JV), pp. 745–756.
- ICALP-v1-2013-MuchaS #problem #scheduling #symmetry
- No-Wait Flowshop Scheduling Is as Hard as Asymmetric Traveling Salesman Problem (MM, MS), pp. 769–779.
- ICALP-v2-2013-Albers #problem #scheduling
- Recent Advances for a Classical Scheduling Problem (SA), pp. 4–14.
- ICALP-v2-2013-AlbersP #algorithm #online #scheduling #web
- New Online Algorithms for Story Scheduling in Web Advertising (SA, AP), pp. 446–458.
- CSCW-2013-ReineckeNBNG #behaviour #difference #online #scheduling
- Doodle around the world: online scheduling behavior reflects cultural differences in time perception and group decision-making (KR, MKN, AB, MN, KZG), pp. 45–54.
- ICEIS-v1-2013-BudiM #communication #mobile #scheduling
- Scheduling Data Communication based Services on the Personal Mobile Devices (SB, VM), pp. 401–408.
- ICEIS-v1-2013-CoutinhoPB #energy #scheduling
- A Scheduling Strategy for Global Scientific Grids — Minimizing Simultaneously Time and Energy Consumption (FC, LLP, CTB), pp. 545–553.
- ICEIS-v2-2013-KimMMK #optimisation #visualisation
- Application of Information Technology for Visualizing and Optimizing Construction Project Schedule (HSK, SYM, HSM, LSK), pp. 329–332.
- ECIR-2013-FreireMTOC #hybrid #query #scheduling
- Hybrid Query Scheduling for a Replicated Search Engine (AF, CM, NT, IO, FC), pp. 435–446.
- OOPSLA-2013-BerganCG #parallel #source code #thread
- Input-covering schedules for multithreaded programs (TB, LC, DG), pp. 677–692.
- POPL-2013-UpadrastaC #scheduling #using
- Sub-polyhedral scheduling using (unit-)two-variable-per-inequality polyhedra (RU, AC), pp. 483–496.
- SAC-2013-BusseSDMR #architecture #manycore #scheduling
- Analyzing resource interdependencies in multi-core architectures to improve scheduling decisions (AB, JHS, MD, GM, JR), pp. 1595–1602.
- SAC-2013-NunesP #scheduling #throughput #transaction
- Improving transaction abort rates without compromising throughput through judicious scheduling (AN, JP), pp. 493–494.
- SAC-2013-TeodoroCF #energy #performance #scheduling
- Energy efficiency management in computational grids through energy-aware scheduling (ST, ABdC, LGF), pp. 1163–1168.
- SAC-2013-VasquesV #algorithm #distributed #grid #scheduling
- A decentralized utility-based grid scheduling algorithm (JV, LV), pp. 619–624.
- ICSE-2013-KasiS #named #scheduling
- Cassandra: proactive conflict minimization through optimized task scheduling (BKK, AS), pp. 732–741.
- SLE-2013-SobernigSB #domain-specific language #energy #scheduling
- Developing a Domain-Specific Language for Scheduling in the European Energy Sector (SS, MS, AB), pp. 19–35.
- ASPLOS-2013-DelimitrouK #named #scheduling #semistructured data
- Paragon: QoS-aware scheduling for heterogeneous datacenters (CD, CK), pp. 77–88.
- ASPLOS-2013-JogKNMKMID #array #concurrent #named #owl #performance #scheduling #thread
- OWL: cooperative thread array aware scheduling techniques for improving GPGPU performance (AJ, OK, NCN, AKM, MTK, OM, RI, CRD), pp. 395–406.
- ASPLOS-2013-KimKJLM #coordination #scheduling #virtual machine
- Demand-based coordinated scheduling for SMP VMs (HK, SK, JJ, JL, SM), pp. 369–380.
- CGO-2013-DingZKSY #multi #scheduling
- Locality-aware mapping and scheduling for multicores (WD, YZ, MTK, JS, PY), p. 12.
- HPCA-2013-RaoWZX #manycore #optimisation #scheduling #virtual machine
- Optimizing virtual machine scheduling in NUMA multicore systems (JR, KW, XZ, CZX), pp. 306–317.
- HPDC-2013-BuRX #clustering #pipes and filters #scheduling
- Interference and locality-aware task scheduling for MapReduce applications in virtual clusters (XB, JR, CZX), pp. 227–238.
- HPDC-2013-SajjapongseWB #clustering #multi #runtime
- A preemption-based runtime to efficiently schedule multi-process applications on heterogeneous clusters with GPUs (KS, XW, MB), pp. 179–190.
- HPDC-2013-XuS0 #big data #named
- IBIS: interposed big-data I/O scheduler (YX, AS, MZ), pp. 109–110.
- HPDC-2013-YuZQYWG #game studies #gpu #named #scheduling
- VGRIS: virtualized GPU resource isolation and scheduling in cloud gaming (MY, CZ, ZQ, JY, YW, HG), pp. 203–214.
- LCTES-2013-BouakazT #data flow #graph #scheduling
- Buffer minimization in earliest-deadline first scheduling of dataflow graphs (AB, JPT), pp. 133–142.
- LCTES-2013-PorpodasC #adaptation #clustering #named #scheduling
- LUCAS: latency-adaptive unified cluster assignment and instruction scheduling (VP, MC), pp. 45–54.
- PPoPP-2013-0003CTT #configuration management #scheduling
- Work-stealing with configurable scheduling strategies (MW, DC, JLT, PT), pp. 315–316.
- PPoPP-2013-AcarCR #parallel #scheduling #source code
- Scheduling parallel programs by work stealing with private deques (UAA, AC, MR), pp. 219–228.
- PPoPP-2013-MeyerovichTAB #attribute grammar #parallel #synthesis
- Parallel schedule synthesis for attribute grammars (LAM, MET, EA, RB), pp. 187–196.
- SOSP-2013-OusterhoutWZS #distributed #latency #named #scheduling
- Sparrow: distributed, low latency scheduling (KO, PW, MZ, IS), pp. 69–84.
- CASE-2012-CaiL #algorithm #hybrid #multi #problem #scheduling #search-based
- A hybrid genetic algorithm for resource-constrained multi-project scheduling problem with resource transfer time (ZC, XL), pp. 569–574.
- CASE-2012-DimitrovB #algorithm #evaluation #reduction #scheduling #search-based
- Criteria evaluation considering the current time used by a genetic scheduling algorithm for changeover and tardiness reduction (TD, MB), pp. 425–430.
- CASE-2012-DriesselM #case study #composition #heuristic #scheduling
- An exploratory study of a decomposition heuristic for complex shop scheduling with transportation (RD, LM), pp. 413–418.
- CASE-2012-LuiP #assembly #difference #evolution #flexibility #scheduling #using
- Scheduling Flexible Assembly Lines using variants of Differential Evolution (WHVL, SGP), pp. 594–599.
- CASE-2012-MatsumotoN #approach #clustering #composition #concurrent #petri net #scheduling #tool support
- Petri net decomposition approach to deadlock-free scheduling for dual-armed cluster tools (IM, TN), pp. 194–199.
- CASE-2012-ObeidDY #constraints #health #parallel #scheduling
- Scheduling on parallel machines with time constraints and Equipment Health Factors (AO, SDP, CY), pp. 401–406.
- CASE-2012-QiaoWZ #analysis #clustering #petri net #scheduling #tool support
- Petri net-based scheduling analysis of dual-arm cluster tools with wafer revisiting (YQ, NW, MZ), pp. 206–211.
- CASE-2012-TonkeL #clustering #independence #scheduling
- Scheduling of a dual-armed cluster tool with two independent robot arms (DT, TEL), pp. 200–205.
- CASE-2012-WeiM #design #framework #order #process #scheduling
- Design of an order acceptance and scheduling module in a unified framework with product and process features (JW, YSM), pp. 968–973.
- CASE-2012-WigstromL #behaviour #scheduling
- Scheduling model for systems with complex alternative behaviour (OW, BL), pp. 587–593.
- CASE-2012-WikborgL #multi #petri net #problem #scheduling
- Scheduling of Petri nets as a multi-objective shortest path problem (UW, TEL), pp. 212–217.
- CASE-2012-YanCLWC #scheduling
- Optimization-based litho machine scheduling with load balancing and reticle expiration (BY, HYC, PBL, SW, JC), pp. 575–580.
- CASE-2012-YiLTW #framework #scheduling
- A new operational framework to job shop scheduling for reducing carbon emissions (QY, CL, YT, QW), pp. 58–63.
- DAC-2012-GrissomB #scheduling
- Path scheduling on digital microfluidic biochips (DG, PB), pp. 26–35.
- DAC-2012-RehmanSH #compilation #scheduling
- Instruction scheduling for reliability-aware compilation (SR, MS, JH), pp. 1292–1300.
- DATE-2012-ChaoCTHC #configuration management #scheduling
- Congestion-aware scheduling for NoC-based reconfigurable systems (HLC, YRC, SYT, PAH, SJC), pp. 1561–1566.
- DATE-2012-ChenMM #configuration management #manycore #online #scheduling
- Online scheduling for multi-core shared reconfigurable fabric (LC, TM, TM), pp. 582–585.
- DATE-2012-DamavandpeymaSBGC #data flow #graph #modelling
- Modeling static-order schedules in synchronous dataflow graphs (MD, SS, TB, MG, HC), pp. 775–780.
- DATE-2012-FanQ #framework #manycore #realtime #scheduling
- Harmonic semi-partitioned scheduling for fixed-priority real-time tasks on multi-core platform (MF, GQ), pp. 503–508.
- DATE-2012-FradetGP #data flow #named #parametricity
- SPDF: A schedulable parametric data-flow MoC (PF, AG, PP), pp. 769–774.
- DATE-2012-GuerraF #online #scheduling
- On-line scheduling of target sensitive periodic tasks with the gravitational task model (RG, GF), pp. 578–581.
- DATE-2012-HankendiC #energy #parallel #performance
- Reducing the energy cost of computing through efficient co-scheduling of parallel workloads (CH, AKC), pp. 994–999.
- DATE-2012-HuangBRBK #scheduling #smt
- Static scheduling of a Time-Triggered Network-on-Chip based on SMT solving (JH, JOB, AR, CB, AK), pp. 509–514.
- DATE-2012-JafariJL #analysis #scheduling #worst-case
- Worst-case delay analysis of Variable Bit-Rate flows in network-on-chip with aggregate scheduling (FJ, AJ, ZL), pp. 538–541.
- DATE-2012-MarinhoNPP #analysis #float #scheduling
- Preemption delay analysis for floating non-preemptive region scheduling (JM, VN, SMP, IP), pp. 497–502.
- DATE-2012-ShahRK #bound #scheduling #using
- Bounding WCET of applications using SDRAM with Priority Based Budget Scheduling in MPSoCs (HS, AR, AK), pp. 665–670.
- DATE-2012-SheHMC #architecture #energy #scheduling
- Scheduling for register file energy minimization in explicit datapath architectures (DS, YH, BM, HC), pp. 388–393.
- DATE-2012-YeYZX #scheduling
- Clock skew scheduling for timing speculation (RY, FY, HZ, QX), pp. 929–934.
- HT-2012-ZubiagaSAG #realtime #summary #towards #twitter
- Towards real-time summarization of scheduled events from twitter streams (AZ, DS, EA, JG), pp. 319–320.
- FASE-2012-Kahlon #reduction
- Schedule Insensitivity Reduction (VK), pp. 99–114.
- PLDI-2012-NagarakatteBMM #concurrent #debugging #detection #manycore
- Multicore acceleration of priority-based schedulers for concurrency bug detection (SN, SB, MMKM, MM), pp. 543–554.
- PLDI-2012-WuTHCY #analysis #parallel #precise #source code
- Sound and precise analysis of parallel programs through schedule specialization (JW, YT, GH, HC, JY), pp. 205–216.
- STOC-2012-AdamaszekCER #online #scheduling
- Optimal online buffer scheduling for block devices (AA, AC, ME, HR), pp. 589–598.
- FM-2012-AndreFKS #problem #robust #scheduling
- IMITATOR 2.5: A Tool for Analyzing Robustness in Scheduling Problems (ÉA, LF, UK, RS), pp. 33–36.
- ICFP-2012-FoltzerKSSJN #composition #scheduling
- A meta-scheduler for the par-monad: composable scheduling for the heterogeneous cloud (AF, AK, RS, SS, EJ, RN), pp. 235–246.
- HILT-2012-LiSRM #analysis #protocol #realtime #scheduling
- Applicability of real-time schedulability analysis on a software radio protocol (SL, FS, SR, MB), pp. 81–94.
- CAiSE-2012-KhazankinSD #crowdsourcing #predict
- Predicting QoS in Scheduled Crowdsourcing (RK, DS, SD), pp. 460–472.
- ICEIS-J-2012-PrenzelR12a #interactive #modelling #scheduling
- Models for Human Computer Interaction in Scheduling Applications (AP, GR), pp. 155–171.
- ICEIS-v1-2012-Monch #component #design #implementation #scheduling
- Design and Implementation of a Service-based Scheduling Component for Complex Manufacturing Systems (LM), pp. 284–290.
- ICEIS-v1-2012-PrenzelR #design #human-computer #interface #scheduling
- Design of Human-computer Interfaces in Scheduling Applications (AP, GR), pp. 219–228.
- SIGIR-2012-FreireMTOC #query #scheduling
- Scheduling queries across replicas (AF, CM, NT, IO, FC), pp. 1139–1140.
- SIGIR-2012-MacdonaldTO #learning #online #predict #query #scheduling
- Learning to predict response times for online query scheduling (CM, NT, IO), pp. 621–630.
- OOPSLA-2012-HuangZ12a #concurrent #execution #source code
- Execution privatization for scheduler-oblivious concurrent programs (JH, CZ), pp. 737–752.
- SAC-2012-BaroBCNP #multi #scheduling
- Off-line (Optimal) multiprocessor scheduling of dependent periodic tasks (JB, FB, MC, EN, CP), pp. 1815–1820.
- SAC-2012-BhattiBA #approach #manycore #realtime #scheduling
- A semi-partitioned real-time scheduling approach for periodic task systems on multicore platforms (MKB, CB, MA), pp. 1594–1601.
- SAC-2012-ChoeYYR #algorithm #automation #realtime #scheduling #search-based #using
- Real-time scheduling of twin stacking cranes in an automated container terminal using a genetic algorithm (RC, HY, YY, KRR), pp. 238–243.
- SAC-2012-FahmyRJ #implementation #interface #kernel #linux #programming #realtime #scheduling #thread
- Implementing distributable real-time threads in the Linux kernel: programming interface and scheduling support (SFF, BR, EDJ), pp. 1771–1778.
- SAC-2012-Gonzalez-FerezPC #automation #named #scheduling
- DADS: dynamic and automatic disk scheduling (PGF, JP, TC), pp. 1759–1764.
- SAC-2012-LeeKP #search-based
- A genetic scheduler for electric vehicle charging (JL, HJK, GLP), pp. 1843–1844.
- SAC-2012-NobakhtBJS #deployment #programming #scheduling
- Programming and deployment of active objects with application-level scheduling (BN, FSdB, MMJ, RS), pp. 1883–1888.
- SAC-2012-TsaiC #3d #manycore #realtime #scheduling
- Thermal-aware real-time task scheduling for three-dimensional multicore chip (THT, YSC), pp. 1618–1624.
- ASPLOS-2012-JaleelNSSE #named #scheduling
- CRUISE: cache replacement and utility-aware scheduling (AJ, HHNa, SS, SCSJ, JSE), pp. 249–260.
- ASPLOS-2012-JoaoSMP #identification #parallel #scheduling #thread
- Bottleneck identification and scheduling in multithreaded applications (JAJ, MAS, OM, YNP), pp. 223–234.
- ASPLOS-2012-LeeS #architecture #scheduling #using
- Region scheduling: efficiently using the cache architectures via page-level affinity (ML, KS), pp. 451–462.
- HPCA-2012-MukundanM #configuration management #memory management #multi #named #self
- MORSE: Multi-objective reconfigurable self-optimizing memory scheduler (JM, JFM), pp. 65–76.
- HPDC-2012-TanMZ #pipes and filters
- Coupling scheduler for MapReduce/Hadoop (JT, XM, LZ), pp. 129–130.
- HPDC-2012-XuGRKKX #cpu #named #scheduling #slicing #virtual machine
- vSlicer: latency-aware virtual machine scheduling via differentiated-frequency CPU slicing (CX, SG, PNR, AK, RRK, DX), pp. 3–14.
- LCTES-2012-HuangZX #architecture #clustering #embedded #realtime
- WCET-aware re-scheduling register allocation for real-time embedded systems with clustered VLIW architecture (YH, MZ, CJX), pp. 31–40.
- PPoPP-2012-TardieuWL #parallel
- A work-stealing scheduler for X10’s task parallelism with suspension (OT, HW, HL), pp. 267–276.
- ICLP-2012-HoosKSS #named #scheduling
- aspeed: ASP-based Solver Scheduling (HH, RK, TS, MTS), pp. 176–187.
- CASE-2011-Bonhomme #petri net #realtime #scheduling
- A symbolic schedulability technique of real-time systems modeled by P-Time Petri nets (PB), pp. 582–587.
- CASE-2011-CaoPW #scheduling
- A drum-buffer-rope based scheduling method for semiconductor manufacturing system (ZC, YP, YW), pp. 120–125.
- CASE-2011-FantiSU #constraints #problem #scheduling #symmetry #using
- Solving scheduling problems in distribution centers using symmetry breaking constraints (MPF, GS, WU), pp. 58–65.
- CASE-2011-FrohlichS #multi #scheduling
- Transient multiple hoist scheduling of consecutive cyclic schedules (RF, SCS), pp. 357–362.
- CASE-2011-KalinovcicPBB #algorithm #multi #scheduling
- Modified Banker’s algorithm for scheduling in multi-AGV systems (LK, TP, SB, VB), pp. 351–356.
- CASE-2011-KimL #clustering #constraints #scheduling #tool support
- Scheduling of cluster tools with ready time constraints for small lot production (HJK, TEL), pp. 96–101.
- CASE-2011-NishiYI #approach #generative #problem #scheduling
- Column generation approach to ship scheduling problems for international crude oil transportation (TN, SY, TI), pp. 468–473.
- CASE-2011-PinhaQC #scheduling
- Optimal scheduling of a repair shipyard based on Supervisory Control Theory (DCP, MHdQ, JERC), pp. 39–44.
- CASE-2011-RedjemKXM #coordination #health #multi #scheduling
- Coordinated multi-criteria scheduling of caregivers in home health Care Services (RR, SK, XX, EM), pp. 519–524.
- CASE-2011-SadkiXC #scheduling
- Appointment scheduling of oncology outpatients (AS, XX, FC), pp. 513–518.
- CASE-2011-Tanaka #approach #problem #scheduling
- A unified approach for the scheduling problem with rejection (ST), pp. 369–374.
- CASE-2011-WigstromL #energy #optimisation #scheduling
- Energy optimization of trajectories for high level scheduling (OW, BL), pp. 654–659.
- CASE-2011-YanCLWC #multi #scheduling
- Optimization-based litho machine scheduling with multiple reticles and setups (BY, HYC, PBL, SW, JC), pp. 114–119.
- DAC-2011-HuangYX #multi #scheduling
- Customer-aware task allocation and scheduling for multi-mode MPSoCs (LH, RY, QX), pp. 387–392.
- DAC-2011-IqbalSH #dependence #fault #monte carlo #named #power management #probability #scheduling
- SEAL: soft error aware low power scheduling by Monte Carlo state space under the influence of stochastic spatial and temporal dependencies (NI, MAS, JH), pp. 134–139.
- DAC-2011-LiLZ #multi #scheduling
- Optimal multi-domain clock skew scheduling (LL, YL, HZ), pp. 152–157.
- DAC-2011-SchneiderGCBEP #on the #quantifier
- On the quantification of sustainability and extensibility of FlexRay schedules (RS, DG, SC, UDB, PE, ZP), pp. 375–380.
- DAC-2011-WuWFT #distributed #manycore #scheduling #simulation
- A high-parallelism distributed scheduling mechanism for multi-core instruction-set simulation (MHW, PCW, CYF, RST), pp. 339–344.
- DATE-2011-AnsaloniPTD #array #configuration management #scheduling
- Slack-aware scheduling on Coarse Grained Reconfigurable Arrays (GA, LP, KT, ND), pp. 1513–1516.
- DATE-2011-ChiuSH #constraints #pipes and filters #precedence #realtime #streaming #synthesis
- Pipeline schedule synthesis for real-time streaming tasks with inter/intra-instance precedence constraints (YSC, CSS, SHH), pp. 1321–1326.
- DATE-2011-KongYD #clustering #energy #multi #realtime #scheduling
- Energy-efficient scheduling of real-time tasks on cluster-based multicores (FK, WY, QD), pp. 1135–1140.
- DATE-2011-LukasiewyczCM #concept #network #scheduling
- FlexRay switch scheduling — A networking concept for electric vehicles (ML, SC, PM), pp. 76–81.
- DATE-2011-Niu #embedded #energy #realtime #scheduling
- System-level energy-efficient scheduling for hard real-time embedded systems (LN), pp. 281–284.
- DATE-2011-SchenkelaarsVG #network #scheduling
- Optimal scheduling of switched FlexRay networks (TS, BV, KG), pp. 926–931.
- DATE-2011-WangWT #approach #modelling #named #performance #scheduling #simulation
- DOM: A Data-dependency-Oriented Modeling approach for efficient simulation of OS preemptive scheduling (PCW, MHW, RST), pp. 335–340.
- DATE-2011-WannerBZAGS #embedded #scheduling #variability
- Variability-aware duty cycle scheduling in long running embedded sensing systems (LFW, RB, SZ, CA, PG, MBS), pp. 131–136.
- DATE-2011-WinterF #runtime #scheduling
- Guaranteed service virtual channel allocation in NoCs for run-time task scheduling (MW, GF), pp. 419–424.
- DATE-2011-ZhiLZYZZ #algorithm #multi #performance #scheduling
- An efficient algorithm for multi-domain clock skew scheduling (YZ, WSL, HZ, CY, HZ, XZ), pp. 1364–1369.
- SIGMOD-2011-KllapiSTI #optimisation
- Schedule optimization for data processing flows on the cloud (HK, ES, MMT, YEI), pp. 289–300.
- VLDB-2011-ChiMH #incremental #linear #named #scheduling
- iCBS: Incremental Costbased Scheduling under Piecewise Linear SLAs (YC, HJM, HH), pp. 563–574.
- ITiCSE-2011-ShafferE #performance #scheduling #student
- Scheduling and student performance (CAS, SHE), p. 331.
- ICPC-2011-ZibranR #approach #constraints #programming #refactoring #scheduling
- Conflict-Aware Optimal Scheduling of Code Clone Refactoring: A Constraint Programming Approach (MFZ, CKR), pp. 266–269.
- SCAM-2011-ZibranR #approach #constraints #programming #refactoring #scheduling
- A Constraint Programming Approach to Conflict-Aware Optimal Scheduling of Prioritized Code Clone Refactoring (MFZ, CKR), pp. 105–114.
- PLDI-2011-BestMMRFB #scheduling
- Synchronization via scheduling: techniques for efficiently managing shared state (MJB, SM, CM, MR, AF, AB), pp. 640–652.
- STOC-2011-Svensson
- Santa Claus schedules jobs on unrelated machines (OS), pp. 617–626.
- ICALP-v2-2011-HalldorssonM #bound #distributed #scheduling
- Nearly Optimal Bounds for Distributed Wireless Scheduling in the SINR Model (MMH, PM), pp. 625–636.
- LATA-2011-ReidenbachS #memory management #scheduling #word
- Finding Shuffle Words That Represent Optimal Scheduling of Shared Memory Access (DR, MLS), pp. 465–476.
- CHI-2011-CramerHTYH #interactive #student #visual notation
- Classroom-based assistive technology: collective use of interactive visual schedules by students with autism (MC, SHH, MT, MTY, GRH), pp. 1–10.
- CHI-2011-LeshedS #case study #experience #quote #tool support
- “I lie to myself that I have freedom in my own schedule”: productivity tools and experiences of busyness (GL, PS), pp. 905–914.
- CHI-2011-MartinH #coordination #named #scheduling #social
- Kairoscope: managing time perception and scheduling through social event coordination (RM, HH), pp. 1969–1978.
- CSCW-2011-JunuzovicD #collaboration #scheduling
- Scheduling in variable-core collaborative systems (SJ, PD), pp. 543–552.
- HCI-MIIE-2011-TsaiSL #flexibility #mobile
- Mobile Reminder for Flexible and Safe Medication Schedule for Home Users (PHT, CSS, JWSL), pp. 107–116.
- AdaEurope-2011-CarnevaliLPV #approach #design #formal method #scheduling #verification
- A Formal Approach to Design and Verification of Two-Level Hierarchical Scheduling Systems (LC, GL, AP, EV), pp. 118–131.
- ICEIS-v1-2011-HaoSHS #algorithm #in the cloud #modelling #optimisation #scheduling
- A Cloud Computing Model based on Hadoop with an Optimization of Its Task Scheduling Algorithms (YH, MS, JH, JS), pp. 524–528.
- ICEIS-v4-2011-YangLH #multi #network #performance #scheduling
- QPF Scheduling Scheme for Performance Improvements of Integrated Multimedia Applications over 3.5G Network (SJY, LCL, YMH), pp. 5–12.
- CIKM-2011-WahabzadaKPB #performance #scheduling
- More influence means less work: fast latent dirichlet allocation by influence scheduling (MW, KK, AP, CB), pp. 2273–2276.
- OOPSLA-2011-AcarCR #parallel #scheduling
- Oracle scheduling: controlling granularity in implicitly parallel languages (UAA, AC, MR), pp. 499–518.
- POPL-2011-EmmiQR #bound #scheduling
- Delay-bounded scheduling (ME, SQ, ZR), pp. 411–422.
- SAC-2011-CordovillaBNP #multi #scheduling
- Multiprocessor schedulability analyser (MC, FB, EN, CP), pp. 735–741.
- SAC-2011-Jaghoori #multi #question #scheduling
- From nonpreemptive to preemptive scheduling: from single-processor to multi-processor? (MMJ), pp. 717–722.
- SAC-2011-KongGDY #energy #parallel #realtime #scheduling
- Energy-efficient scheduling for parallel real-time tasks based on level-packing (FK, NG, QD, WY), pp. 635–640.
- SAC-2011-LeeLS #manycore #scheduling
- Preemptibility-aware responsive multi-core scheduling (JL, GL, SbS), pp. 748–749.
- SAC-2011-LeePKKS #grid #power management #reduction #scheduling #smarttech
- Power consumption scheduling for peak load reduction in smart grid homes (JL, GLP, SWK, HJK, COS), pp. 584–588.
- SAC-2011-LiuQR #online #realtime #scheduling
- On-line scheduling of real-time services with profit and penalty (SL, GQ, SR), pp. 1476–1481.
- SAC-2011-ManyD #analysis #evaluation #fault tolerance #scheduling
- Fault tolerance evaluation and schedulability analysis (FM, DD), pp. 729–734.
- SAC-2011-ShinLSL #concurrent #monitoring #multi #predict #scheduling #thread
- Predictable multithread scheduling with cycle-accurate thread progress monitor (YS, SL, MS, SL), pp. 627–628.
- SAC-2011-YouYH #framework #pipes and filters
- A load-aware scheduler for MapReduce framework in heterogeneous cloud environments (HHY, CCY, JLH), pp. 127–132.
- ASPLOS-2011-NguyenP #algorithm #concurrent
- Synthesizing concurrent schedulers for irregular algorithms (DN, KP), pp. 333–344.
- CC-2011-Brunthaler #interpreter #scheduling
- Interpreter Instruction Scheduling (SB), pp. 164–178.
- CGO-2011-LiuZDK #manycore #scheduling
- On-chip cache hierarchy-aware tile scheduling for multicore machines (JL, YZ, WD, MTK), pp. 161–170.
- HPCA-2011-BlakeDM #scheduling #transaction
- Bloom Filter Guided Transaction Scheduling (GB, RGD, TNM), pp. 75–86.
- HPCA-2011-JiangMZIFSMBD #named #scheduling #symmetry
- ACCESS: Smart scheduling for asymmetric cache CMPs (XJ, AKM, LZ, RI, ZF, SS, SM, PB, CRD), pp. 527–538.
- HPDC-2011-KangCWSW #pipes and filters
- Enhancement of Xen’s scheduler for MapReduce workloads (HK, YC, JLW, RS, JW), pp. 251–262.
- HPDC-2011-WengLYL #adaptation #scheduling #virtual machine
- Dynamic adaptive scheduling for virtual machines (CW, QL, LY, ML), pp. 239–250.
- HPDC-2011-ZhangLWK #data access #energy #scheduling
- Software-directed data access scheduling for reducing disk energy consumption (YZ, JL, EHW, MTK), pp. 281–282.
- LCTES-2011-ChattopadhyayR #multi
- Static bus schedule aware scratchpad allocation in multiprocessors (SC, AR), pp. 11–20.
- LCTES-2011-JangKLKYKKR #architecture #clustering #configuration management
- An instruction-scheduling-aware data partitioning technique for coarse-grained reconfigurable architectures (CJ, JK, JL, HSK, DY, SK, HK, SR), pp. 151–160.
- LCTES-2011-VirletZGKGP #realtime #scheduling
- Scheduling of stream-based real-time applications for heterogeneous systems (BV, XZ, JPG, BK, MJG, DAP), pp. 1–10.
- SOSP-2011-CuiWGGY #multi #performance #thread
- Efficient deterministic multithreading through schedule relaxation (HC, JW, JG, HG, JY), pp. 337–351.
- SOSP-2011-VeeraraghavanCFN #detection #using
- Detecting and surviving data races using complementary schedules (KV, PMC, JF, SN), pp. 369–384.
- CASE-2010-ChanR #clustering #estimation #multi #on the #scheduling #tool support
- On gradient estimation of scheduling for multi-cluster tools with general robot moving times (WK(C, TMR), pp. 112–117.
- CASE-2010-DriesselHMS #architecture #assessment #heuristic #parallel #performance #scheduling
- A parallel shifting bottleneck heuristic for scheduling complex job shops: Architecture and performance assessment (RD, UH, LM, WS), pp. 81–86.
- CASE-2010-FantiSU #constraints #scheduling
- Scheduling the internal operations in distribution centers with buffer constraints (MPF, GS, WU), pp. 75–80.
- CASE-2010-FengZL #evaluation #multi #performance #policy #scheduling
- Performance evaluation of a multi-product system with setups and dynamic scheduling policies (WF, LZ, NL), pp. 960–965.
- CASE-2010-FrohlichS #automation #constraints #matrix #modelling #problem #scheduling #using
- Relation matrices for automated MILP modeling of scheduling problems using temporal constraints (RF, SCS), pp. 69–74.
- CASE-2010-JingL #assembly #hybrid #scheduling
- A MILP-based batch scheduling for two-stage hybrid flowshop with sequence-dependent setups in semiconductor assembly and test manufacturing (XJ, ZL), pp. 87–92.
- CASE-2010-LeeL #architecture #clustering #scheduling #tool support
- An open scheduling architecture for cluster tools (JHL, TEL), pp. 420–425.
- CASE-2010-MazierXS #scheduling
- Scheduling inpatient admission under high demand of emergency patients (AM, XX, MS), pp. 792–797.
- CASE-2010-SunCL #algorithm #scheduling #using
- Scheduling of steel-making and continuous casting system using the surrogate subgradient algorithm for lagrangian relaxation (LS, TC, PBL), pp. 885–890.
- CASE-2010-VergnanoTLFPYBL #energy #optimisation #scheduling
- Embedding detailed robot energy optimization into high-level scheduling (AV, CT, BL, PF, MP, CY, SB, FL), pp. 386–392.
- CASE-2010-WuZ #bound #clustering #petri net #process #scheduling #tool support
- Petri net-based scheduling of time-constrained dual-arm cluster tools with bounded activity time variation (NW, MZ), pp. 465–470.
- DAC-2010-HuangX #performance #process #scheduling
- Performance yield-driven task allocation and scheduling for MPSoCs under process variation (LH, QX), pp. 326–331.
- DAC-2010-YuVH #adaptation #multi #realtime #scheduling
- Leakage-aware dynamic scheduling for real-time adaptive applications on multiprocessor systems (HY, BV, YH), pp. 493–498.
- DAC-2010-ZitterellS #approach #energy #online #probability #realtime #scheduling
- A probabilistic and energy-efficient scheduling approach for online application in real-time systems (TZ, CS), pp. 42–47.
- DATE-2010-AnastasiaA #energy #image #refinement #scheduling #trade-off
- Scheduling and energy-distortion tradeoffs with operational refinement of image processing (DA, YA), pp. 1719–1724.
- DATE-2010-AyoubSR #multi #named #scheduling
- GentleCool: Cooling aware proactive workload scheduling in multi-machine systems (RZA, SS, TSR), pp. 295–298.
- DATE-2010-BonfiettiBLM #approach #manycore #performance #scheduling
- An efficient and complete approach for throughput-maximal SDF allocation and scheduling on multi-core platforms (AB, LB, ML, MM), pp. 897–902.
- DATE-2010-GhosalZNB #design #nondeterminism #parametricity #robust
- Computing robustness of FlexRay schedules to uncertainties in design parameters (AG, HZ, MDN, YBH), pp. 550–555.
- DATE-2010-GuFP #compilation #hardware #scheduling
- Path-based scheduling in a hardware compiler (RG, AF, RNP), pp. 1317–1320.
- DATE-2010-HuangX10a #constraints #energy #multi #reliability #scheduling
- Energy-efficient task allocation and scheduling for multi-mode MPSoCs under lifetime reliability constraint (LH, QX), pp. 1584–1589.
- DATE-2010-KootiBLB #configuration management #embedded #realtime #scheduling
- Transition-aware real-time task scheduling for reconfigurable embedded systems (HK, EB, SL, LB), pp. 232–237.
- DATE-2010-LiuLW #energy #fault tolerance #performance #realtime #scheduling
- Scheduling for energy efficiency and fault tolerance in hard real-time systems (YL, HL, KW), pp. 1444–1449.
- DATE-2010-LongM10a #dependence #scheduling
- Inversed Temperature Dependence aware clock skew scheduling for sequential circuits (JL, SOM), pp. 1657–1660.
- DATE-2010-RavinagarajanDR #health #monitoring #scheduling
- DVFS based task scheduling in a harvesting WSN for Structural Health Monitoring (AR, DD, TSR), pp. 1518–1523.
- DATE-2010-RoxE #correlation
- Exploiting inter-event stream correlations between output event streams of non-preemptively scheduled tasks (JR, RE), pp. 226–231.
- DATE-2010-Scholzel #detection #fault #performance
- HW/SW co-detection of transient and permanent faults with fast recovery in statically scheduled data paths (MS), pp. 723–728.
- DATE-2010-TieDWC #performance #reduction #scheduling
- Dual-Vth leakage reduction with Fast Clock Skew Scheduling Enhancement (MT, HD, TW, XC), pp. 520–525.
- DATE-2010-WangXY #scheduling
- Reuse-aware modulo scheduling for stream processors (LW, JX, XY), pp. 1112–1117.
- DATE-2010-WuM #scheduling
- Clock skew scheduling for soft-error-tolerant sequential circuits (KCW, DM), pp. 717–722.
- DATE-2010-YangCTK #energy #realtime #scheduling
- Energy-efficient real-time task scheduling with temperature-dependent leakage (CYY, JJC, LT, TWK), pp. 9–14.
- FASE-2010-XiaoOWL #development #scheduling
- Dynamic Resource Scheduling in Disruption-Prone Software Development Environments (JX, LJO, QW, ML), pp. 107–122.
- STOC-2010-Svensson #precedence #scheduling
- Conditional hardness of precedence constrained scheduling on identical machines (OS), pp. 745–754.
- ICALP-v1-2010-BansalK #problem #scheduling
- Inapproximability of Hypergraph Vertex Cover and Applications to Scheduling Problems (NB, SK), pp. 250–261.
- ICALP-v1-2010-BansalKN #algorithm #scalability #scheduling
- Better Scalable Algorithms for Broadcast Scheduling (NB, RK, VN), pp. 324–335.
- ICALP-v1-2010-EisenbrandHNSVW #realtime #scheduling
- Scheduling Periodic Tasks in a Hard Real-Time Environment (FE, NH, MN, MS, JV, AW), pp. 299–311.
- ICALP-v1-2010-GuptaKP #scheduling
- Scalably Scheduling Power-Heterogeneous Processors (AG, RK, KP), pp. 312–323.
- ICALP-v2-2010-BrazdilEKL #scheduling
- Space-Efficient Scheduling of Stochastically Generated Tasks (TB, JE, SK, ML), pp. 539–550.
- AdaEurope-2010-AnderssonP #ada #algorithm #implementation #manycore #realtime #scheduling #using
- Implementing Multicore Real-Time Scheduling Algorithms Based on Task Splitting Using Ada 2012 (BA, LMP), pp. 54–67.
- AdaEurope-2010-MartinezBD #component #realtime #scheduling
- Scheduling Configuration of Real-Time Component-Based Applications (PLM, LB, JMD), pp. 181–195.
- AdaEurope-2010-White #ada #hardware #scheduling #using
- Using Hardware Support for Scheduling with Ada (RW), pp. 125–138.
- SEKE-2010-Suarez-FigueroaGMV #development #ontology #scheduling
- gOntt, a Tool for Scheduling and Executing Ontology Development Projects (MdCSF, AGP, ÓMG, MV), pp. 614–619.
- QAPL-2010-RabeS #game studies #markov
- Optimal Time-Abstract Schedulers for CTMDPs and Markov Games (MNR, SS), pp. 144–158.
- SAC-2010-BaiXL #virtual machine
- Task-aware based co-scheduling for virtual machine system (YB, CX, ZL), pp. 181–188.
- SAC-2010-ChenT #energy #multi #scheduling
- Energy-efficient scheduling on homogeneous multiprocessor platforms (JJC, LT), pp. 542–549.
- SAC-2010-KimKPT #framework #hybrid #realtime #scheduling
- Integrating real-time hybrid task scheduling into a sensor node platform (TK, BK, EKP, ST), pp. 737–741.
- SAC-2010-LvLLC #multi #on-demand #realtime #scheduling
- Profit-based on-demand broadcast scheduling of real-time multi-item requests (JL, VCSL, ML, EC), pp. 580–584.
- SAC-2010-Rooney #scheduling
- Scheduling intense applications most “surprising” first (SR), pp. 2077–2084.
- SAC-2010-TeixeiraG #algorithm #network #scheduling
- Uplink scheduling algorithm with dynamic polling management in IEEE 802.16 broadband wireless networks (MAT, PRG), pp. 601–602.
- SAC-2010-ToledoOOP #algorithm #parallel #problem #scheduling #search-based
- Parallel genetic algorithm approaches applied to solve a synchronized and integrated lot sizing and scheduling problem (CFMT, LdO, RRRdO, MRP), pp. 1148–1152.
- SAC-2010-WeiYKHC #energy #manycore #realtime #scheduling
- Energy-efficient real-time scheduling of multimedia tasks on multi-core processors (YHW, CYY, TWK, SHH, YHC), pp. 258–262.
- SAC-2010-YuRCW #execution #scheduling
- Profit and penalty aware (PP-aware) scheduling for tasks with variable task execution time (YY, SR, NC, XW), pp. 334–339.
- ASPLOS-2010-BurckhardtKMN #debugging #probability #random
- A randomized scheduler with probabilistic guarantees of finding bugs (SB, PK, MM, SN), pp. 167–178.
- ASPLOS-2010-EyermanE #modelling #probability #scheduling #smt
- Probabilistic job symbiosis modeling for SMT processor scheduling (SE, LE), pp. 91–102.
- ASPLOS-2010-JohnsonSAM #scheduling
- Decoupling contention management from scheduling (RJ, RS, AA, TCM), pp. 117–128.
- ASPLOS-2010-SanchezYK #architecture #flexibility #scheduling
- Flexible architectural support for fine-grain scheduling (DS, RMY, CK), pp. 311–322.
- ASPLOS-2010-ZhuravlevBF #manycore #scheduling
- Addressing shared resource contention in multicore processors via scheduling (SZ, SB, AF), pp. 129–142.
- CGO-2010-WangCDLFY #adaptation #scheduling
- An adaptive task creation strategy for work-stealing scheduling (LW, HC, YD, FL, XF, PCY), pp. 266–277.
- HPCA-2010-KimHMH #algorithm #memory management #multi #named #scalability #scheduling
- ATLAS: A scalable and high-performance scheduling algorithm for multiple memory controllers (YK, DH, OM, MHB), pp. 1–12.
- HPDC-2010-HuLZHX #clustering #manycore #scheduling #virtual machine
- I/O scheduling model of virtual machine based on multi-core dynamic partitioning (YH, XL, JZ, JH, LX), pp. 142–154.
- HPDC-2010-SonmezYAIE #analysis #clustering #multi #performance #scheduling #workflow
- Performance analysis of dynamic workflow scheduling in multicluster grids (OOS, NY, SA, AI, DHJE), pp. 49–60.
- HPDC-2010-YuanYWZ #named #parallel #predict #scheduling #strict
- PV-EASY: a strict fairness guaranteed and prediction enabled scheduler in parallel job scheduling (YY, GY, YW, WZ), pp. 240–251.
- OSDI-2010-CuiWTY #multi #thread
- Stable Deterministic Multithreading through Schedule Memoization (HC, JW, CcT, JY), pp. 207–221.
- OSDI-2010-GulatiMV #named #scheduling #throughput #variability
- mClock: Handling Throughput Variability for Hypervisor IO Scheduling (AG, AM, PJV), pp. 437–450.
- OSDI-2010-SoaresS #flexibility #named #scheduling
- FlexSC: Flexible System Call Scheduling with Exception-Less System Calls (LS, MS), pp. 33–46.
- PPoPP-2010-GuoZCS #adaptation #manycore #named #scalability
- SLAW: a scalable locality-aware adaptive work-stealing scheduler for multi-core systems (YG, YZ, VC, VS), pp. 341–342.
- PPoPP-2010-MaldonadoMFSHFLM #memory management #scheduling #transaction
- Scheduling support for transactional memory contention management (WM, PM, PF, AS, DH, AF, JLL, GM), pp. 79–90.
- PPoPP-2010-TzannesCBV #adaptation #lazy evaluation #runtime
- Lazy binary-splitting: a run-time adaptive work-stealing scheduler (AT, GCC, RB, UV), pp. 179–190.
- CASE-2009-DInnocenzoWAIJP #algorithm #scalability #scheduling
- Scalable scheduling algorithms for wireless networked control systems (AD, GW, RA, AJI, KHJ, GJP), pp. 409–414.
- CASE-2009-GirishJ #algorithm #flexibility #optimisation #problem #scheduling
- A particle swarm optimization algorithm for flexible job shop scheduling problem (BSG, NJ), pp. 298–303.
- CASE-2009-LiQW #parallel #scheduling
- ACO-based scheduling of parallel batch processing machines to minimize the total weighted tardiness (LL, FQ, QW), pp. 280–285.
- CASE-2009-WuCCZ #approach #clustering #novel #scheduling #tool support
- A novel approach to scheduling of single-arm cluster tools with wafer revisiting (NW, FC, CC, MZ), pp. 567–572.
- CASE-2009-YungPY #flexibility #multi #scheduling
- Multi-objective ACO for integrated scheduling of machines and material handling equipment in flexible manufacturing systems (TWY, SGP, MY), pp. 304–309.
- DAC-2009-ChenJ #manycore #performance #scheduling
- Efficient program scheduling for heterogeneous multi-core processors (JC, LKJ), pp. 927–930.
- DAC-2009-LiuWQ #adaptation #algorithm #energy #realtime #scheduling
- An adaptive scheduling and voltage/frequency selection algorithm for real-time energy harvesting systems (SL, QW, QQ), pp. 782–787.
- DAC-2009-PlishkerSB #data flow #effectiveness #scheduling
- Mode grouping for more effective generalized scheduling of dynamic dataflow applications (WP, NS, SSB), pp. 923–926.
- DAC-2009-ZengZNGGS #optimisation #scheduling #using
- Scheduling the FlexRay bus using optimization techniques (HZ, WZ, MDN, AG, PG, ALSV), pp. 874–877.
- DATE-2009-BaeMV #scheduling
- Exploiting clock skew scheduling for FPGA (SB, PM, NV), pp. 1524–1529.
- DATE-2009-CongG #energy #multi #performance #scheduling
- Energy efficient multiprocessor task scheduling under input-dependent variation (JC, KG), pp. 411–416.
- DATE-2009-HuangYX #scheduling
- Lifetime reliability-aware task allocation and scheduling for MPSoC platforms (LH, FY, QX), pp. 51–56.
- DATE-2009-LombardiMB #clustering #manycore #realtime #robust #scheduling
- Robust non-preemptive hard real-time scheduling for clustered multicore platforms (ML, MM, LB), pp. 803–808.
- DATE-2009-MohammadZadehMJZ #multi #network
- Multi-domain clock skew scheduling-aware register placement to optimize clock distribution network (NM, MM, AJ, MSZ), pp. 833–838.
- DATE-2009-PelcatMAN #architecture #manycore #scalability
- Scalable compile-time scheduler for multi-core architectures (MP, PM, SA, JFN), pp. 1552–1555.
- DATE-2009-PlishkerSB #approach #data flow #scheduling
- A generalized scheduling approach for dynamic dataflow applications (WP, NS, SSB), pp. 111–116.
- DATE-2009-SamiiCEP #distributed #embedded #scheduling #synthesis
- Integrated scheduling and synthesis of control applications on distributed embedded systems (SS, AC, PE, ZP), pp. 57–62.
- DATE-2009-StoimenovPT #realtime #reliability #scheduling
- Reliable mode changes in real-time systems with fixed priority or EDF scheduling (NS, SP, LT), pp. 99–104.
- DATE-2009-ViehlPBR #analysis #performance #scheduling
- White box performance analysis considering static non-preemptive software scheduling (AV, MP, OB, WR), pp. 513–518.
- DATE-2009-YangCKT #approximate #energy #multi #realtime #scheduling
- An approximation scheme for energy-efficient scheduling of real-time tasks in heterogeneous multiprocessor systems (CYY, JJC, TWK, LT), pp. 694–699.
- DATE-2009-YangH #parallel #pipes and filters #scheduling
- Pipelined data parallel task mapping/scheduling technique for MPSoC (HY, SH), pp. 69–74.
- DATE-2009-YangO #adaptation #towards
- Towards no-cost adaptive MPSoC static schedules through exploitation of logical-to-physical core mapping latitude (CY, AO), pp. 63–68.
- DATE-2009-YeoK #behaviour #manycore
- Temperature-aware scheduler based on thermal behavior grouping in multicore systems (IY, EJK), pp. 946–951.
- DATE-2009-YiHZEA #architecture #manycore #scheduling
- An ILP formulation for task mapping and scheduling on multi-core architectures (YY, WH, XZ, ATE, TA), pp. 33–38.
- DATE-2009-ZhuSJ #architecture #cpu #hybrid #realtime #scheduling #streaming
- Buffer minimization of real-time streaming applications scheduling on hybrid CPU/FPGA architectures (JZ, IS, AJ), pp. 1506–1511.
- FASE-2009-JahierHR #inheritance #modelling #validation
- Synchronous Modeling and Validation of Priority Inheritance Schedulers (EJ, NH, PR), pp. 140–154.
- FoSSaCS-2009-ChatzikokolakisNP #bisimulation
- Bisimulation for Demonic Schedulers (KC, GN, DP), pp. 318–332.
- ICALP-v1-2009-Jansen #constant #scheduling #using
- An EPTAS for Scheduling Jobs on Uniform Processors: Using an MILP Relaxation with a Constant Number of Integral Variables (KJ), pp. 562–573.
- ICALP-v1-2009-MastrolilliS #bound #scheduling
- Improved Bounds for Flow Shop Scheduling (MM, OS), pp. 677–688.
- IFM-2009-VossSE #network #scheduling
- SAL-Based Symbolic Scheduling in Time-Triggered Networks (SV, MS, KE), pp. 200–214.
- HCI-VAD-2009-ArditoBCLS #approach #scheduling #visualisation
- An Information Visualization Approach to Hospital Shifts Scheduling (CA, PB, MFC, RL, ALS), pp. 439–447.
- HIMI-II-2009-KarashimaH #case study #information management #scheduling
- Implications for Developing Information System on Nursing Administration — Case Study on Nurse Scheduling System - (MK, NH), pp. 529–538.
- AdaEurope-2009-BurnsWZ #ada #analysis #implementation #scheduling
- Combining EDF and FP Scheduling: Analysis and Implementation in Ada 2005 (AB, AJW, FZ), pp. 119–133.
- SIGAda-2009-TijeroG #ada #experience #middleware #policy #scheduling
- Experience in integrating interchangeable scheduling policies into a distribution middleware for Ada (HPT, JJG), pp. 73–78.
- ICEIS-DISI-2009-Perez-CebrerosMC #algorithm #parallel #query #scheduling
- PSO-based Resource Scheduling Algorithm for Parallel Query Processing on Grids (APC, GML, NCC), pp. 131–137.
- KDD-2009-BackstromKK #optimisation #problem #scheduling #web
- Optimizing web traffic via the media scheduling problem (LB, JMK, RK), pp. 89–98.
- SEKE-2009-XieWXWY #named #scheduling
- PP-HAS: A Task Priority Based Preemptive Human Resource Scheduling Method (LX, QW, JX, YW, YY), pp. 655–660.
- QAPL-2009-GiroD #distributed #on the #power of #probability
- On the Expressive Power of Schedulers in Distributed Probabilistic Systems (SG, PRD), pp. 45–71.
- SAC-2009-BatistaDF #grid #network #robust
- Robust scheduler for grid networks (DMB, ACD, NLSdF), pp. 35–39.
- SAC-2009-LaiRC #embedded #on the #realtime #scheduling
- On scheduling soft real-time tasks with lock-free synchronization for embedded devices (SL, BR, HC), pp. 1685–1686.
- SAC-2009-LeePR #ad hoc #mobile #network #realtime
- A real-time message scheduler support for dual-sink mobile ad-hoc sensor networks (JL, GLP, SuR), pp. 305–309.
- SAC-2009-MaLWW #query #realtime #scheduling
- Real-time scheduling for continuous queries with deadlines (LM, XL, YW, HW), pp. 1516–1517.
- SAC-2009-MoallemL #distributed #grid #scheduling #using
- Using artificial life techniques for distributed grid job scheduling (AM, SAL), pp. 1091–1097.
- SAC-2009-MonacoNP #architecture #latency #orthogonal #realtime #requirements #scheduling
- An orthogonal real-time scheduling architecture for responsiveness QoS requirements in SOA environments (FJM, MN, MLMP), pp. 1990–1995.
- SAC-2009-OrdinezDSO #behaviour #resource management #scheduling
- Resource sharing in behavioral based scheduling (LO, DD, RMS, JO), pp. 1972–1978.
- CC-2009-Abu-MahmeedMBKRHARK #scheduling
- Scheduling Tasks to Maximize Usage of Aggregate Variables in Place (SAM, CM, ZB, KK, KR, KH, PA, SR, JK), pp. 204–219.
- CC-2009-FarooqJ #architecture #data flow #scheduling
- Loop-Aware Instruction Scheduling with Dynamic Contention Tracking for Tiled Dataflow Architectures (MUF, LKJ), pp. 190–203.
- LCTES-2009-CaspiCGPR #memory management #policy #scheduling
- Synchronous objects with scheduling policies: introducing safe shared memory in lustre (PC, JLC, LG, MP, PR), pp. 11–20.
- LCTES-2009-OhEPM #architecture #configuration management #scheduling
- Recurrence cycle aware modulo scheduling for coarse-grained reconfigurable architectures (TO, BE, HP, SAM), pp. 21–30.
- LCTES-2009-StotzerL #scheduling
- Modulo scheduling without overlapped lifetimes (ES, ELL), pp. 1–10.
- PPoPP-2009-BaskaranVBRRS #effectiveness #manycore #parallel #scheduling
- Compiler-assisted dynamic scheduling for effective parallelization of loop nests on multicore processors (MMB, NV, UB, JR, AR, PS), pp. 219–228.
- PPoPP-2009-LiBH #distributed #multi #performance #scalability #scheduling #using
- Efficient and scalable multiprocessor fair scheduling using distributed weighted round-robin (TL, DPB, SH), pp. 65–74.
- SOSP-2009-IsardPCWTG #clustering #distributed #named #scheduling
- Quincy: fair scheduling for distributed computing clusters (MI, VP, JC, UW, KT, AG), pp. 261–276.
- CAV-2009-BasuBPS #distributed #model checking #scheduling
- Priority Scheduling of Distributed Systems Based on Model Checking (AB, SB, DP, JS), pp. 79–93.
- CASE-2008-ArnaoutMR #algorithm #optimisation #parallel #problem #scheduling
- Ant colony optimization algorithm to parallel machine scheduling problem with setups (JPA, RM, GR), pp. 578–582.
- CASE-2008-CamponogaraP #generative #problem #scheduling
- Column generation for solving a compressor scheduling problem (EC, AP), pp. 796–801.
- CASE-2008-ChanYDS #clustering #scheduling #tool support
- Optimal scheduling of k-unit production of cluster tools with single-blade robots (WKC, JY, SD, DS), pp. 335–340.
- CASE-2008-HajiAGDM #multi #resource management #scheduling
- An improved multi-mode resource allocation and project scheduling model (MH, LA, PG, HD, MM), pp. 365–370.
- CASE-2008-HoshinoFS #network #pipes and filters #scheduling
- Integrated scheduling for gasoline blending considering storage tanks and pipe network (SH, NF, HS), pp. 784–789.
- CASE-2008-JungL #clustering #performance #scheduling #tool support
- Efficient scheduling method based on an assignment model for robotized cluster tools (CJ, TEL), pp. 79–84.
- CASE-2008-KangXWW #assembly #scheduling
- A swarm-dynamic scheduling method for semiconductor assembly production line (QK, HX, LW, QW), pp. 91–96.
- CASE-2008-Kim #clustering #constraints
- Stable schedule for a single-armed cluster tool with time constraints (JHK), pp. 97–102.
- CASE-2008-LamiriAX #scheduling
- Patients scheduling in a hospital operating theatre (ML, VA, XX), pp. 627–632.
- CASE-2008-LiMAM #multi #network #scheduling
- Low-complexity Channel-Aware Scheduling for multichannel wireless local area networks (YL, SM, PA, SFM), pp. 133–138.
- CASE-2008-LiQ #scheduling
- ACO-based scheduling for a single Batch Processing Machine in semiconductor manufacturing (LL, FQ), pp. 85–90.
- CASE-2008-LiQ08a #performance #requirements #scheduling
- The impact of the qual-run requirements of APC on the scheduling performance in semiconductor manufacturing (LL, FQ), pp. 242–246.
- CASE-2008-PaekL #clustering #scheduling #strict #tool support
- Optimal scheduling of dual-armed cluster tools without swap restriction (JHP, TEL), pp. 103–108.
- CASE-2008-TanakaF #algorithm #performance #scheduling
- An efficient exact algorithm for general single-machine scheduling with machine idle time (ST, SF), pp. 371–376.
- CASE-2008-WangZFZXL #process #scheduling
- A web-based integrated process planning and scheduling system (YW, YZ, JYHF, ZZ, LX, PL), pp. 662–667.
- CASE-2008-WengF #algorithm #evolution #problem #scheduling
- Self evolution algorithm for common due date scheduling problem (WW, SF), pp. 790–795.
- CASE-2008-ZhaoYZHLG #performance #simulation
- Efficient simulation for serial production lines based on aggregated event-scheduling (YZ, CBY, QZ, NH, JL, XG), pp. 406–411.
- DAC-2008-JiangM #power management #reduction #scheduling
- Power gating scheduling for power/ground noise reduction (HJ, MMS), pp. 980–985.
- DAC-2008-NiM #power management #reduction #scheduling
- Leakage power-aware clock skew scheduling: converting stolen time into leakage power reduction (MN, SOM), pp. 610–613.
- DAC-2008-WangLZTYTCN #scheduling
- Timing yield driven clock skew scheduling considering non-Gaussian distributions of critical path delays (YW, WSL, XZ, JT, CY, JT, WC, JN), pp. 223–226.
- DATE-2008-BahukudumbiCK #scheduling
- Test Scheduling for Wafer-Level Test-During-Burn-In of Core-Based SoCs (SB, KC, RK), pp. 1103–1106.
- DATE-2008-BatcherW #embedded #scheduling
- Dynamic Round-Robin Task Scheduling to Reduce Cache Misses for Embedded Systems (KWB, RAW), pp. 260–263.
- DATE-2008-ChantemDH #realtime #scheduling
- Temperature-Aware Scheduling and Assignment for Hard Real-Time Applications on MPSoCs (TC, RPD, XSH), pp. 288–293.
- DATE-2008-DiederichsMSW
- An application-based EDF scheduler for OSEK/VDX (CD, UM, FS, GW), pp. 1045–1050.
- DATE-2008-IzosimovPEP #constraints #embedded #fault tolerance #scheduling
- Scheduling of Fault-Tolerant Embedded Systems with Soft and Hard Timing Constraints (VI, PP, PE, ZP), pp. 915–920.
- DATE-2008-LarssonLCEP #architecture #optimisation #scheduling
- Test-Architecture Optimization and Test Scheduling for SOCs with Core-Level Expansion of Compressed Test Patterns (AL, EL, KC, PE, ZP), pp. 188–193.
- DATE-2008-MalaniMQW #adaptation #multi #nondeterminism #realtime #scalability #scheduling
- Adaptive Scheduling and Voltage Scaling for Multiprocessor Real-time Applications with Non-deterministic Workload (PM, PM, QQ, QW), pp. 652–657.
- DATE-2008-RedaelliSS #anti #configuration management #scheduling
- Task Scheduling with Configuration Prefetching and Anti-Fragmentation techniques on Dynamically Reconfigurable Systems (FR, MDS, DS), pp. 519–522.
- DATE-2008-SchirnerD #modelling #scheduling #using
- Introducing Preemptive Scheduling in Abstract RTOS Models using Result Oriented Modeling (GS, RD), pp. 122–127.
- DATE-2008-XueSSQ #clustering #constraints #effectiveness #memory management #scheduling
- Effective Loop Partitioning and Scheduling under Memory and Register Dual Constraints (CJX, EHMS, ZS, MQ), pp. 1202–1207.
- VLDB-2008-AgrawalKO #scalability #scheduling
- Scheduling shared scans of large data files (PA, DK, CO), pp. 958–969.
- VLDB-2008-AvanesF #adaptation #constraints #network #resource management #scheduling #workflow
- Adaptive workflow scheduling under resource allocation constraints and network dynamics (AA, JCF), pp. 1631–1637.
- VLDB-2008-SharafLC #data type #query #scheduling
- Scheduling continuous queries in data stream management systems (MAS, AL, PKC), pp. 1526–1527.
- ICSM-2008-XiaoWLYZX #constraints #development #maintenance #process #scheduling
- A constraint-driven human resource scheduling method in software development and maintenance process (JX, QW, ML, YY, FZ, LX), pp. 17–26.
- ICALP-A-2008-BansalCLL #bound #scheduling
- Scheduling for Speed Bounded Processors (NB, HLC, TWL, LKL), pp. 409–420.
- ICALP-A-2008-EisenbrandR #realtime #scheduling
- A PTAS for Static Priority Real-Time Scheduling with Resource Augmentation (FE, TR), pp. 246–257.
- ICALP-A-2008-JansenT #algorithm #approximate #parallel #scheduling
- Approximation Algorithms for Scheduling Parallel Jobs: Breaking the Approximation Ratio of 2 (KJ, RT), pp. 234–245.
- ICALP-A-2008-Plaxton #performance #scheduling
- Fast Scheduling of Weighted Unit Jobs with Release Times and Deadlines (CGP), pp. 222–233.
- SEFM-2008-TavaresSM #constraints #embedded #energy #scheduling
- An Environment for Measuring and Scheduling Time-Critical Embedded Systems with Energy Constraints (ET, BS, PRMM), pp. 291–300.
- ICFP-2008-FluetRR #framework #parallel #scheduling
- A scheduling framework for general-purpose parallel languages (MF, MR, JHR), pp. 241–252.
- CHI-2008-GrimesB #multi #scheduling #social
- Life scheduling to support multiple social roles (AG, AJBB), pp. 821–824.
- SOFTVIS-2008-BernardinBH #algorithm #visualisation
- Stacked-widget visualization of scheduling-based algorithms (TB, BB, BH), pp. 165–174.
- AdaEurope-2008-FahmyRJ #performance #realtime #scheduling #thread
- Fast Scheduling of Distributable Real-Time Threads with Assured End-to-End Timeliness (SFF, BR, EDJ), pp. 211–225.
- AdaEurope-2008-SinghoffPD #realtime #scheduling #usability
- Can We Increase the Usability of Real Time Scheduling Theory? The Cheddar Project (FS, AP, PD), pp. 240–253.
- ICEIS-AIDSS-2008-GezerYTOA #framework #mobile #scheduling
- A Bi-Criteria Scheduling Framework for the Supply Chain Management of Mobile Providers (GG, IOY, HMT, TÖ, RA), pp. 364–369.
- ICEIS-AIDSS-2008-UnemeKO #scheduling
- Nurse Scheduling by Cooperative GA with Variable Mutation Operator (SyU, HK, MO), pp. 249–252.
- ICEIS-SAIC-2008-CubillosER #multi #scheduling
- A Multiagent System for Job-Shop Scheduling (CC, LE, NR), pp. 148–153.
- SEKE-2008-XieXLW #scheduling
- A Project Scheduling Method Based on Human Resource Availability (LX, JX, DL, QW), pp. 161–166.
- SIGIR-2008-LiaoCH #image #named #optimisation #scheduling #video
- AdImage: video advertising by image matching and ad scheduling optimization (WSL, KTC, WHH), pp. 767–768.
- OOPSLA-2008-XianSJ #execution #java #parallel #source code #thread
- Contention-aware scheduler: unlocking execution parallelism in multithreaded java programs (FX, WSa, HJ), pp. 163–180.
- TOOLS-EUROPE-2008-LeueSW #runtime #scheduling #semantics #uml
- An AsmL Semantics for Dynamic Structures and Run Time Schedulability in UML-RT (SL, AS, WW), pp. 238–257.
- PADL-2008-BertholdZL #parallel #scheduling
- Scheduling Light-Weight Parallelism in ArTCoP (JB, AAZ, HWL), pp. 214–229.
- POPL-2008-TristanL #case study #optimisation #scheduling #validation #verification
- Formal verification of translation validators: a case study on instruction scheduling optimizations (JBT, XL), pp. 17–27.
- RE-2008-Szoke #automation #scheduling #using
- A Proposed Method for Automated Project Scheduling using Goals and Scenarios (AS), pp. 339–340.
- SAC-2008-Andersson #bound #scheduling
- The utilization bound of uniprocessor preemptive slack-monotonic scheduling is 50% (BA), pp. 281–283.
- SAC-2008-BatistaDF #grid #nondeterminism #scheduling
- Scheduling grid tasks under uncertain demands (DMB, ACD, NLSdF), pp. 2041–2045.
- SAC-2008-BenedettiLV #modelling #scheduling
- Modeling adversary scheduling with QCSP+ (MB, AL, JV), pp. 151–155.
- SAC-2008-CostaF
- A QoS-oriented external scheduler (RLdCC, PF), pp. 1029–1033.
- SAC-2008-Ercan #comparison #hybrid #multi #performance #scheduling
- A performance comparison of PSO and GA in scheduling hybrid flow-shops with multiprocessor tasks (MFE), pp. 1767–1771.
- SAC-2008-ErdilL #grid #hybrid #scheduling #self
- Supporting self-organization for hybrid grid resource scheduling (DCE, MJL), pp. 1981–1986.
- SAC-2008-FahmyRJ #realtime #scheduling #thread
- Scheduling distributable real-time threads in the presence of crash failures and message losses (SFF, BR, EDJ), pp. 294–301.
- SAC-2008-OrdinezDS #approach #behaviour #scheduling
- A behavior priority driven approach for resource reservation scheduling (LO, DD, RMS), pp. 315–319.
- SAC-2008-RaveendranBG #algorithm #evaluation #realtime #scheduling #trade-off
- Evaluation of priority based real time scheduling algorithms: choices and tradeoffs (BKR, SB, SG), pp. 302–307.
- SAC-2008-RochaO #scheduling
- Strategies for QoS improvement on the time-interval scheduling (FRdlR, RSdO), pp. 320–321.
- SAC-2008-SchobelP #case study #clustering #cpu #kernel #research #scheduling #using
- Kernel-mode scheduling server for CPU partitioning: a case study using the Windows research kernel (MS, AP), pp. 1700–1704.
- SAC-2008-ToledoFR #algorithm #problem #scheduling #search-based
- Evaluating genetic algorithms with different population structures on a lot sizing and scheduling problem (CFMT, PMF, KAR), pp. 1777–1781.
- ASPLOS-2008-OttoniA #communication #concurrent #multi #optimisation #scheduling #thread
- Communication optimizations for global multi-threaded instruction scheduling (GO, DIA), pp. 222–232.
- CGO-2008-FanPKM #hardware #reuse #scheduling
- Modulo scheduling for highly customized datapaths to increase hardware reusability (KF, HP, MK, SAM), pp. 124–133.
- HPDC-2008-AidaC #scheduling
- Scheduling mixed-parallel applications with advance reservations (KA, HC), pp. 65–74.
- HPDC-2008-PasqualiBCRL #scalability
- A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale grids (MP, RB, GC, LR, DL), pp. 231–232.
- HPDC-2008-RamakrishnanR #fault tolerance #modelling #scheduling #workflow
- Performability modeling for scheduling and fault tolerance strategies for scientific workflows (LR, DAR), pp. 23–34.
- LCTES-2008-AnandL #analysis #embedded #robust #scheduling
- Robust and sustainable schedulability analysis of embedded software (MA, IL), pp. 61–70.
- PPoPP-2008-ChanZBQQG #named #parallel #runtime #scheduling #thread
- SuperMatrix: a multithreaded runtime scheduling system for algorithms-by-blocks (EC, FGVZ, PB, ESQO, GQO, RAvdG), pp. 123–132.
- PPoPP-2008-NavabiZJ #scheduling
- Quasi-static scheduling for safe futures (AN, XZ, SJ), pp. 23–32.
- PPoPP-2008-NurmiWB #parallel #probability
- Probabilistic advanced reservations for batch-scheduled parallel machines (DN, RW, JB), pp. 289–290.
- ICST-2008-SeceleanuPH #resource management #scheduling
- Scheduling Timed Modules for Correct Resource Sharing (CCS, PP, HH), pp. 102–111.
- ASE-2007-ChenM #concurrent #source code #testing #using
- Testing concurrent programs using value schedules (JC, SM), pp. 313–322.
- ASE-2007-LiuLMS #quality #refactoring #scheduling
- Scheduling of conflicting refactorings to promote quality improvement (HL, GL, ZM, WS), pp. 489–492.
- CASE-2007-CamponogaraCP #scheduling
- Compressor Scheduling in Oil Fields: A Piecewise-Linear Formulation (EC, MPdC, AP), pp. 436–441.
- CASE-2007-ChanYD #clustering #multi #on the #scheduling #tool support
- On the Optimality of One-Unit Cycle Scheduling of Multi-Cluster Tools with Single-Blade Robots (WKC, JY, SD), pp. 392–397.
- CASE-2007-ChengOKKO #algorithm #problem #scheduling
- Simulated Annealing Algorithm for Daily Nursing Care Scheduling Problem (MC, HIO, NK, KK, JO), pp. 507–512.
- CASE-2007-GuLZF #approach #problem #scheduling
- Dynamic Local Focusing Approach for Production Scheduling Problems (PG, YL, XZ, SF), pp. 466–471.
- CASE-2007-HuangLF #scheduling
- Lot Dispatching and Scheduling Integrating OHT Traffic Information in the 300mm Wafer Fab (HWH, CHL, LCF), pp. 495–500.
- CASE-2007-LeeEP
- Proposed Methodology for Dynamic Schedule Compression (JL, RDEJ, JHP), pp. 986–991.
- CASE-2007-NishiHI #problem #scheduling
- A Successive Lagrangian Relaxation Method for Solving Flowshop Scheduling Problems with Total Weighted Tardiness (TN, YH, MI), pp. 875–880.
- CASE-2007-NishiHIG #composition #generative #multi #scheduling
- A Decomposition Method with Cut Generation for Simultaneous Production Scheduling and Routing for multiple AGVs (TN, YH, MI, IEG), pp. 658–663.
- CASE-2007-ShibataZHSF #scheduling #self
- Generalization of Scheduling Information Acquired Through User Manipulation for Self-construction Production Scheduling System (TS, XZ, XH, YS, SF), pp. 33–38.
- CASE-2007-ZhangJ0 #multi #scheduling
- Multi-criteria Dynamic Scheduling Methodology for Controlling a Semiconductor Wafer Fabrication System (HZ, ZJ, HH), pp. 213–218.
- DAC-2007-BanerjeeBDN #architecture #configuration management #resource management #scheduling
- Selective Band width and Resource Management in Scheduling for Dynamically Reconfigurable Architectures (SB, EB, ND, JN), pp. 771–776.
- DAC-2007-GuHY #distributed #embedded #model checking #optimisation
- Optimization of Static Task and Bus Access Schedules for Time-Triggered Distributed Embedded Systems with Model-Checking (ZG, XH, MY), pp. 294–299.
- DAC-2007-XianLL #energy #execution #multi #nondeterminism #realtime #scheduling
- Energy-Aware Scheduling for Real-Time Multiprocessor Systems with Uncertain Task Execution Time (CX, YHL, ZL), pp. 664–669.
- DATE-2007-ChenKYK #energy #realtime #scheduling
- Energy-efficient real-time task scheduling with task rejection (JJC, TWK, CLY, KJK), pp. 1629–1634.
- DATE-2007-CoskunRW #scheduling
- Temperature aware task scheduling in MPSoCs (AKC, TSR, KW), pp. 1659–1664.
- DATE-2007-CucuG #multi #scheduling
- Feasibility intervals for multiprocessor fixed-priority scheduling of arbitrary deadline periodic systems (LC, JG), pp. 1635–1640.
- DATE-2007-DittmannF #configuration management #realtime #scheduling
- Hard real-time reconfiguration port scheduling (FD, SF), pp. 123–128.
- DATE-2007-GhoshBR #adaptation #scheduling #synthesis #using
- Low-overhead circuit synthesis for temperature adaptation using dynamic voltage scheduling (SG, SB, KR), pp. 1532–1537.
- DATE-2007-JuCR #analysis #scheduling
- Accounting for cache-related preemption delay in dynamic priority schedulability analysis (LJ, SC, AR), pp. 1623–1628.
- DATE-2007-KandemirYSO #memory management #scheduling
- Memory bank aware dynamic loop scheduling (MTK, TY, SWS, ÖÖ), pp. 1671–1676.
- DATE-2007-NaculRL #architecture #hardware #scheduling
- Hardware scheduling support in SMP architectures (ACN, FR, ML), pp. 642–647.
- DATE-2007-NiuQ #energy #interactive #realtime #scheduling
- Interactive presentation: Peripheral-conscious scheduling on energy minimization for weakly hard real-time systems (LN, GQ), pp. 791–796.
- DATE-2007-ReshadiG #architecture #embedded #low level #programming
- Interrupt and low-level programming support for expanding the application domain of statically-scheduled horizontal-microcoded architectures in embedded systems (MR, DG), pp. 1337–1342.
- DATE-2007-SatishRK #approach #communication #constraints #graph #multi #optimisation #scheduling
- A decomposition-based constraint optimization approach for statically scheduling task graphs with communication delays to multiprocessors (NS, KR, KK), pp. 57–62.
- DATE-2007-SugiharaIM #architecture #multi #reliability #scheduling
- Task scheduling for reliable cache architectures of multiprocessor systems (MS, TI, KM), pp. 1490–1495.
- DATE-2007-WangCW #optimisation #scheduling #testing #using
- SoC testing using LFSR reseeding, and scan-slice-based TAM optimization and test scheduling (ZW, KC, SW), pp. 201–206.
- DATE-2007-WatanabeKINN #constraints #energy #interactive #multi #performance #scheduling
- Interactive presentation: Task scheduling under performance constraints for reducing the energy consumption of the GALS multi-processor SoC (RW, MK, MI, HN, TN), pp. 797–802.
- DATE-2007-YonedaIF #algorithm #configuration management #interactive #scheduling #using
- Interactive presentation: An SoC test scheduling algorithm using reconfigurable union wrappers (TY, MI, HF), pp. 231–236.
- DATE-2007-ZhouB #approach #reduction #scheduling #testing #using
- Test cost reduction for SoC using a combined approach to test data compression and test scheduling (QZ, KJB), pp. 39–44.
- STOC-2007-AndrewsJS #network #protocol #scheduling
- Stability of the max-weight routing and scheduling protocol in dynamic networks and at critical loads (MA, KJ, ALS), pp. 145–154.
- ICALP-2007-BansalCP #algorithm #scheduling
- Competitive Algorithms for Due Date Scheduling (NB, HLC, KP), pp. 28–39.
- ICALP-2007-ChristodoulouKK #design #scheduling
- Mechanism Design for Fractional Scheduling on Unrelated Machines (GC, EK, AK), pp. 40–52.
- CHI-2007-ButlerZEBHK #case study #design
- Work-centered design: a case study of a mixed-initiative scheduler (KAB, JZ, CE, AB, RH, DEK), pp. 747–756.
- SIGAda-2007-Singhoff #ada #named #realtime #scheduling
- MP1: real time scheduling theory and its use with ada (FS), p. 8.
- SIGAda-2007-SinghoffP #analysis #modelling
- AADL modeling and analysis of hierarchical schedulers (FS, AP), pp. 41–50.
- ICEIS-EIS-2007-LongP #composition #grid #scheduling #workflow
- Grid Workflow Scheduling with Temporal Decomposition (FL, HKP), pp. 440–446.
- REFSQ-2007-LiABD #release planning #scheduling
- Integrated Requirement Selection and Scheduling for the Release Planning of a Software Product (CL, JMvdA, SB, GD), pp. 93–108.
- SAC-2007-BatistaFM #grid #network #set
- A set of schedulers for grid networks (DMB, NLSdF, FKM), pp. 209–213.
- SAC-2007-Holland #injection #scheduling
- Injection/withdrawal scheduling for natural gas storage facilities (AH), pp. 332–333.
- SAC-2007-JinM #network #scheduling
- An analytical model for generalized processor sharing scheduling with heterogeneous network traffic (XJ, GM), pp. 198–202.
- SAC-2007-LeeKS #network #scheduling
- A fair scheduling scheme for a time-sensitive traffic over the dual-channel wireless network (JL, MK, AS), pp. 1131–1135.
- CC-2007-ChoAUP #effectiveness #multi #preprocessor #scheduling
- Preprocessing Strategy for Effective Modulo Scheduling on Multi-issue Digital Signal Processors (DC, RA, GRU, YP), pp. 16–31.
- CC-2007-NagarakatteG #integer #linear #pipes and filters #programming #scheduling #using
- Register Allocation and Optimal Spill Code Scheduling in Software Pipelined Loops Using 0-1 Integer Linear Programming Formulation (SGN, RG), pp. 126–140.
- CGO-2007-CodinaSG #clustering #graph #scheduling
- Virtual Cluster Scheduling Through the Scheduling Graph (JMC, FJS, AG), pp. 89–101.
- HPCA-2007-ShaoD #order #scheduling
- A Burst Scheduling Access Reordering Mechanism (JS, BTD), pp. 285–294.
- HPDC-2007-LeeS #analysis #performance #precise
- Precise and realistic utility functions for user-centric performance analysis of schedulers (CBL, AS), pp. 107–116.
- HPDC-2007-SongMD #concurrent #memory management #scheduling #thread
- Feedback-directed thread scheduling with memory considerations (FS, SM, JD), pp. 97–106.
- HPDC-2007-ZhengVT #fault tolerance #replication #scheduling
- Fault-tolerant scheduling for differentiated classes of tasks with low replication cost in computational grids (QZ, BV, CKT), pp. 239–240.
- ISMM-2007-XianSJ #concurrent #garbage collection #performance #policy #scheduling #thread
- Allocation-phase aware thread scheduling policies to improve garbage collection performance (FX, WSa, HJ), pp. 79–90.
- LCTES-2007-ZhuM #feedback #named #reduction #scalability #scheduling
- DVSleak: combining leakage reduction and voltage scaling in feedback EDF scheduling (YZ, FM), pp. 31–40.
- SOSP-2007-VandiverBLM #commit #fault #scheduling #transaction #using
- Tolerating byzantine faults in transaction processing systems using commit barrier scheduling (BV, HB, BL, SM), pp. 59–72.
- ASE-2006-EichbergMKOR #analysis #scheduling #set
- Integrating and Scheduling an Open Set of Static Analyses (ME, MM, SK, KO, BR), pp. 113–122.
- CASE-2006-ChandrasekaranSPV #algorithm #optimisation #permutation #problem #scheduling
- An Application of Particle Swarm Optimization Algorithm to Permutation Flowshop Scheduling Problems to Minimize Makespan, Total Flowtime and Completion Time Variance (SC, RKS, SGP, NV), pp. 513–518.
- CASE-2006-ChengSOYII #performance #scheduling
- A fast rescheduling method in semiconductor manufacturing allowing for tardiness and scheduling stability (MC, MS, JO, MY, HI, KI), pp. 100–105.
- CASE-2006-ChoWTF #distributed #scheduling
- Autonomous Distributed Scheduling Adjustment Function with Interchanging Operations (SCC, KW, KT, SF), pp. 387–392.
- CASE-2006-DingYZA #clustering #evaluation #multi #nondeterminism #optimisation #performance #process #tool support
- Performance Evaluation and Schedule Optimization of Multi-Cluster Tools with Process Times Uncertainty (SD, JY, MTZ, RAT), pp. 112–117.
- CASE-2006-KobetskiSF #algorithm #comparison #coordination #scheduling
- Scheduling algorithms for optimal robot cell coordination — a comparison (AK, DS, MF), pp. 381–386.
- CASE-2006-RaghavanV #optimisation #parallel #product line #scheduling #using
- Scheduling Parallel Batch Processors with Incompatible Job Families Using Ant Colony Optimization (NRSR, MV), pp. 507–512.
- CASE-2006-WangQW #multi #optimisation #scheduling
- Scheduling Semiconductor Wafer Fabrication with Optimization of Multiple objectives (ZW, FQ, QW), pp. 253–258.
- CASE-2006-WuZ #clustering #constraints #petri net #scheduling #tool support
- Schedulability and Scheduling of Dual-Arm Cluster Tools with Residency Time Constraints Based on Petri Net (NW, MZ), pp. 87–92.
- CASE-2006-ZhangHSF #scheduling #self
- Self-construction Production Scheduling System (XZ, XH, YS, SF), pp. 519–523.
- DAC-2006-CongZ #algorithm #performance #scheduling
- An efficient and versatile scheduling algorithm based on SDC formulation (JC, ZZ), pp. 433–438.
- DAC-2006-LeungT #performance #scheduling
- Optimal link scheduling on improving best-effort and guaranteed services performance in network-on-chip systems (LFL, CYT), pp. 833–838.
- DAC-2006-NahirZEKR #generative #multi #testing #verification
- Scheduling-based test-case generation for verification of multimedia SoCs (AN, AZ, RE, TK, NR), pp. 348–351.
- DAC-2006-WangDC #approach #named #scheduling #tool support
- ExtensiveSlackBalance: an approach to make front-end tools aware of clock skew scheduling (KW, LD, XC), pp. 951–954.
- DATE-2006-Albrecht #incremental #latency #performance #scalability #scheduling
- Efficient incremental clock latency scheduling for large circuits (CA), pp. 1091–1096.
- DATE-2006-ChengG #energy #online #realtime #scheduling
- Online energy-aware I/O device scheduling for hard real-time systems (HC, SG), pp. 1055–1060.
- DATE-2006-CherrounDF #constraints #equation #scheduling #using
- Scheduling under resource constraints using dis-equations (HC, AD, PF), pp. 1067–1072.
- DATE-2006-HePE #clustering #scheduling #testing
- Power constrained and defect-probability driven SoC test scheduling with test set partitioning (ZH, ZP, PE), pp. 291–296.
- DATE-2006-IzosimovPEP #distributed #embedded #fault tolerance #performance #synthesis #trade-off
- Synthesis of fault-tolerant schedules with transparency/performance trade-offs for distributed embedded systems (VI, PP, PE, ZP), pp. 706–711.
- DATE-2006-LiuI #optimisation #scheduling #using
- Test scheduling with thermal optimization for network-on-chip systems using variable-rate on-chip clocking (CL, VI), pp. 652–657.
- DATE-2006-LiuLP #scheduling
- Reuse-based test access and integrated test scheduling for network-on-chip (CL, ZL, DKP), pp. 303–308.
- DATE-2006-LuZSLS #scheduling #set
- Procrastinating voltage scheduling with discrete frequency sets (ZL, YZ, MRS, JL, KS), pp. 456–461.
- DATE-2006-NakamuraST #integration #performance #simulation
- An efficient and portable scheduler for RTOS simulation and its certified integration to SystemC (HN, NS, NT), pp. 1157–1158.
- DATE-2006-RickettsIVI #scheduling
- Priority scheduling in digital microfluidics-based biochips (AJR, KMI, NV, MJI), pp. 329–334.
- DATE-2006-RuggieroGBPM #framework #multi #scheduling
- Communication-aware allocation and scheduling framework for stream-oriented multi-processor systems-on-chip (MR, AG, DB, FP, MM), pp. 3–8.
- DATE-2006-YiNMKAL #configuration management #scheduling
- System-level scheduling on instruction cell based reconfigurable systems (YY, IN, MM, SK, TA, IL), pp. 381–386.
- DATE-2006-YonedaMF #multi #scheduling
- Power-constrained test scheduling for multi-clock domain SoCs (TY, KM, HF), pp. 297–302.
- VLDB-2006-SharafCLP #performance #query #scheduling
- Efficient Scheduling of Heterogeneous Continuous Queries (MAS, PKC, AL, KP), pp. 511–522.
- FASE-2006-OlveczkyC #algorithm #analysis #maude #realtime #scheduling #simulation
- Formal Simulation and Analysis of the CASH Scheduling Algorithm in Real-Time Maude (PCÖ, MC), pp. 357–372.
- PLDI-2006-BridgesVOA #automation
- Automatic instruction scheduler retargeting by reverse-engineering (MJB, NV, GO, DIA), pp. 228–238.
- SEFM-2006-ZhangHW #component #declarative #modelling #performance #scheduling #uml #using
- Declarative Performance Modeling for Component-Based System using UML Profile for Schedulability, Performance and Time (YZ, TH, JW), pp. 246–258.
- CHI-2006-BrzozowskiCKMHN #named #scheduling
- groupTime: preference based group scheduling (MB, KC, SRK, PM, JH, AYN), pp. 1047–1056.
- AdaEurope-2006-CamposGH #middleware #policy #realtime #scheduling
- Interchangeable Scheduling Policies in Real-Time Middleware for Distribution (JLC, JJG, MGH), pp. 227–240.
- AdaEurope-2006-PulidoUZVP #ada #scheduling
- Hierarchical Scheduling with Ada 2005 (JAP, SU, JZ, TV, JAdlP), pp. 1–12.
- SIGAda-2006-LudwigP #named
- DEGAS: discrete event Gnu advanced scheduler (LL, PP), pp. 35–42.
- ICEIS-AIDSS-2006-LinHST #named #scheduling
- LOGICRUNCHER — A Logistics Planning and Scheduling Decision Support System for Emerging EMS and 3PL Business Practices (RJL, JH, NSK, BT), pp. 176–181.
- ICEIS-AIDSS-2006-ShrLC #approach #constraints #scheduling
- A Load Balancing Scheduling Approach for Dedicated Machine Constraint (AMDS, AL, PPC), pp. 170–175.
- ICEIS-ISAS-2006-ChengP #aspect-oriented #bibliography #development #embedded #realtime #resource management #scheduling #using
- Using Aspect-Oriented Software Development in Real-Time Embedded Systems Software — A Review of Scheduling, Resource Allocation and Synchronization (PLC, GAP), pp. 388–393.
- CIKM-2006-GolabBO #multi #optimisation
- Multi-query optimization of sliding window aggregates by schedule synchronization (LG, KGB, MTÖ), pp. 844–845.
- ICPR-v3-2006-KyweFM #algorithm #image #realtime #scheduling #using
- Scheduling of Image Processing Using Anytime Algorithm for Real-time System (WWK, DF, KM), pp. 1095–1098.
- SEKE-2006-HewettKSA #fault #predict #testing
- Software Defect Data and Predictability for Testing Schedules (RH, AK, CS, AAA), pp. 499–504.
- SAC-2006-Chang #embedded #scalability #scheduling
- Event-driven scheduling for dynamic workload scaling in uniprocessor embedded systems (LPC), pp. 1462–1466.
- SAC-2006-ChoRJ #embedded #on the #realtime #scheduling
- On utility accrual processor scheduling with wait-free synchronization for embedded real-time software (HC, BR, EDJ), pp. 918–922.
- SAC-2006-DuranX #algorithm #scheduling #search-based
- The effects of two replacement strategies on a genetic algorithm for scheduling jobs on computational grids (BD, FX), pp. 960–961.
- SAC-2006-HungHHC #scheduling
- Scheduling dependent items in data broadcasting environments (HPH, JWH, JLH, MSC), pp. 1177–1181.
- SAC-2006-LuHS #algorithm #precise #realtime #scheduling
- A precise schedulability test algorithm for scheduling periodic tasks in real-time systems (WCL, JWH, WKS), pp. 1451–1455.
- SAC-2006-MuhammadMA #communication #scheduling
- Contentions-conscious dynamic but deterministic scheduling of computational and communication tasks (MF, FM, MA), pp. 1487–1492.
- SAC-2006-NasrBFI #automaton #specification #verification
- Verification of a scheduler in B through a timed automata specification (ON, JPB, MF, MRI), pp. 1800–1801.
- ASPLOS-2006-CoonsCBMK #algorithm #architecture #scheduling
- A spatial path scheduling algorithm for EDGE architectures (KEC, XC, DB, KSM, SKK), pp. 129–140.
- ASPLOS-2006-MercaldiSPPSOE #architecture #data flow #scheduling
- Instruction scheduling for a tiled dataflow architecture (MM, SS, AP, AP, AS, MO, SJE), pp. 141–150.
- HPCA-2006-SharkeyP #performance #smt
- Efficient instruction schedulers for SMT processors (JJS, DVP), pp. 288–298.
- HPCA-2006-SubramaniamL #dependence #memory management #predict #scalability #scheduling
- Store vectors for scalable memory dependence prediction and scheduling (SS, GHL), pp. 65–76.
- HPDC-2006-ChouhanDCV #how #question
- How should you structure your hierarchical scheduler? (PKC, HD, EC, FV), pp. 339–340.
- HPDC-2006-KhannaVCKKSS #data-driven #replication #scheduling
- Task Scheduling and File Replication for Data-Intensive Jobs with Batch-shared I/O (GK, NV, ÜVÇ, TMK, SK, PS, JHS), pp. 241–252.
- HPDC-2006-LebreDHS #adaptation #distributed #multi #scheduling
- Adaptive I/O Scheduling for Distributed Multi-applications Environments (AL, YD, GH, PS), pp. 343–344.
- HPDC-2006-NewhouseP #named
- ALPS: An Application-Level Proportional-Share Scheduler (TN, JP), pp. 279–290.
- HPDC-2006-SilbersteinGSL #execution #grid #multi #scheduling
- Scheduling Mixed Workloads in Multi-grids: The Grid Execution Hierarchy (MS, DG, AS, ML), pp. 291–302.
- HPDC-2006-WieczorekPF #approach #grid #programming #scheduling #workflow
- Dynamic Programming Based Approach for Bi-criteria Workflow Scheduling on the Grid (MW, RP, TF), pp. 381–382.
- HPDC-2006-ZhengYS #algorithm #grid #how #novel #probability #scheduling
- How to avoid herd: a novel stochastic algorithm in grid scheduling (QZ, HY, YS), pp. 267–278.
- ISMM-2006-BhatiaCL #behaviour #co-evolution #design #optimisation
- Memory-manager/scheduler co-design: optimizing event-driven servers to improve cache behavior (SB, CC, JLL), pp. 104–114.
- LCTES-2006-ChenK #scalability #scheduling
- Procrastination for leakage-aware rate-monotonic scheduling on a dynamic voltage scaling processor (JJC, TWK), pp. 153–162.
- LCTES-2006-DanneP #configuration management #hardware #scheduling
- An EDF schedulability test for periodic tasks on reconfigurable hardware devices (KD, MP), pp. 93–102.
- LCTES-2006-ParkSDNPE #reduction #scheduling
- Bypass aware instruction scheduling for register file power reduction (SP, AS, NDD, AN, YP, EE), pp. 173–181.
- PPoPP-2006-AgrawalHHL #adaptation #feedback #parallel #scheduling
- Adaptive scheduling with parallelism feedback (KA, YH, WJH, CEL), pp. 100–109.
- PPoPP-2006-BrevikNW #bound #parallel #predict
- Predicting bounds on queuing delay for batch-scheduled parallel machines (JB, DN, RW), pp. 110–118.
- VMCAI-2006-Subramani #constraints #scheduling
- Totally Clairvoyant Scheduling with Relative Timing Constraints (KS), pp. 398–411.
- CBSE-2005-GuH #component #implementation #modelling #realtime #scheduling #synthesis
- Real-Time Scheduling Techniques for Implementation Synthesis from Component-Based Software Models (ZG, ZH), pp. 235–250.
- CASE-2005-ChiangF #problem #scheduling
- An iterative refining mechanism for general job shop scheduling problems (TCC, LCF), pp. 203–208.
- CASE-2005-LiuHL #flexibility #scheduling #using
- Dynamic scheduling of flexible manufacturing system using support vector machines (YHL, HPH, YSL), pp. 387–392.
- DAC-2005-HuangNL #scheduling
- Race-condition-aware clock skew scheduling (SHH, YTN, FPL), pp. 475–478.
- DAC-2005-JejurikarG #embedded #realtime #scheduling
- Dynamic slack reclamation with procrastination scheduling in real-time embedded systems (RJ, RKG), pp. 111–116.
- DAC-2005-KimK #array #design #embedded #memory management #optimisation #scheduling
- Memory access optimization through combined code scheduling, memory allocation, and array binding in embedded system design (JK, TK), pp. 105–110.
- DAC-2005-ZhangLLSS #realtime #scheduling
- Optimal procrastinating voltage scheduling for hard real-time systems (YZ, ZL, JL, KS, MRS), pp. 905–908.
- DAC-2005-ZhuoC #energy #scheduling
- System-level energy-efficient dynamic task scheduling (JZ, CC), pp. 628–631.
- DATE-2005-AbdiG #functional #scheduling #validation
- Functional Validation of System Level Static Scheduling (SA, DDG), pp. 542–547.
- DATE-2005-AlbersS #analysis #performance #realtime #scheduling
- Efficient Feasibility Analysis for Real-Time Systems with EDF Scheduling (KA, FS), pp. 492–497.
- DATE-2005-ChakrabortyT #analysis #scheduling #streaming
- A New Task Model for Streaming Applications and Its Schedulability Analysis (SC, LT), pp. 486–491.
- DATE-2005-GhoshG #distributed #locality #named #network #protocol #scheduling
- LORD: A Localized, Reactive and Distributed Protocol for Node Scheduling in Wireless Sensor Networks (AG, TG), pp. 190–195.
- DATE-2005-HeniaE #analysis #distributed #scheduling
- Context-Aware Scheduling Analysis of Distributed Systems with Tree-Shaped Task-Dependencies (RH, RE), pp. 480–485.
- DATE-2005-HungXVKI #embedded #scheduling
- Thermal-Aware Task Allocation and Scheduling for Embedded Systems (WLH, YX, NV, MTK, MJI), pp. 898–899.
- DATE-2005-KandemirC #embedded #process #scheduling
- Locality-Aware Process Scheduling for Embedded MPSoCs (MTK, GC), pp. 870–875.
- DATE-2005-KhanV #algorithm #scheduling
- An Iterative Algorithm for Battery-Aware Task Scheduling on Portable Computing Platforms (JK, RV), pp. 622–627.
- DATE-2005-LavagnoPSW #design #slicing
- A Time Slice Based Scheduler Model for System Level Design (LL, CP, VS, YW), pp. 378–383.
- DATE-2005-LeungTH #energy #scheduling
- Exploiting Dynamic Workload Variation in Low Energy Preemptive Task Scheduling (LFL, CYT, XSH), pp. 634–639.
- DATE-2005-PanainteBV #hardware #scheduling
- Instruction Scheduling for Dynamic Hardware Configurations (EMP, KB, SV), pp. 100–105.
- DATE-2005-ResanoMC #configuration management #hardware #heuristic #hybrid #runtime #scheduling
- A Hybrid Prefetch Scheduling Heuristic to Minimize at Run-Time the Reconfiguration Overhead of Dynamically Reconfigurable Hardware (JR, DM, FC), pp. 106–111.
- DATE-2005-RosingerAC #agile #generative
- Rapid Generation of Thermal-Safe Test Schedules (PMR, BMAH, KC), pp. 840–845.
- DATE-2005-WongLLHP #realtime #scheduling
- Scheduling of Soft Real-Time Systems for Context-Aware Applications (JLW, WL, FL, LH, MP), pp. 318–323.
- DATE-2005-WuRJ #energy #realtime #scheduling
- Energy-Efficient, Utility Accrual Real-Time Scheduling Under the Unimodal Arbitrary Arrival Model (HW, BR, EDJ), pp. 474–479.
- DATE-2005-YangCK #algorithm #approximate #energy #multi #scheduling
- An Approximation Algorithm for Energy-Efficient Scheduling on A Chip Multiprocessor (CYY, JJC, TWK), pp. 468–473.
- VLDB-2005-AkalTSBGV #correctness #fine-grained #replication #scheduling
- Fine-Grained Replication and Scheduling with Freshness and Correctness Guarantees (FA, CT, HJS, YB, TG, LV), pp. 565–576.
- STOC-2005-AzarE #parallel #programming #scheduling
- Convex programming for scheduling unrelated parallel machines (YA, AE), pp. 331–337.
- ICALP-2005-GairingMW #algorithm #approximate #combinator #parallel #performance #scheduling
- A Faster Combinatorial Approximation Algorithm for Scheduling Unrelated Parallel Machines (MG, BM, AW), pp. 828–839.
- AdaEurope-2005-RivasMH #ada #policy #scheduling
- Integrating Application-Defined Scheduling with the New Dispatching Policies for Ada Tasks (MAR, JM, MGH), pp. 220–235.
- AdaEurope-2005-SaezLTC #implementation #performance
- Efficient Alternatives for Implementing Fixed-Priority Schedulers (SS, VLG, ST, AC), pp. 39–50.
- SIGAda-2005-SinghoffLNM #analysis #memory management #requirements #scheduling
- Scheduling and memory requirements analysis with AADL (FS, JL, LN, LM), pp. 1–10.
- ICEIS-v4-2005-SaleemB #algorithm #grid #scheduling #search-based #using
- Job Scheduling in Computational Grid Using Genetic Algorithm (MS, SB), pp. 163–169.
- ICEIS-v5-2005-CordryBB #interactive #realtime #scheduling
- Performing Real-Time Scheduling in an Interactive Audio-Streaming Application (JC, NB, SB), pp. 140–147.
- SAC-2005-ChenCKM #realtime #scheduling
- Real-time task scheduling anomaly: observations and prevention (YSC, LPC, TWK, AKM), pp. 897–898.
- SAC-2005-FeizabadiRJ #algorithm #named #scheduling
- MSA: a memory-aware utility accrual scheduling algorithm (SF, BR, EDJ), pp. 857–862.
- SAC-2005-PandeyGM #algorithm #learning #probability #scheduling
- Stochastic scheduling of active support vector learning algorithms (GP, HG, PM), pp. 38–42.
- SAC-2005-ProdanF #case study #grid #scheduling #workflow
- Dynamic scheduling of scientific workflow applications on the grid: a case study (RP, TF), pp. 687–694.
- SAC-2005-XiaoLJ #clustering #on the #problem #scheduling
- On unit task linear-nonlinear two-cluster scheduling problem (ZX, WNL, JJFJ), pp. 713–717.
- HPDC-2005-DalheimerPM #grid #named
- Calana: a general-purpose agent-based grid scheduler (MD, FJP, PM), pp. 279–280.
- HPDC-2005-EnglandWS #metric #robust #scheduling
- A new metric for robustness with application to job scheduling (DE, JBW, JS), pp. 135–143.
- HPDC-2005-HackerNA #adaptation #parallel #scheduling
- Adaptive data block scheduling for parallel TCP streams (TJH, BDN, BDA), pp. 265–275.
- HPDC-2005-MandalKKMMLJ #grid #scheduling #workflow
- Scheduling strategies for mapping application workflows onto the grid (AM, KK, CK, GM, JMMC, BL, SLJ), pp. 125–134.
- HPDC-2005-SabinSS #assessment #multi
- Assessment and enhancement of meta-schedulers for multi-site job sharing (GS, VS, PS), pp. 144–153.
- HPDC-2005-VenugopalB #cost analysis #data-driven #scheduling
- Cost-based scheduling for data-intensive applications on global grids (SV, RB), pp. 310–311.
- LCTES-2005-StaschulatE #analysis #precise #scalability #scheduling
- Scalable precision cache analysis for preemptive scheduling (JS, RE), pp. 157–165.
- LCTES-2005-ZhuM #feedback #scalability #scheduling
- Feedback EDF scheduling exploiting hardware-assisted asynchronous dynamic voltage scaling (YZ, FM), pp. 203–212.
- SOSP-2005-EggertT #scheduling
- Idletime scheduling with preemption intervals (LE, JDT), pp. 249–262.
- ASE-2004-Kloukinas #realtime
- Data-Mining Synthesised Schedulers for Hard Real-Time Systems (CK), pp. 14–23.
- DAC-2004-Kandemir #multi #named #scheduling
- LODS: locality-oriented dynamic scheduling for on-chip multiprocessors (MTK), pp. 125–128.
- DAC-2004-KappS #automation #behaviour #control flow #scheduling #synthesis
- Automatic correct scheduling of control flow intensive behavioral descriptions in formal synthesis (KK, VKS), pp. 61–66.
- DAC-2004-LyuhK #energy #memory management #multi #scheduling
- Memory access scheduling and binding considering energy minimization in multi-bank memory systems (CGL, TK), pp. 81–86.
- DAC-2004-ResanoM #configuration management #hardware #scheduling
- Specific scheduling support to minimize the reconfiguration overhead of dynamically reconfigurable hardware (JR, DM), pp. 119–124.
- DAC-2004-RosenbandA #composition #scheduling
- Modular scheduling of guarded atomic actions (DLR, A), pp. 55–60.
- DAC-2004-SeoKC #realtime #scheduling
- Profile-based optimal intra-task voltage scheduling for hard real-time applications (JS, TK, KSC), pp. 87–92.
- DATE-v1-2004-ChenKS #process #scheduling
- Configuration-Sensitive Process Scheduling for FPGA-Based Computing Platforms (GC, MTK, US), pp. 486–493.
- DATE-v1-2004-ChinN #scheduling #trade-off
- SoC Test Scheduling with Power-Time Tradeoff and Hot Spot Avoidance (JC, MN), pp. 710–711.
- DATE-v1-2004-HuM #architecture #communication #constraints #energy #realtime #scheduling
- Energy-Aware Communication and Task Scheduling for Network-on-Chip Architectures under Real-Time Constraints (JH, RM), pp. 234–239.
- DATE-v1-2004-HuVKKI #reduction #reuse #scheduling
- Scheduling Reusable Instructions for Power Reduction (JSH, NV, SK, MTK, MJI), pp. 148–155.
- DATE-v1-2004-MolinaRMH #behaviour #scheduling
- Behavioural Bitwise Scheduling Based on Computational Effort Balancing (MCM, RRS, JMM, RH), pp. 684–685.
- DATE-v1-2004-PerezMT #scheduling #using
- A New Optimized Implemention of the SystemC Engine Using Acyclic Scheduling (DGP, GM, OT), pp. 552–557.
- DATE-v1-2004-WangH #clustering #memory management #multi #power management #scheduling
- Power Aware Variable Partitioning and Instruction Scheduling for Multiple Memory Banks (ZW, XSH), pp. 312–317.
- DATE-v2-2004-CortesEP #realtime #scheduling
- Quasi-Static Scheduling for Real-Time Systems with Hard and Soft Tasks (LAC, PE, ZP), pp. 1176–1183.
- VLDB-2004-KochSSS #data type #query #scheduling
- Schema-based Scheduling of Event Processors and Buffer Minimization for Queries on Structured Data Streams (CK, SS, NS, BS), pp. 228–239.
- TACAS-2004-KrcalY #analysis #automaton #decidability #problem #scheduling #using
- Decidable and Undecidable Problems in Schedulability Analysis Using Timed Automata (PK, WY), pp. 236–250.
- TACAS-2004-RasmussenLS #automaton #scheduling #using
- Resource-Optimal Scheduling Using Priced Timed Automata (JIR, KGL, KS), pp. 220–235.
- PEPM-2004-LawallMD #design #implementation #process #scheduling
- Invited application paper: language design for implementing process scheduling hierarchies (JLL, GM, HD), pp. 80–91.
- PLDI-2004-CavazosEM #heuristic
- Inducing heuristics to decide whether to schedule (JC, JEBM), pp. 183–194.
- STOC-2004-ChekuriGKK #multi #scheduling
- Multi-processor scheduling to minimize flow time with epsilon resource augmentation (CC, AG, SK, AK), pp. 363–372.
- STOC-2004-ChuzhoyN #scheduling
- New hardness results for congestion minimization and machine scheduling (JC, JN), pp. 28–34.
- STOC-2004-GairingLMM #nash #parallel #scheduling #strict
- Computing Nash equilibria for scheduling on restricted parallel links (MG, TL, MM, BM), pp. 613–622.
- ICALP-2004-ChrobakJST #online #scheduling
- Online Scheduling of Equal-Length Jobs: Randomization and Restarts Help (MC, WJ, JS, TT), pp. 358–370.
- ICALP-2004-GandhiHKS #migration #scheduling
- Improved Results for Data Migration and Open Shop Scheduling (RG, MMH, GK, HS), pp. 658–669.
- ICALP-2004-SandersSS #bound #migration #online #scheduling
- Online Scheduling with Bounded Migration (PS, NS, MS), pp. 1111–1122.
- AdaEurope-2004-BurnsWT #ada #scheduling
- Supporting Deadlines and EDF Scheduling in Ada (AB, AJW, STT), pp. 156–165.
- AdaEurope-2004-MinguetFGB #ada #policy #scheduling
- Mixing Scheduling Policies in Ada (AEM, AGF, VLG, ATB), pp. 273–282.
- AdaEurope-2004-RivasGH #ada #framework #implementation #scheduling
- Implementing an Application-Defined Scheduling Framework for Ada Tasking (MAR, FJMG, MGH), pp. 283–296.
- SIGAda-2004-SinghoffLNM #flexibility #framework #named #realtime #scheduling
- Cheddar: a flexible real time scheduling framework (FS, JL, LN, LM), pp. 1–8.
- ICEIS-v2-2004-EnnigrouG #approach #flexibility #multi #problem #scheduling
- Multi-Agent Approach Based on Tabu Search for the Flexible Job Shop Scheduling Problem (ME, KG), pp. 22–28.
- KR-2004-ZhangZ #integer #problem #scheduling
- An Improved Integer Local Search for Complex Scheduling Problems (WZ, XZ), pp. 692–700.
- UML-2004-BennettFW #evaluation #performance #scheduling #uml
- Experimental Evaluation of the UML Profile for Schedulability, Performance, and Time (AJB, AJF, CMW), pp. 143–157.
- GPCE-2004-LawallMM #component #design #domain-specific language #independence #on the
- On Designing a Target-Independent DSL for Safe OS Process-Scheduling Components (JLL, AFLM, GM), pp. 436–455.
- SAC-2004-BaggioWE #scheduling #workflow
- Applying scheduling techniques to minimize the number of late jobs in workflow systems (GB, JW, CAE), pp. 1396–1403.
- SAC-2004-ChenKY #constraints #energy #scheduling
- Profit-driven uniprocessor scheduling with energy and timing constraints (JJC, TWK, CLY), pp. 834–840.
- SAC-2004-JayapalaABDCC #energy #optimisation #scheduling
- L0 buffer energy optimization through scheduling and exploration (MJ, TVA, FB, GD, FC, HC), pp. 905–906.
- SAC-2004-PaulussenZHBPL #nondeterminism #scheduling
- Patient scheduling under uncertainty (TOP, AZ, AH, LB, AP, WL), pp. 309–310.
- SAC-2004-PreinfalkM #automation #framework #problem #scheduling
- Automatic construction of drama school timetables based on a generic evolutionary framework for allocation and scheduling problems (OP, HAM), pp. 996–1000.
- CGO-2004-KudlurFCRCM #heuristic #named #scheduling
- FLASH: Foresighted Latency-Aware Scheduling Heuristic for Processors with Customized Datapaths (MK, KF, MLC, RAR, NC, SAM), pp. 201–212.
- CGO-2004-SmelyanskiyMD #probability #scheduling
- Probabilistic Predicate-Aware Modulo Scheduling (MS, SAM, ESD), pp. 151–162.
- CGO-2004-Winkel #performance #scheduling
- Exploring the Performance Potential of Itanium® Processors with ILP-based Scheduling (SW), pp. 189–200.
- HPCA-2004-EhrhartP #predict #scheduling #using
- Reducing the Scheduling Critical Cycle Using Wakeup Prediction (TEE, SJP), pp. 222–231.
- HPCA-2004-HuVI #scheduling
- Exploring Wakeup-Free Instruction Scheduling (JSH, NV, MJI), pp. 232–243.
- HPCA-2004-KimL #comprehension #scheduling
- Understanding Scheduling Replay Schemes (IK, MHL), pp. 198–209.
- HPCA-2004-NarayanasamyHSC #convergence #string #using
- Creating Converged Trace Schedules Using String Matching (SN, YH, SS, BC), pp. 210–221.
- LCTES-2004-ImH #multi #realtime #scalability #scheduling #using
- Dynamic voltage scaling for real-time multi-task scheduling using buffers (CI, SH), pp. 88–94.
- LCTES-2004-JejurikarG #realtime #scheduling
- Procrastination scheduling in fixed priority real-time systems (RJ, RKG), pp. 57–66.
- SAT-2004-ZhangLS #satisfiability
- A SAT Based Scheduler for Tournament Schedules (HZ, DL, HS), pp. 191–196.
- VMCAI-2004-Vanackere #encryption #process #scheduling
- History-Dependent Scheduling for Cryptographic Processes (VV), pp. 16–29.
- DAC-2003-JersakE #analysis #dependence #multi #scheduling
- Enabling scheduling analysis of heterogeneous systems with multi-rate data dependencies and rate intervals (MJ, RE), pp. 454–459.
- DAC-2003-MeyerowitzPS #policy #realtime #scheduling
- A tool for describing and evaluating hierarchical real-time bus scheduling policies (TM, CP, ALSV), pp. 312–317.
- DAC-2003-PaulBNPT #design #modelling #multi #programmable
- Schedulers as model-based design elements in programmable heterogeneous multiprocessors (JMP, AB, JEN, JJP, DET), pp. 408–411.
- DATE-2003-ChoLYCZ #analysis #communication #design #scheduling
- Scheduling and Timing Analysis of HW/SW On-Chip Communication in MP SoC Design (YC, GL, SY, KC, NEZ), pp. 20132–20137.
- DATE-2003-KandemirCZK #embedded #scheduling
- Data Space Oriented Scheduling in Embedded Systems (MTK, GC, WZ, IK), pp. 10416–10421.
- DATE-2003-LomenaLWK #approach #explosion #performance #scheduling
- An Efficient Hash Table Based Approach to Avoid State Space Explosion in History Driven Quasi-Static Scheduling (AGL, MLLV, YW, AK), pp. 10428–10435.
- DATE-2003-MeiVVML #architecture #configuration management #parallel #scheduling #using
- Exploiting Loop-Level Parallelism on Coarse-Grained Reconfigurable Architectures Using Modulo Scheduling (BM, SV, DV, HDM, RL), pp. 10296–10301.
- DATE-2003-PillaiJ #clustering #scheduling
- Compiler-Directed ILP Extraction for Clustered VLIW/EPIC Machines: Predication, Speculation and Modulo Scheduling (SP, MFJ), pp. 10422–10427.
- DATE-2003-PopEP #analysis #clustering #distributed #embedded #multi #optimisation #scheduling #synthesis
- Schedulability Analysis and Optimization for the Synthesis of Multi-Cluster Distributed Embedded Systems (PP, PE, ZP), pp. 10184–10189.
- DATE-2003-WalderP #configuration management #online #scheduling
- Online Scheduling for Block-Partitioned Reconfigurable Devices (HW, MP), pp. 10290–10295.
- DATE-2003-WuAE #embedded #graph #power management #scheduling #synthesis
- Scheduling and Mapping of Conditional Task Graphs for the Synthesis of Low Power Embedded Systems (DW, BMAH, PE), pp. 10090–10095.
- SIGMOD-2003-BabcockBDM #data type #memory management #scheduling
- Chain : Operator Scheduling for Memory Minimization in Data Stream Systems (BB, SB, MD, RM), pp. 253–264.
- VLDB-2003-CarneyCZRCS #data type #scheduling
- Operator Scheduling in a Data Stream Manager (DC, UÇ, AR, SBZ, MC, MS), pp. 838–849.
- VLDB-2003-HammadFAE #data type #scheduling
- Scheduling for shared window joins over data streams (MAH, MJF, WGA, AKE), pp. 297–308.
- ESOP-2003-GenaimK #analysis #independence #logic programming #scheduling #source code
- Goal-Independent Suspension Analysis for Logic Programs with Dynamic Scheduling (SG, AK), pp. 84–98.
- TACAS-2003-AbdeddaimAM #nondeterminism #on the #scheduling
- On Optimal Scheduling under Uncertainty (YA, EA, OM), pp. 240–253.
- TACAS-2003-FersmanMPY #analysis #scheduling #using
- Schedulability Analysis Using Two Clocks (EF, LM, PP, WY), pp. 224–239.
- STOC-2003-BansalP #scheduling
- Server scheduling in the Lp norm: a rising tide lifts all boat (NB, KP), pp. 242–250.
- STOC-2003-GeorgiouRS #scheduling
- Work-competitive scheduling for cooperative computing with dynamic groups (CG, AR, AAS), pp. 251–258.
- ICALP-2003-DeanG #algorithm #approximate #scheduling
- Improved Approximation Algorithms for Minimum-Space Advertisement Scheduling (BCD, MXG), pp. 1138–1152.
- ICALP-2003-NaorST #realtime #scheduling
- Real-Time Scheduling with a Budget (JN, HS, TT), pp. 1123–1137.
- AdaEurope-2003-BurnsHW #ada #policy #scheduling
- A Round Robin Scheduling Policy for Ada (AB, MGH, AJW), pp. 334–343.
- SAC-2003-AptB #constraints #programming #rule-based
- Schedulers for Rule-Based Constraint Programming (KRA, SB), pp. 14–21.
- SAC-2003-AuyeungGD #algorithm #multi #scheduling #search-based
- Multi-Heuristic List Scheduling Genetic Algorithms for Task Scheduling (AA, IG, HKD), pp. 721–724.
- SAC-2003-LimRS #scheduling
- Manpower Scheduling with Time Windows (AL, BR, LS), pp. 741–746.
- ICSE-2003-Padberg #process #scheduling
- A Software Process Scheduling Simulator (FP), pp. 816–817.
- CGO-2003-GibertSG #clustering #distributed #memory management #scheduling
- Local Scheduling Techniques for Memory Coherence in a Clustered VLIW Processor with a Distributed Data Cache (EG, FJS, AG), pp. 193–203.
- CGO-2003-InagakiKN #architecture #compilation #java #scheduling
- Integrated Prepass Scheduling for a Java Just-In-Time Compiler on the IA-64 Architecture (TI, HK, TN), pp. 159–168.
- CGO-2003-SmelyanskiyMDL #constraints #scheduling
- Predicate-Aware Scheduling: A Technique for Reducing Resource Constraints (MS, SAM, ESD, HHSL), pp. 169–178.
- CGO-2003-SpadiniFPL
- Improving Quasi-Dynamic Schedules through Region Slip (FS, BF, SJP, SSL), pp. 149–158.
- HPDC-2003-TakefusaTMM #algorithm #analysis #architecture #energy #grid #performance #physics #replication #scheduling
- Performance Analysis of Scheduling and Replication Algorithms on Grid Datafarm Architecture for High-Energy Physics Applications (AT, OT, SM, YM), pp. 34–47.
- HPDC-2003-YangC #named #robust #scheduling
- RUMR: Robust Scheduling for Divisible Workloads (YY, HC), pp. 114–125.
- LCTES-2003-KarczmarekTA #scheduling #source code
- Phased scheduling of stream programs (MK, WT, SPA), pp. 103–112.
- LCTES-2003-PopEP #clustering #distributed #embedded #multi
- Schedulability-driven frame packing for multi-cluster distributed embedded systems (PP, PE, ZP), pp. 113–122.
- LCTES-2003-RobertzH #adaptation #embedded #garbage collection #realtime #robust #scheduling
- Time-triggered garbage collection: robust and adaptive real-time GC scheduling for embedded systems (SGR, RH), pp. 93–102.
- PPoPP-2003-Puppin #adaptation #convergence #machine learning #scheduling #using
- Adapting convergent scheduling using machine learning (DP), p. 1.
- SOSP-2003-YuanN #cpu #energy #mobile #multi #realtime #scheduling
- Energy-efficient soft real-time CPU scheduling for mobile multimedia systems (WY, KN), pp. 149–163.
- DAC-2002-ChakrabortyEKT #embedded #realtime #scheduling
- Schedulability of event-driven code blocks in real-time embedded systems (SC, TE, SK, LT), pp. 616–621.
- DAC-2002-ChoiK #code generation #scheduling
- Address assignment combined with scheduling in DSP code generation (YC, TK), pp. 225–230.
- DAC-2002-DelaluzSKVI #energy
- Scheduler-based DRAM energy management (VD, AS, MTK, NV, MJI), pp. 697–702.
- DAC-2002-IyengarCM #constraints #reduction #scheduling
- Wrapper/TAM co-optimization, constraint-driven test scheduling, and tester data volume reduction for SOCs (VI, KC, EJM), pp. 685–690.
- DAC-2002-RichterZJE #analysis #composition #design #framework #scheduling
- Model composition for scheduling analysis in platform design (KR, DZ, MJ, RE), pp. 287–292.
- DAC-2002-ZhangHC #energy #scheduling
- Task scheduling and voltage selection for energy minimization (YZ, XH, DZC), pp. 183–188.
- DATE-2002-ArrigoniDPLW #scheduling
- False Path Elimination in Quasi-Static Scheduling (GA, LD, CP, LL, YW), pp. 964–970.
- DATE-2002-AzevedoICGDVN #scheduling #using
- Profile-Based Dynamic Voltage Scheduling Using Program Checkpoints (AA, II, RC, RG, NDD, AVV, AN), pp. 168–175.
- DATE-2002-CabodiCQ #clustering #image #scheduling
- Dynamic Scheduling and Clustering in Symbolic Image Computation (GC, PC, SQ), pp. 150–156.
- DATE-2002-ChenS #scheduling #synthesis
- Power-Manageable Scheduling Technique for Control Dominated High-Level Synthesis (CC, MS), pp. 1016–1020.
- DATE-2002-FlottesPR #heuristic #scheduling
- A Heuristic for Test Scheduling at System Level (MLF, JP, BR), p. 1124.
- DATE-2002-GrajcarG #constraints #multi #scheduling
- Improved Constraints for Multiprocessor System Scheduling (MG, WG), p. 1096.
- DATE-2002-HassounCC #verification
- Verifying Clock Schedules in the Presence of Cross Talk (SH, ECG, CC), pp. 346–350.
- DATE-2002-KoranneC #network #problem #scheduling
- Formulation of SOC Test Scheduling as a Network Transportation Problem (SK, VSC), p. 1125.
- DATE-2002-LeeWH #design #implementation #multi #runtime
- Dynamic Runtime Re-Scheduling Allowing Multiple Implementations of a Task for Platform-Based Designs (TML, WW, JH), pp. 296–301.
- DATE-2002-QuanH #energy #scheduling
- Minimum Energy Fixed-Priority Scheduling for Variable Voltage Processor (GQ, XH), pp. 782–787.
- DATE-2002-Sanchez-ElezFMMKHB #architecture #configuration management #multi
- A Complete Data Scheduler for Multi-Context Reconfigurable Architectures (MSE, MF, RM, RH, NB, FJK), pp. 547–552.
- DATE-2002-SchmitzAE #distributed #embedded #energy #scheduling
- Energy-Efficient Mapping and Scheduling for DVS Enabled Distributed Embedded Systems (MTS, BMAH, PE), pp. 514–521.
- VLDB-2002-SenkulKT #constraints #framework #logic #resource management #scheduling #workflow
- A Logical Framework for Scheduling Workflows under Resource Allocation Constraints (PS, MK, IHT), pp. 694–705.
- TACAS-2002-AbdeddaimM #automaton #scheduling #using
- Preemptive Job-Shop Scheduling Using Stopwatch Automata (YA, OM), pp. 113–126.
- TACAS-2002-FersmanPY #automaton #decidability #process #scheduling
- Timed Automata with Asynchronous Processes: Schedulability and Decidability (EF, PP, WY), pp. 67–82.
- TACAS-2002-JinKS #analysis #reachability #scheduling
- Fine-Grain Conjunction Scheduling for Symbolic Reachability Analysis (HJ, AK, FS), pp. 312–326.
- TACAS-2002-Subramani #analysis #scheduling
- An Analysis of Zero-Clairvoyant Scheduling (KS), pp. 98–112.
- STOC-2002-Albers #on the #online #random #scheduling
- On randomized online scheduling (SA), pp. 134–143.
- STOC-2002-Bachmat #analysis #scheduling #sequence
- Average case analysis for batched disk scheduling and increasing subsequences (EB), pp. 277–286.
- STOC-2002-ChanLTW #analysis #video
- A unified analysis of hot video schedulers (WTC, TWL, HFT, PWHW), pp. 179–188.
- STOC-2002-Gacs #random #scheduling
- Clairvoyant scheduling of random walks (PG), pp. 99–108.
- STOC-2002-Kontogiannis #algorithm #bound #online #scheduling
- Lower bounds & competitive algorithms for online scheduling of unit-size tasks to related machines (SCK), pp. 124–133.
- STOC-2002-ScharbrodtSS #analysis #scheduling
- A new average case analysis for completion time scheduling (MS, TS, AS), pp. 170–178.
- STOC-2002-SrinivasanA #multi #scheduling
- Optimal rate-based scheduling on multiprocessors (AS, JHA), pp. 189–198.
- ICALP-2002-ChrobakENSSTV #scheduling
- Preemptive Scheduling in Overloaded Systems (MC, LE, JN, JS, RvS, TT, NV), pp. 800–811.
- ICALP-2002-Damaschke #scheduling
- Scheduling Search Procedures (PD), pp. 281–292.
- ICALP-2002-KumarM #scheduling
- Improved Results for Stackelberg Scheduling Strategies (VSAK, MVM), pp. 776–787.
- ICGT-2002-BeckPS #graph transformation #problem #scheduling
- Graph Transformations for the Vehicle Routing and Job Shop Scheduling Problems (JCB, PP, ES), pp. 60–74.
- AdaEurope-2002-MedinaGDH #ada #analysis #component #distributed #modelling #realtime #scheduling
- Modeling and Schedulability Analysis of Hard Real-Time Distributed Systems Based on Ada Components (JLM, JJG, JMD, MGH), pp. 282–296.
- AdaEurope-2002-RivasH #interface #scheduling
- A POSIX-Ada Interface for Application-Defined Scheduling (MAR, MGH), pp. 136–150.
- CAiSE-2002-ZhuS #constraints #programming #scheduling
- A Meeting Scheduling System Based on Open Constraint Programming (KQZ, AES), pp. 792–796.
- ICEIS-2002-YooM #multi #scheduling #using
- Using Multi-Agent System for Dynamic Job Shop Scheduling (MJY, JPM), pp. 517–525.
- HPCA-2002-SuhDR #clustering #memory management #monitoring #scheduling
- A New Memory Monitoring Scheme for Memory-Aware Scheduling and Partitioning (GES, SD, LR), pp. 117–128.
- HPCA-2002-ZhuZZ #memory management #multi #scheduling
- Fine-Grain Priority Scheduling on Multi-Channel Memory Systems (ZZ, ZZ, XZ), pp. 107–116.
- HPDC-2002-RanganathanF #data-driven #distributed #scheduling
- Decoupling Computation and Data Scheduling in Distributed Data-Intensive Applications (KR, ITF), pp. 352–358.
- HPDC-2002-SubramaniKSS #distributed #multi #scheduling #using
- Distributed Job Scheduling on Computational Grids Using Multiple Simultaneous Requests (VS, RK, SS, PS), p. 359–?.
- LCTES-SCOPES-2002-DudaniMZ #constraints #embedded #energy #feedback #realtime #scheduling
- Energy-conserving feedback EDF scheduling for embedded systems with real-time constraints (AD, FM, YZ), pp. 213–222.
- LCTES-SCOPES-2002-FengH #automation #verification
- Automatic formal verification for scheduled VLIW code (XF, AJH), pp. 85–92.
- LCTES-SCOPES-2002-KimHK #design #object-oriented #realtime #scheduling
- Perfecting preemption threshold scheduling for object-oriented real-time system design: from the perspective of real-time synchronization (SK, SH, THK), pp. 223–232.
- ISSTA-2002-ChoiZ #concurrent #thread
- Isolating failure-inducing thread schedules (JDC, AZ), pp. 210–220.
- SAT-2002-Zhang #generative #satisfiability
- Generating college conference basketball schedules by a SAT solver (HZ), p. 39.
- DAC-2001-BazarganOS #architecture #compilation #configuration management #design #physics #scheduling
- Integrating Scheduling and Physical Design into a Coherent Compilation Cycle for Reconfigurable Computing Architectures (KB, SO, MS), pp. 635–640.
- DAC-2001-KudlugiST #functional #multi #scheduling #verification
- Static Scheduling of Multiple Asynchronous Domains For Functional Verification (MK, CS, RT), pp. 647–652.
- DAC-2001-LiuCBK #constraints #embedded #power management #scheduling
- Power-Aware Scheduling under Timing Constraints for Mission-Critical Embedded Systems (JL, PHC, NB, FJK), pp. 840–845.
- DAC-2001-LuoJ #distributed #embedded #realtime #scheduling
- Battery-Aware Static Scheduling for Distributed Real-Time Embedded Systems (JL, NKJ), pp. 444–449.
- DAC-2001-QuanH #energy #performance #realtime #scheduling
- Energy Efficient Fixed-Priority Scheduling for Real-Time Systems on Variable Voltage Processors (GQ, XH), pp. 828–833.
- DAC-2001-ShinKL #analysis #energy #scheduling #using
- Low-Energy Intra-Task Voltage Scheduling Using Static Timing Analysis (DS, JK, SL), pp. 438–443.
- DAC-2001-WuHCWW #algorithm #generative #multi #scheduling
- Simulation-Based Test Algorithm Generation and Port Scheduling for Multi-Port Memories (CFW, CTH, KLC, CWW, CWW), pp. 301–306.
- DATE-2001-BeniniCMMPS #scheduling
- Extending lifetime of portable systems by battery scheduling (LB, GC, AM, EM, MP, RS), pp. 197–203.
- DATE-2001-PasseroneWL #generative #graph #scheduling
- Generation of minimal size code for scheduling graphs (CP, YW, LL), pp. 668–673.
- DATE-2001-PintoMEJ #constraints #scheduling
- Constraint satisfaction for storage files with Fifos or stacks during scheduling (CAAP, BM, KvE, JAGJ), p. 824.
- DATE-2001-SaitohAT #clustering #performance #scheduling
- Clustering based fast clock scheduling for light clock-tree (MS, MA, AT), pp. 240–245.
- DATE-2001-XieW #graph #hardware #scheduling
- Allocation and scheduling of conditional task graph in hardware/software co-synthesis (YX, WW), pp. 620–625.
- VLDB-2001-UrhanF #interactive #performance #pipes and filters #query #scheduling
- Dynamic Pipeline Scheduling for Improving Interactive Query Performance (TU, MJF), pp. 501–510.
- ESOP-2001-BossiERS #logic programming #scheduling #semantics #source code #termination
- Semantics and Termination of Simply-Moded Logic Programs with Dynamic Scheduling (AB, SE, SR, JGS), pp. 402–416.
- PLDI-2001-ThiesVSA #framework #optimisation
- A Unified Framework for Schedule and Storage Optimization (WT, FV, JS, SPA), pp. 232–242.
- SAS-2001-SharpM #hardware #scheduling
- Soft Scheduling for Hardware (RS, AM), pp. 57–72.
- STOC-2001-BecchettiL #parallel #scheduling
- Non-clairvoyant scheduling to minimize the average flow time on single and parallel machines (LB, SL), pp. 94–103.
- STOC-2001-Roughgarden #scheduling
- Stackelberg scheduling strategies (TR), pp. 104–113.
- CIAA-2001-DubernardG #automaton #finite #generative #scheduling
- Scheduling Hard Sporadic Tasks by Means of Finite Automata and Generating Functions (JPD, DG), pp. 87–100.
- ICALP-2001-ChrobakCINSW #multi #problem #scheduling
- The Buffer Minimization Problem for Multiprocessor Scheduling with Conflicts (MC, JC, CI, JN, JS, GJW), pp. 862–874.
- ICALP-2001-Woeginger #constraints #on the #precedence #scheduling
- On the Approximability of Average Completion Time Scheduling under Precedence Constraints (GJW), pp. 887–897.
- AdaEurope-2001-BernatB #ada #flexibility #implementation
- Implementing a Flexible Scheduler in Ada (GB, AB), pp. 179–190.
- ICEIS-v1-2001-ReisM #constraints #multi #scheduling
- Multi-Agent Dynamic Scheduling and Re-Scheduling with Global Temporal Constraints (JR, NJM), pp. 315–321.
- ICEIS-v1-2001-WongC #optimisation #scheduling
- Optimizing User Preferences While Scheduling Meetings (RYMW, AHWC), pp. 459–465.
- SAC-2001-YajimaHTN #correlation #scheduling
- Scheduling and caching strategies for broadcasting correlated data (EY, TH, MT, SN), pp. 504–510.
- ICSE-2001-FeilerW #adaptation #feedback #incremental #scheduling
- Adaptive Feedback Scheduling of Incremental and Design-to-Time Tasks (PHF, JJW), pp. 318–326.
- CC-2001-Gregg #scheduling
- Comparing Tail Duplication with Compensation Code in Single Path Global Instruction Scheduling (DG), pp. 200–212.
- HPCA-2001-WangWKRS #execution #scheduling
- Register Renaming and Scheduling for Dynamic Execution of Predicated Code (PHW, HW, RMK, KR, JPS), pp. 15–25.
- HPDC-2001-JardineSC #concurrent
- Livelock Avoidance for Meta-Schedulers (JJ, QS, MJC), pp. 141–146.
- HPDC-2001-RomeinB #scheduling
- Wide-Area Transposition-Driven Scheduling (JWR, HEB), pp. 347–355.
- HPDC-2001-TakefusaMCB #case study #grid #scheduling
- A Study of Deadline Scheduling for Client-Server Systems on the Computational Grid (AT, SM, HC, FB), pp. 406–405.
- LCTES-OM-2001-KastnerW #scheduling
- ILP-based Instruction Scheduling for IA-64 (DK, SW), pp. 145–154.
- LCTES-OM-2001-LarusP #performance #scheduling #using
- Using Cohort Scheduling to Enhance Server Performance (Extended Abstract) (JRL, MP), pp. 182–187.
- SOSP-2001-IyerD #framework #scheduling
- Anticipatory scheduling: A disk scheduling framework to overcome deceptive idleness in synchronous I/O (SI, PD), pp. 117–130.
- CAV-2001-AbdeddaimM #automaton #scheduling #using
- Job-Shop Scheduling Using Timed Automata (YA, OM), pp. 478–492.
- DAC-2000-CortadellaKLMMPWS #embedded #generative #scheduling
- Task generation and compile-time scheduling for mixed data-control embedded software (JC, AK, LL, MM, SM, CP, YW, ALSV), pp. 489–494.
- DAC-2000-McDonaldB #clustering #scheduling #simulation #using
- Symbolic timing simulation using cluster scheduling (CBM, REB), pp. 254–259.
- DAC-2000-NarasimhanR #bound #on the #problem #scheduling #synthesis
- On lower bounds for scheduling problems in high-level synthesis (MN, JR), pp. 546–551.
- DAC-2000-NataleSB #constraints #scheduling
- Task scheduling with RT constraints (MDN, ALSV, FB), pp. 483–488.
- DAC-2000-ShinKC #analysis #embedded #multi #performance #realtime
- Schedulability-driven performance analysis of multiple mode embedded real-time systems (YS, DK, KC), pp. 495–500.
- DAC-2000-WangKS #clustering #latency #memory management #scheduling
- Optimal two level partitioning and loop scheduling for hiding memory latency for DSP applications (ZW, MK, EHMS), pp. 540–545.
- DATE-2000-GovindarajanV #quality #scheduling
- Improving the Schedule Quality of Static-List Time-Constrained Scheduling (SG, RV), p. 749.
- DATE-2000-KruseSJSN #bound #constraints #data flow #graph #power management
- Lower Bounds on the Power Consumption in Scheduled Data Flow Graphs with Resource Constraints (LK, ES, GJ, AS, WN), p. 737.
- DATE-2000-PopEP #analysis #distributed #embedded #optimisation #scheduling
- Bus Access Optimization for Distributed Embedded Systems Based on Schedulability Analysis (PP, PE, ZP), pp. 567–574.
- PLDI-2000-WilkenLH #integer #programming #scheduling #using
- Optimal instruction scheduling using integer programming (KDW, JL, MH), pp. 121–133.
- STOC-2000-Bar-NoyBFNS #approach #approximate #resource management #scheduling
- A unified approach to approximating resource allocation and scheduling (ABN, RBY, AF, JN, BS), pp. 735–744.
- STOC-2000-BermanD #realtime #scheduling
- Improvements in throughout maximization for real-time scheduling (PB, BD), pp. 680–687.
- STOC-2000-CzumajS #algorithm #approach #problem #satisfiability #scheduling
- A new algorithm approach to the general Lovász local lemma with applications to scheduling and satisfiability problems (extended abstract) (AC, CS), pp. 38–47.
- ICALP-2000-JansenP #approximate #multi #scheduling
- Polynominal Time Approximation Schemes for General Multiprocessor Job Shop Scheduling (KJ, LP), pp. 878–889.
- ICEIS-2000-ReisM #architecture #multi #scheduling
- An Agent Architecture for Multi-Agent Dynamic Scheduling (JR, NJM), pp. 203–208.
- TOOLS-EUROPE-2000-GimenesTO #framework #object-oriented #scheduling
- An Object Oriented Framework for Task Scheduling (IMdSG, SAT, JPMdO), p. 383–?.
- PADL-2000-YunesMS #approach #hybrid #problem #scalability #scheduling
- A Hybrid Approach for Solving Large Scale Crew Scheduling Problems (THY, AVM, CCdS), pp. 293–307.
- SAC-2000-LeeKHL #dependence #graph #scheduling #using
- Task Scheduling using a Block Dependency DAG for Block-Oriented Sparse Cholesky Factorization (HL, JK, SJH, SL), pp. 641–648.
- SAC-2000-YunesMS #problem #scalability #scheduling
- Solving Very Large Crew Scheduling Problems to Optimality (THY, AVM, CCdS), pp. 446–451.
- ICSE-2000-NordPS #architecture #tutorial #using
- Planning realistic schedules using software architecture (tutorial session) (RLN, DJP, DS), p. 824.
- ICSE-2000-PenixVELW #clustering #kernel #verification
- Verification of time partitioning in the DEOS scheduler kernel (JP, WV, EE, AL, NW), pp. 488–497.
- ASPLOS-2000-MattsonDRKO #communication #scheduling
- Communication Scheduling (PRM, WJD, SR, UJK, JDO), pp. 82–92.
- LCTES-2000-BelloM #network #scheduling
- Randomization-Based Approaches for Dynamic Priority Scheduling of Aperiodic Messages on a CAN Network (LLB, OM), pp. 1–18.
- OSDI-2000-ChandraAGS #algorithm #cpu #multi #scheduling #symmetry
- Surplus Fair Scheduling: A Proportional-Share CPU Scheduling Algorithm for Symmetric Multiprocessors (AC, MA, PG, PJS), pp. 45–58.
- OSDI-2000-GrunwaldLFMN #policy #scheduling
- Policies for Dynamic Clock Scheduling (DG, PL, KIF, CBMI, MN), pp. 73–86.
- ASE-1999-EmersonB #constraints #development #specification #synthesis
- Development of a Constraint-Based Airlift Scheduler by Program Synthesis from Formal Specifications (TE, MHB), pp. 267–270.
- DAC-1999-Grajcar #algorithm #multi #scheduling #search-based
- Genetic List Scheduling Algorithm for Scheduling and Allocation on a Loosely Coupled Heterogeneous Multiprocessor System (MG), pp. 280–285.
- DAC-1999-HaynalB #component #scheduling
- A Model for Scheduling Protocol-Constrained Components and Environments (SH, FB), pp. 292–295.
- DAC-1999-LiuPF #performance #scheduling
- Maximizing Performance by Retiming and Clock Skew Scheduling (XL, MCP, EGF), pp. 231–236.
- DAC-1999-ParkC #scheduling
- Performance-Driven Scheduling with Bit-Level Chaining (SP, KC), pp. 286–291.
- DAC-1999-ShinC #realtime #scheduling
- Power Conscious Fixed Priority Scheduling for Hard Real-Time Systems (YS, KC), pp. 134–139.
- DAC-1999-ZhuG #scheduling #synthesis
- Soft Scheduling in High Level Synthesis (JZ, DG), pp. 219–224.
- DATE-1999-EvekingHR #automation #scheduling #synthesis #verification
- Automatic Verification of Scheduling Results in High-Level Synthesis (HE, HH, GR), pp. 59–64.
- DATE-1999-JaschkeLB #resource management #scheduling
- Time Constrained Modulo Scheduling with Global Resource Sharing (CJ, RL, FB), pp. 210–216.
- DATE-1999-Kuchcinski #constraints #finite #graph #scheduling #using
- Integrated Resource Assignment and Scheduling of Task Graphs Using Finite Domain Constraints (KK), pp. 772–773.
- DATE-1999-MaestreKBSHF #configuration management #kernel #scheduling
- Kernel Scheduling in Reconfigurable Computing (RM, FJK, NB, HS, RH, MF), pp. 90–96.
- TACAS-1999-HsiungWK #scheduling #verification
- Scheduling System Verification (PAH, FW, YSK), pp. 19–33.
- STOC-1999-Bar-NoyGNS #approximate #multi #realtime #scheduling #throughput
- Approximating the Throughput of Multiple Machines Under Real-Time Scheduling (ABN, SG, JN, BS), pp. 622–631.
- STOC-1999-ChenM #approximate #multi #polynomial #scheduling
- A Polynomial Time Approximation Scheme for General Multiprocessor Job Scheduling (Extended Abstract) (JC, AM), pp. 418–427.
- STOC-1999-Edmonds #scheduling
- Scheduling in the Dark (JE), pp. 179–188.
- STOC-1999-GoelHPT #data transfer #network #problem #scheduling #set
- Scheduling Data Transfers in a Network and the Set Scheduling Problem (AG, MRH, SAP, ÉT), pp. 189–197.
- STOC-1999-JansenP #approximate #parallel #scheduling
- Improved Approximation Schemes for Scheduling Unrelated Parallel Machines (KJ, LP), pp. 408–417.
- SIGAda-1999-RusanovaK #distributed #parallel #problem #scheduling
- Scheduling problems for parallel and distributed systems (OR, AK), pp. 195–201.
- ICEIS-1999-AbeT #analysis #development #process #scheduling
- IDEFO-Based Software Process Analysis for Scheduling Systems Development (AA, TT), pp. 361–370.
- ICEIS-1999-PsarrasMMA #industrial #optimisation #problem #scheduling
- Optimizing a Real-World Scheduling Problem in the Steel Industry (JEP, GM, IM, DA), p. 767.
- ICEIS-1999-Serrano #constraints #semantics #specification
- Marta Jacinto, João Paulo Cunha: Specifying Semantic Constraints for a Healthcare Scheduler (JAVS), pp. 517–524.
- ICEIS-1999-SilvaR #architecture #scheduling
- Holonic Dynamic Scheduling Architecture and Services (NS, CR), pp. 300–307.
- CIKM-1999-HuLL #clustering #scheduling
- Indexing Techniques for Wireless Data Broadcast Under Data Clustering and Scheduling (QH, WCL, DLL), pp. 351–358.
- CIKM-1999-LimKO #scheduling
- Page Access Scheduling in Join Processing (AL, JLPK, WCO), pp. 276–283.
- ICML-1999-AbeN #internet #learning
- Learning to Optimally Schedule Internet Banner Advertisements (NA, AN), pp. 12–21.
- ICML-1999-GervasioIL #adaptation #evaluation #learning #scheduling
- Learning User Evaluation Functions for Adaptive Scheduling Assistance (MTG, WI, PL), pp. 152–161.
- PADL-1999-CarlssonKA #constraints #resource management #scheduling
- Constraint-Based Resource Allocation and Scheduling in Steel Manufacturing (MC, PK, EÅ), pp. 335–349.
- SAC-1999-BrestZO #clustering #scheduling
- Dynamic Scheduling on a PC Cluster (JB, VZ, MO), pp. 496–500.
- SAC-1999-CraneWS #algorithm #multi #pipes and filters #scheduling #search-based #using
- Scheduling of Multi-Product Fungible Liquid Pipelines Using Genetic Algorithms (DSC, RLW, DAS), pp. 280–285.
- SAC-1999-GollaL #architecture #functional #logic #parallel #scheduling #thread
- A Dynamic Scheduling Logic for Exploiting Multiple Functional Units in Single Ship Multithreaded Architectures (PNG, ECL), pp. 466–473.
- SAC-1999-Lee #multi #scheduling
- Artificial Intelligence Search Methods for Multi-Machine Two-Stage Scheduling (IL), pp. 31–35.
- ESEC-FSE-1999-BrabermanF #automation #design #realtime #scheduling #verification
- Verification of Real-Time Designs: Combining Scheduling Theory with Automatic Formal Verification (VAB, MF), pp. 494–510.
- ICSE-1999-KeyesDC #analysis #framework
- Analysis of a Scheduler for a CAD Framework (DSK, LKD, MJC), pp. 152–161.
- CC-1999-Dinechin #memory management #scheduling
- Extending Modulo Scheduling with Memory Reference Merging (BDdD), pp. 274–287.
- HPCA-1999-FernandesLT #distributed #scheduling
- Distributed Modulo Scheduling (MMF, JL, NPT), pp. 130–134.
- HPDC-1999-GopalanSMA #named #scheduling
- Baglets: Adding Hierarchical Scheduling to Aglets (AG, SS, MM, DA), pp. 229–235.
- HPDC-1999-JamesH #scheduling
- Remote Application Scheduling on Metacomputing Systems (HAJ, KAH), pp. 349–350.
- HPDC-1999-TakefusaMNAN #algorithm #bibliography #evaluation #performance #scheduling
- Overview of a Performance Evaluation System for Global Computing Scheduling Algorithms (AT, SM, HN, KA, UN), pp. 97–104.
- HPDC-1999-ZotkinK #estimation #performance
- Job-Length Estimation and Performance in Backfilling Schedulers (DNZ, PJK), pp. 236–243.
- LCTES-1999-KimCKS #embedded #garbage collection #realtime #scheduling
- Scheduling Garbage Collector for Embedded Real-Time Systems (TK, NC, NK, HS), pp. 55–64.
- LCTES-1999-StotzerL #architecture #scheduling
- Modulo Scheduling for the TMS320C6x VLIW DSP Architecture (ES, ELL), pp. 28–34.
- OSDI-1999-Baker-Harvey #multi #resource management #scheduling
- ETI Resource Distributor: Guaranteed Resource Allocation and Scheduling in Multimedia Systems (MBH), pp. 131–144.
- OSDI-1999-SteereGGMPW #scheduling
- A Feedback-driven Proportion Allocator for Real-Rate Scheduling (DCS, AG, JG, DM, CP, JW), pp. 145–158.
- SOSP-1999-DudaC #scheduling #thread
- Borrowed-virtual-time (BVT) scheduling: supporting latency-sensitive threads in a general-purpose schedular (KJD, DRC), pp. 261–276.
- ASE-1998-BlaineGLSW #named #synthesis
- Planware — Domain-Specific Synthesis of High-Performance Schedulers (LB, LG, JL, DRS, SJW), p. 270–?.
- DAC-1998-HanonoD #code generation #resource management #scheduling
- Instruction Selection, Resource Allocation, and Scheduling in the AVIV Retargetable Code Generator (SH, SD), pp. 510–515.
- DAC-1998-LakshminarayanaRJ #behaviour #control flow #execution #scheduling
- Incorporating Speculative Execution into Scheduling of Control-Flow Intensive Behavioral Descriptions (GL, AR, NKJ), pp. 108–113.
- DATE-1998-ElesKPDP #embedded #graph #process #scheduling #synthesis
- Scheduling of Conditional Process Graphs for the Synthesis of Embedded Systems (PE, KK, ZP, AD, PP), pp. 132–138.
- DATE-1998-Lin #compilation #concurrent #performance #runtime #scheduling #source code
- Efficient Compilation of Process-Based Concurrent Programs without Run-Time Scheduling (BL), pp. 211–217.
- DATE-1998-ObergHK #communication #grammarware #hardware #protocol #scheduling #synthesis
- Scheduling of Outputs in Grammar-based Hardware Synthesis of Data Communication Protocols (JÖ, AH, AK), pp. 596–603.
- DATE-1998-ParulkarGB #scheduling
- Scheduling and Module Assignment for Reducing Bist Resources (IP, SKG, MAB), pp. 66–73.
- DATE-1998-Prihozhy #scheduling
- Asynchronous Scheduling and Allocation (AP), pp. 963–964.
- DATE-1998-TomiyamaIIY #design #reduction #scheduling
- Instruction Scheduling for Power Reduction in Processor-Based System Design (HT, TI, AI, HY), pp. 855–860.
- DATE-1998-YangP #algorithm #performance #scheduling #synthesis
- An Efficient Algorithm to Integrate Scheduling and Allocation in High-Level Test Synthesis (LTY, ZP), pp. 74–81.
- VLDB-1998-GarofalakisIO #multi #scheduling
- Resource Scheduling for Composite Multimedia Objects (MNG, YEI, BÖ), pp. 74–85.
- STOC-1998-FeigeS #bound #scheduling
- Improved Bounds for Acyclic Job Shop Scheduling (Extended Abstract) (UF, CS), pp. 624–633.
- CIKM-1998-BouganimKV #adaptation #execution #query #scalability #scheduling
- Memory-Adaptive Scheduling for Large Query Execution (LB, OK, PV), pp. 105–115.
- ICML-1998-SchneiderBM #scheduling
- Value Function Based Production Scheduling (JGS, JAB, AWM), pp. 522–530.
- SAC-1998-HuangE #behaviour #scheduling
- Scheduling control mechanisms for managing indeterminate object behavior (EHH, TE), pp. 650–654.
- SAC-1998-SchildW #realtime #scheduling
- Off-line scheduling of a real-time system (KS, JW), pp. 29–38.
- ASPLOS-1998-FuJLC #performance #scheduling
- Value Speculation Scheduling for High Performance Processors (CyF, MDJ, SYL, TMC), pp. 262–271.
- ASPLOS-1998-LeeBFSBSA #parallel #scheduling
- Space-Time Scheduling of Instruction-Level Parallelism on a Raw Machine (WL, RB, MF, DS, JB, VS, SPA), pp. 46–57.
- ASPLOS-1998-StroutCFS #independence
- Schedule-Independent Storage Mapping for Loops (MMS, LC, JF, BS), pp. 24–33.
- CC-1998-Gupta #framework #scheduling
- A Code Motion Framework for Global Instruction Scheduling (RG), pp. 219–233.
- CC-1998-LelaitGE #algorithm #performance
- A New Fast Algorithm for Optimal Register Allocation in Modulo Scheduled Loops (SL, GRG, CE), pp. 204–218.
- HPCA-1998-HavankiBC #scheduling
- Treegion Scheduling for Wide Issue Processors (WAH, SB, TMC), pp. 266–276.
- HPDC-1998-AidaTNMN #effectiveness #evaluation #performance #scheduling
- A Performance Evaluation Model for Effective Job Scheduling in Global Computing Systems (KA, AT, HN, SM, UN), pp. 352–353.
- HPDC-1998-AndresenM #clustering #distributed #scheduling #towards
- Towards a Hierarchical Scheduling System for Distributed WWW Server Clusters (DA, TM), pp. 301–308.
- HPDC-1998-Weissman #named #scheduling
- Metascheduling: A Scheduling Model for Metacomputing Systems (JBW), pp. 348–349.
- LCTES-1998-CooperS #scheduling
- Non-local Instruction Scheduling with Limited Code Growth (KDC, PJS), pp. 193–207.
- LCTES-1998-KastnerT #scheduling
- Cache-Sensitive Pre-runtime Scheduling (DK, ST), pp. 131–145.
- LCTES-1998-LeeLLMK #memory management #realtime #scheduling
- Limited Preemptible Scheduling to Embrace Cache Memory in Real-Time Systems (SL, CGL, ML, SLM, CSK), pp. 51–64.
- CAV-1998-Wilding #policy #proving #realtime #scheduling
- A Machine-Checked Proof of the Optimality of a Real-Time Scheduling Policy (MW), pp. 369–378.
- JICSLP-1998-RaoRR #on the #scheduling
- On the Optimality of Scheduling Strategies in Subsumption-based Tabled Resolution (PR, CRR, IVR), pp. 310–324.
- DAC-1997-BalarinS #embedded #realtime #validation
- Schedule Validation for Embedded Reactive Real-Time Systems (FB, ALSV), pp. 52–57.
- EDTC-1997-GovindarajanV #algorithm #clustering #heuristic
- Cone-based clustering heuristic for list-scheduling algorithms (SG, RV), pp. 456–462.
- EDTC-1997-LiW #multi #scheduling
- Hierarchical scheduling and allocation of multirate systems on heterogeneous multiprocessors (YL, WW), pp. 134–139.
- EDTC-1997-MignotteP #scheduling #using
- Scheduling using mixed arithmetic: an ILP formulation (AM, OP), p. 621.
- EDTC-1997-OzimekVT #array #implementation #performance #scheduling
- Optimal scheduling for fast systolic array implementations (IO, RV, JFT), p. 620.
- EDTC-1997-VerhaeghLAM #approach #multi #scheduling
- Multidimensional periodic scheduling: a solution approach (WFJV, PERL, EHLA, JLvM), pp. 468–474.
- VLDB-1997-GarofalakisI #optimisation #parallel #query #scheduling
- Parallel Query Scheduling and Optimization with Time- and Space-Shared Resources (MNG, YEI), pp. 296–305.
- VLDB-1997-GarofalakisOS #database #scheduling
- Resource Scheduling in Enhanced Pay-Per-View Continuous Media Databases (MNG, BÖ, AS), pp. 516–525.
- PEPM-1997-EtalleGM #scheduling
- A Transformation System for CLP with Dynamic Scheduling and CCP (SE, MG, EM), pp. 137–150.
- PLDI-1997-EichenbergerD #performance
- Efficient Formulation for Optimal Modulo Schedulers (AEE, ESD), pp. 194–205.
- STOC-1997-Albers #bound #online #scheduling
- Better Bounds for Online Scheduling (SA), pp. 130–139.
- STOC-1997-EdmondsCBD #execution #multi #scheduling
- Non-clairvoyant Multiprocessor Scheduling of Jobs with Changing Execution Characteristics (Extended Abstract) (JE, DDC, TB, XD), pp. 120–129.
- STOC-1997-PhillipsSTW #scheduling
- Optimal Time-Critical Scheduling via Resource Augmentation (Extended Abstract) (CAP, CS, ET, JW), pp. 140–149.
- HCI-CC-1997-WaflerGRW #scheduling
- Complementary Function Allocation for Scheduling Tasks (TW, GG, CR, AW), pp. 261–264.
- HCI-SEC-1997-ChenH #scheduling
- A Decision Support System for Production Scheduling and Control (MBC, SLH), pp. 15–18.
- HCI-SEC-1997-NakamuraTK #interactive #modelling #scheduling
- The Human Scheduler’s Mental Models and Decision Aids of the Interactive Scheduling System (NN, JT, TK), pp. 87–90.
- AdaEurope-1997-HarbourGG #ada #implementation
- Implementing Application-Level Sporadic Server Schedulers in Ada 95 (MGH, JJGG, JCPG), pp. 125–136.
- CIKM-1997-LeeM #scheduling #transaction #validation
- Commit-Reordering Validation Scheme for Transaction Scheduling in Client-Server Based Teleputing Systems: COREV (YL, SM), pp. 59–66.
- SAC-1997-Mao #constraints #order #parallel #problem #scheduling
- A parallel multi-operation scheduling problem with machine order constraints (WM), pp. 473–477.
- SAC-1997-SongL #performance #predict #scheduling
- Performance prediction based loop scheduling for heterogeneous computing environment (YS, WML), pp. 413–421.
- SAC-1997-SurmaS #communication #hybrid #parallel #scheduling
- Hybrid static-dynamic communication scheduling for parallel systems (DRS, EHMS), pp. 374–379.
- HPCA-1997-FalsafiW #communication #parallel #scheduling
- Scheduling Communication on a SMP Node Parallel Machine (BF, DAW), pp. 128–138.
- HPDC-1997-SudoSS #scheduling #thread
- Distributed-Thread Scheduling Methods for Reducing Page-Thrashing (YS, SS, SS), pp. 356–364.
- HPDC-1997-WeissmanZ #parallel #runtime #scheduling
- Run-time Support for Scheduling Parallel Applications in Heterogeneous NOWs (JBW, XZ), pp. 347–355.
- HPDC-1997-Wolski #network #performance #scheduling #using
- Forecasting Network Performance to Support Dynamic Scheduling using the Network Weather Service (RW), pp. 316–325.
- SOSP-1997-BoloskyF #distributed #video
- Distributed Schedule Management in the Tiger Video Fileserver (WJB, RPF, JRD), pp. 212–223.
- SOSP-1997-JonesRR #constraints #cpu #independence #performance #predict #process #scheduling
- CPU Reservations and Time Constraints: Efficient, Predictable Scheduling of Independent Activities (MBJ, DR, MCR), pp. 198–211.
- SOSP-1997-NiehL #design #evaluation #implementation #multi
- The Design, Implementation and Evaluation of SMART: A Scheduler for Multimedia Applications (JN, MSL), pp. 184–197.
- ICLP-1997-PueblaBMS #logic programming #optimisation #scheduling #source code
- Optimization of Logic Programs with Dynamic Scheduling (GP, MJGdlB, KM, PJS), pp. 93–107.
- DAC-1996-ErcanliP #scheduling #synthesis
- A Register File and Scheduling Model for Application Specific Processor Synthesis (EE, CAP), pp. 35–40.
- DAC-1996-MonteiroDAM #power management #scheduling
- Scheduling Techniques to Enable Power Management (JM, SD, PA, AM), pp. 349–352.
- DAC-1996-NevesF #process #scheduling
- Optimal Clock Skew Scheduling Tolerant to Process Variations (JLN, EGF), pp. 623–628.
- DAC-1996-ParulkarGB #bound #data flow #graph
- Lower Bounds on Test Resources for Scheduled Data Flow Graphs (IP, SKG, MAB), pp. 143–148.
- KBSE-1996-GomesSW #synthesis
- Synthesis of Schedulers for Planned Shutdowns of Power Plants (CPG, DRS, SJW), p. 6.
- SIGMOD-1996-GarofalakisI #parallel #query #scheduling
- Multi-dimensional Resource Scheduling for Parallel Queries (MNG, YEI), pp. 365–376.
- SIGMOD-1996-HillyerS #online #random #scheduling
- Random I/O Scheduling in Online Tertiary Storage Systems (BH, AS), pp. 195–204.
- PLDI-1996-EichenbergerD #constraints #multi #pipes and filters #scheduling
- A Reduced Multipipeline Machine Description that Preserves Scheduling Constraints (AEE, ESD), pp. 12–22.
- SAS-1996-BoerGP #constraints #correctness #logic programming #proving #scheduling #source code
- Proving Correctness of Constraint Logic Programs with Dynamic Scheduling (FSdB, MG, CP), pp. 83–97.
- STOC-1996-McCormick #algorithm #parametricity #performance #scheduling
- Fast Algorithms for Parametric Scheduling Come from Extensions to Parametric Maximum Flow (STM), pp. 319–328.
- ICALP-1996-AumannB #performance
- Efficient Asynchronous Consensus with the Value-Oblivious Adversary Scheduler (YA, MAB), pp. 622–633.
- ICALP-1996-ChakrabartiPSSSW #algorithm #scheduling
- Improved Scheduling Algorithms for Minsum Criteria (SC, CAP, ASS, DBS, CS, JW), pp. 646–657.
- FME-1996-FidgeUKH #realtime #refinement #scheduling
- Integrating Real-Time Scheduling Theory and Program Refinement (CJF, MU, PK, IJH), pp. 327–346.
- FME-1996-Jackson #case study #embedded #experience #scheduling
- Experiences in Embedded Scheduling (DMJ), pp. 445–464.
- ALP-1996-BandaHM #independence #logic
- Independence in Dynamically Scheduled Logic Languages (MJGdlB, MVH, KM), pp. 47–61.
- PLILP-1996-FreireSW #logic programming #scheduling #source code
- Beyond Depth-First: Improving Tabled Logic Programs through Alternative Scheduling Strategies (JF, TS, DSW), pp. 243–258.
- PLILP-1996-Kessler #graph #scheduling
- Scheduling Expression DAGs for Minimal Register Need (CWK), pp. 228–242.
- PLILP-1996-PueblaH #automation #logic programming #optimisation #scheduling #source code
- Automatic Optimization of Dynamic Scheduling in Logic Programs (GP, MVH), pp. 475–476.
- ASPLOS-1996-PhilbinEADL #concurrent #locality #scheduling #thread
- Thread Scheduling for Cache Locality (JP, JE, OJA, CCD, KL), pp. 60–71.
- CC-1996-PfahlerP #comparison #pipes and filters #scheduling
- A Comparison of Modulo Scheduling Techniques for Software Pipelining (PP, GP), pp. 18–32.
- HPCA-1996-FarkasJC #design
- Register File Design Considerations in Dynamically Scheduled Processors (KIF, NPJ, PC), pp. 40–51.
- HPCA-1996-GovindarajanAG #hardware #pipes and filters
- Co-Scheduling Hardware and Software Pipelines (RG, ERA, GRG), pp. 52–61.
- HPDC-1996-AgasaveeranL #distributed #multi #scheduling
- Distributed Job Scheduling in SCI Local — Area Multiprocessors (SA, QL), pp. 606–615.
- HPDC-1996-BermanW #scheduling
- Scheduling from the Perspective of the Application (FB, RW), pp. 100–111.
- HPDC-1996-WeissmanG #scheduling
- A Federated Model for Scheduling in Wide-Area Systems (JBW, ASG), pp. 542–550.
- JICSLP-1996-CaseauL #cumulative #scheduling
- Cumulative Scheduling with Task Intervals (YC, FL), pp. 363–377.
- DAC-1995-ChouB #embedded #fine-grained #scheduling
- Interval Scheduling: Fine-Grained Code Scheduling for Embedded Systems (PHC, GB), pp. 462–467.
- DAC-1995-JohnsonB #design
- Incorporating Design Schedule Management into a Flow Management System (EWJ, JBB), pp. 82–87.
- DAC-1995-LyKMM #behaviour #scheduling #using
- Scheduling Using Behavioral Templates (TL, DK, RM, DM), pp. 101–106.
- DAC-1995-TimmerSMJ #code generation #modelling #scheduling
- Conflict Modelling and Instruction Scheduling in Code Generation for In-House DSP Cores (AHT, MTJS, JLvM, JAGJ), pp. 593–598.
- PODS-1995-ChekuriHM #optimisation #parallel #problem #query #scheduling
- Scheduling Problems in Parallel Query Optimization (CC, WH, RM), pp. 255–265.
- PEPM-1995-Goubault #automaton #higher-order #interpreter
- Schedulers as Abstract Interpreter of Higher Dimensional Automata (EG), pp. 134–145.
- PLDI-1995-AltmanGG #pipes and filters #scheduling
- Scheduling and Mapping: Software Pipelining in the Presence of Structural Hazards (ERA, RG, GRG), pp. 139–150.
- PLDI-1995-LoE #compilation #optimisation #parallel #scheduling
- Improving Balanced Scheduling with Compiler Optimizations that Increase Instruction-Level Parallelism (JLL, SJE), pp. 151–162.
- STOC-1995-CanettiI #bound #power of #random #scheduling
- Bounding the power of preemption in randomized scheduling (RC, SI), pp. 606–615.
- ICALP-1995-LeonardiM #online #resource management #scheduling
- On-line Resource Management with Applications to Routing and Scheduling (SL, AMS), pp. 303–314.
- FPCA-1995-MiraniH
- First-Class Schedules and Virtual Maps (RM, PH), pp. 78–85.
- CIKM-1995-HameurlainM #execution #parallel #query #scheduling #sql
- Scheduling and Mapping for Parallel Execution of Extended SQL Queries (AH, FM), pp. 197–204.
- ICML-1995-Blum #algorithm #empirical #scheduling
- Empirical Support for Winnow and Weighted-Majority Based Algorithms: Results on a Calendar Scheduling Domain (AB), pp. 64–72.
- OOPSLA-1995-AllenC #scheduling #statechart
- Extending the Statechart Formalism: Event Scheduling & Disposition (AA, DdC), pp. 1–16.
- RE-1995-LamsweerdeDM #lessons learnt #problem #requirements
- Goal-directed elaboration of requirements for a meeting scheduler: problems and lessons learnt (AvL, RD, PM), pp. 194–203.
- SAC-1995-LiangL #algorithm #matrix #representation #scheduling #search-based #using
- A sparse matrix representation for production scheduling using genetic algorithms (SJTL, JML), pp. 313–317.
- HPCA-1995-FiskeD #concurrent #parallel #scheduling #thread
- Thread Prioritization: A Thread Scheduling Mechanism for Multiple-Context Parallel Processors (SF, WJD), pp. 210–221.
- HPDC-1995-CierniakLZ #scheduling
- Loop Scheduling for Heterogeneity (MC, WL, MJZ), pp. 78–85.
- HPDC-1995-SalehiKT #network #parallel #performance #scheduling
- The Performance Impact of Scheduling for Cache Affinity in Parallel Network Processing (JDS, JFK, DFT), pp. 66–77.
- LCT-RTS-1995-BakkersSP #automation #communication #generative #parallel #realtime #scheduling #source code
- Automatic Generation of Scheduling and Communication Code in Real-Time Parallel Programs (AB, JS, EP), pp. 134–145.
- LCT-RTS-1995-LeeLK #hybrid #scheduling
- Scheduling of Hard Aperiodic Tasks in Hybrid Static/Dynamic Priority Systems (JL, SL, HK), pp. 7–19.
- PPoPP-1995-WallachHJKW #communication #scheduling
- Optimistic Active Messages: A Mechanism for Scheduling Communication with Computation (DAW, WCH, KLJ, MFK, WEW), pp. 217–226.
- SOSP-1995-FongS #approach #resource management #scheduling
- Time-Function Scheduling: A General Approach To Controllable Resource Management (LLF, MSS), p. 230.
- SOSP-1995-NiehL #multi #named
- SMART: A Processor Scheduler for Multimedia Applications (JN, MSL), p. 233.
- CAV-1995-FidgeKU #realtime #verification
- Interactively Verifying a Simple Real-time Scheduler (CJF, PK, MU), pp. 395–408.
- ILPS-1995-BandaMS #analysis #logic programming #performance #scheduling #source code
- Efficient Analysis of Logic Programs with Dynamic Scheduling (MJGdlB, KM, PJS), pp. 417–431.
- DAC-1994-BhattacharyaDB94a #analysis #optimisation #performance #specification
- Performance Analysis and Optimization of Schedules for Conditional and Loop-Intensive Specifications (SB, SD, FB), pp. 491–496.
- DAC-1994-ChouB #realtime #scheduling
- Software Scheduling in the Co-Synthesis of Reactive Real-Time Systems (PHC, GB), pp. 1–4.
- DAC-1994-FannRJ #scheduling #synthesis
- Global Scheduling for High-Level Synthesis Applications (YF, MR, RJ), pp. 542–546.
- DAC-1994-PassosSB #multi #pipes and filters #scheduling
- Loop Pipelining for Scheduling Multi-Dimensional Systems via Rotation (NLP, EHMS, SCB), pp. 485–490.
- DAC-1994-RadivojevicB #execution #scheduling
- Incorporating Speculative Execution in Exact Control-Dependent Scheduling (IPR, FB), pp. 479–484.
- EDAC-1994-DalkilicP #bound #scheduling #using
- Optimal Operation Scheduling Using Resource Lower Bound Estimations (MED, VP), pp. 319–324.
- EDAC-1994-DepuydtGGM #graph #optimisation #pipes and filters #scheduling
- Optimal Scheduling and Software Pipelining of Repetitive Signal Flow Graphs with Delay Line Optimization (FD, WG, GG, HDM), pp. 490–494.
- EDAC-1994-HarrisO #concurrent #fine-grained #scheduling
- Fine-Grained Concurrency in Test Scheduling for Partial-Intrusion BIST (IGH, AO), pp. 119–123.
- EDAC-1994-RouzeyreDS #component #scheduling #synthesis
- Component Selection, Scheduling and Control Schemes for High Level Synthesis (BR, DD, GS), pp. 482–489.
- EDAC-1994-YangMD #automaton #constraints #scheduling
- Scheduling with Environmental Constraints based on Automata Representations (JCYY, GDM, MD), pp. 495–501.
- SAS-1994-HarcourtMC #scheduling #specification
- From Processor Timing Specifications to Static Intruction Scheduling (EAH, JM, TAC), pp. 116–130.
- STOC-1994-KalyanasundaramP #fault tolerance #scheduling
- Fault-tolerant scheduling (BK, KP), pp. 115–124.
- CSCW-1994-EphratiZR
- Meet your Destiny: A Non-Manipulable Meeting Scheduler (EE, GZ, JSR), pp. 359–371.
- AdaEurope-1994-BjornfotLWA #network
- Distribution of Tasks within a Centrally Scheduled Local Area Network (LB, KL, GW, LA), pp. 421–432.
- PLILP-1994-BreitingerL #scheduling
- Improving Search for Job-Shop Scheduling with CLP(FD) (SB, HCRL), pp. 277–291.
- POPL-1994-MarriottBH #logic programming #scheduling #source code
- Analyzing Logic Programs with Dynamic Scheduling (KM, MJGdlB, MVH), pp. 240–253.
- SAC-1994-CorcoranW #algorithm #parallel #problem #scheduling #search-based
- A parallel island model genetic algorithm for the multiprocessor scheduling problem (ALC, RLW), pp. 483–487.
- SAC-1994-Wang #generative #migration #multi #scheduling
- Generating a deterministic task migration path for multiprocessor scheduling (MfW), pp. 478–482.
- ASPLOS-1994-ChandraDVGR #migration #multi #scheduling
- Scheduling and Page Migration for Multiprocessor Compute Servers (RC, SD, BV, AG, MR), pp. 12–24.
- CC-1994-MahadevanR #framework #scheduling
- Instruction Schedulimg over Regions: A Framework for Scheduling Across Basic Blocks (UM, SR), pp. 419–434.
- HPDC-1994-BlumofeP #network #parallel #scalability #scheduling
- Scheduling Large-Scale Parallel Computations on Networks of Workstations (RDB, DSP), pp. 96–105.
- HPDC-1994-RammeK #scheduling
- Scheduling a Metacomputer by an Implicit Voting System (FR, KK), pp. 106–113.
- ICLP-1994-CaseauL #scheduling
- Improved CLP Scheduling with Task Intervals (YC, FL), pp. 369–383.
- ILPS-1994-Dutra #logic programming #parallel #scheduling
- Strategies for Scheduling And- and Or-Parallel Work in Parallel Logic Programming Systems (IdCD), pp. 289–304.
- ILPS-1994-JourdanFRD #concurrent #constraints #modelling #parallel #programming #scheduling #using
- Data Alignment and Task Scheduling On Parallel Machines Using Concurrent Constraint Model-based Programming (JJ, FF, DR, AD), p. 678.
- DAC-1993-ChaoLS #algorithm #pipes and filters #scheduling
- Rotation Scheduling: A Loop Pipelining Algorithm (LFC, ASL, EHMS), pp. 566–572.
- DAC-1993-HuangJHHW #algorithm #scheduling
- A Tree-Based Scheduling Algorithm for Control-Dominated Circuits (SHH, YLJ, CTH, YCH, JFW), pp. 578–582.
- DAC-1993-SharmaJ #named #scheduling
- InSyn: Integrated Scheduling for DSP Applications (AS, RJ), pp. 349–354.
- KBSE-1993-SmithP #approach #scheduling
- Transformational Approach to Transportation Scheduling (DS, EAP), p. 12.
- KBSE-1993-SrinivasanS #framework #knowledge base
- A Knowledge Based Framework for Developing and Customizing Schedulers (VS, LS), p. 13.
- SIGMOD-1993-HongJC #approach #realtime #scheduling #transaction
- Real-Time Transaction Scheduling: A Cost Conscious Approach (DH, TJ, SC), pp. 197–206.
- SIGMOD-1993-WoelkACMSST #dependence #scheduling #using
- Task Scheduling Using Intertask Dependencies in Carot (DW, PCA, PC, GM, APS, MPS, CT), pp. 491–494.
- VLDB-1993-Schreier #database #knowledge-based #perspective #requirements #scheduling
- Database Requirements of Knowledge-based Production Scheduling and Control: A CIM Perspective (US), pp. 710–711.
- PLDI-1993-Adl-TabatabaiG #detection #scheduling
- Detection and Recovery of Endangered Variables Caused by Instruction Scheduling (ARAT, TRG), pp. 13–25.
- PLDI-1993-HongG #compilation #realtime #source code
- Compiling Real-Time Programs into Schedulable Code (SH, RG), pp. 166–176.
- PLDI-1993-Huff #scheduling
- Lifetime-Sensitive Modulo Scheduling (RAH), pp. 258–267.
- PLDI-1993-KernsE #latency #memory management #nondeterminism #scheduling
- Balanced Scheduling: Instruction Scheduling When Memory Latency is Uncertain (DRK, SJE), pp. 278–289.
- PLDI-1993-Pinter #approach #scheduling
- Register Allocation with Instruction Scheduling: A New Approach (SSP), pp. 248–257.
- STOC-1993-AspnesAFPW #online #scheduling
- On-line load balancing with applications to machine scheduling and virtual circuit routing (JA, YA, AF, SAP, OW), pp. 623–631.
- STOC-1993-BlumofeL #parallel #scheduling #thread
- Space-efficient scheduling of multithreaded computations (RDB, CEL), pp. 362–371.
- STOC-1993-FeldmannKST #dependence #online #parallel #scheduling
- Optimal online scheduling of parallel jobs with dependencies (AF, MYK, JS, SHT), pp. 642–651.
- Best-of-PLDI-1993-KernsE93a #latency #memory management #nondeterminism #scheduling
- Balanced scheduling: instruction scheduling when memory latency is uncertain (with retrospective) (DRK, SJE), pp. 515–527.
- HCI-ACS-1993-Nakamura #distributed
- Cooperation of Distributed Human Scheduler in Cellular Manufacturing Systems (NN), pp. 14–19.
- HCI-SHI-1993-OgawaSTS #knowledge-based #scheduling
- Experimental Method for Construction of a Knowledge-Based System for Shipping Berth Scheduling (MO, NS, TT, SS), pp. 315–320.
- HCI-SHI-1993-SaitoTF
- A Computer-Assisted Instruction System for Beginner’s Crude Charge Schedulers (KS, TT, KF), pp. 831–836.
- AdaEurope-1993-BurnsWH #ada #modelling #performance #runtime #scheduling
- The Impact of an Ada Run-Time System’s Performance Characteristics on Scheduling Models (AB, AJW, ADH), pp. 240–248.
- CIKM-1993-HelalKEM #adaptation #scheduling #transaction
- Adaptive Transaction Scheduling (AH, THK, RE, SM), pp. 704–713.
- ICML-1993-GratchCD #learning #network #scheduling
- Learning Search Control Knowledge for Deep Space Network Scheduling (JG, SAC, GD), pp. 135–142.
- HPDC-1993-MullinTDS #communication #formal method #protocol #scheduling
- Formal Method for Scheduling, Routing and Communication Protocol (LMRM, ST, DRD, EAS), pp. 234–242.
- PPoPP-1993-KontothanassisW #performance #using
- Using Scheduler Information to Achieve Optimal Barrier Synchronization Performance (LIK, RWW), pp. 64–72.
- ICLP-1993-BeaumontW #prolog #scheduling
- Scheduling Speculative Work in Or-Parallel Prolog Systems (TB, DHDW), pp. 135–149.
- ICLP-1993-Gusikhin #integration #prolog #scheduling
- Integration of Traditional Scheduling Techniques and AI on Prolog Basis (OYG), p. 841.
- ILPS-1993-Sindaha #scheduling
- Branch-Level Scheduling in Aurora: The Dharma Scheduler (RYS), pp. 403–419.
- DAC-1992-Gebotys #embedded #scheduling
- Optimal Scheduling and Allocation of Embedded VLSI Chips (CHG), pp. 116–119.
- DAC-1992-NouraniP #automation #scheduling #synthesis
- Move Frame Scheduling and Mixed Scheduling-Allocation for the Automated Synthesis of Digital Systems (MN, CAP), pp. 99–105.
- DAC-1992-Szymanski
- Computing Optimal Clock Schedules (TGS), pp. 399–404.
- DAC-1992-WakabayashiT #dependence #independence #scheduling
- Global Scheduling Independent of Control Dependencies Based on Condition Vectors (KW, HT), pp. 112–115.
- PLDI-1992-Lucco #parallel #scheduling #source code
- A Dynamic Scheduling Technique for Irregular Parallel Programs (SL), pp. 200–211.
- STOC-1992-AwerbuchKP #distributed #scheduling
- Competitive Distributed Job Scheduling (Extended Abstract) (BA, SK, DP), pp. 571–580.
- STOC-1992-BartalFKV #algorithm #problem #scheduling
- New Algorithms for an Ancient Scheduling Problem (YB, AF, HJK, RV), pp. 51–58.
- AdaEurope-1992-Hummel #ada #parallel
- A Highly Parallel Ada Task Scheduler (SFH), pp. 275–286.
- KR-1992-Gibert #declarative #information management #representation #scheduling
- Declarative Knowledge Representation in Planning and Scheduling (JG), pp. 3–13.
- KR-1992-XiongSS #backtracking #scheduling
- Intelligent Backtracking Techniques for Job Shop Scheduling (YX, NMS, KPS), pp. 14–23.
- TOOLS-EUROPE-1992-StevensB #case study #experience #object-oriented #scheduling
- Developing Re-Usable Software for Scheduling Applications: a Report of Experiences with OO Technology (AS, FB), pp. 149–156.
- ASPLOS-1992-AndersonOST #network #scheduling
- High Speed Switch Scheduling for Local Area Networks (TEA, SSO, JBS, CPT), pp. 98–110.
- ASPLOS-1992-MahlkeCHRS #scheduling
- Sentinel Scheduling for VLIW and Superscalar Processors (SAM, WYC, WmWH, BRR, MSS), pp. 238–247.
- CC-1992-ErtlK #pipes and filters #scheduling
- Instruction Scheduling for Complex Pipelines (MAE, AK), pp. 207–218.
- CC-1992-Griesemer #scheduling
- Scheduling Instructions by Direct Placement (RG), pp. 229–235.
- HPDC-1992-BakerHW #distributed #scheduling #simulation
- A Distributed Scheduling Simulation (DB, RFH, KGW), pp. 270–279.
- JICSLP-1992-KingS #analysis #concurrent #logic programming #source code
- Schedule Analysis of Concurrent Logic programs (AK, PS), pp. 478–492.
- DAC-1991-Chen #clustering #concurrent #graph #scheduling
- Graph Partitioning for Concurrent Test Scheduling in VLSI Circuit (CIHC), pp. 287–290.
- DAC-1991-ChenM #pipes and filters #scheduling
- Datapath Scheduling for Two-Level Pipelining (CYRC, MZM), pp. 603–606.
- DAC-1991-GebotysE #architecture #scheduling #synthesis
- Simultaneous Scheduling and Allocation for Cost Constrained Optimal Architectural Synthesis (CHG, MIE), pp. 2–7.
- DAC-1991-HwangHL #functional #pipes and filters #scheduling
- Scheduling for Functional Pipelining and Loop Winding (CTH, YCH, YLL), pp. 764–769.
- DAC-1991-JainMSW #empirical #evaluation #heuristic #scheduling #synthesis
- Empirical Evaluation of Some High-Level Synthesis Scheduling Heuristics (RJ, AM, AS, HW), pp. 686–689.
- DAC-1991-LoboP #optimisation #scheduling
- Redundant Operator Creation: A Scheduling Optimization Technique (DAL, BMP), pp. 775–778.
- DAC-1991-LyM #bottom-up #fuzzy #synthesis
- Bottom Up Synthesis Based on Fuzzy Schedules (TAL, JTM), pp. 674–679.
- DAC-1991-ParkK #automation #performance #scheduling
- Fast and Near Optimal Scheduling in Automatic Data Path Aynthesis (ICP, CMK), pp. 680–685.
- DAC-1991-WengP #3d #scheduling #synthesis
- 3D Scheduling: High-Level Synthesis with Floorplanning (JPW, ACP), pp. 668–673.
- PLDI-1991-BernsteinR #scheduling
- Global Instruction Scheduling for Superscalar Machines (DB, MR), pp. 241–255.
- PLDI-1991-BradleeHE #scheduling
- The Marion System for Retargetable Instruction Scheduling (DGB, RRH, SJE), pp. 229–240.
- PLDI-1991-GaoWN #petri net #scheduling
- A Timed Petri-Net Model for Fine-Grain Loop Scheduling (GRG, YBW, QN), pp. 204–218.
- PLDI-1991-Jain #pipes and filters #scheduling
- Circular Scheduling: A New Technique to Perform Software Pipelining (SJ), pp. 219–228.
- PLDI-1991-ProebstingF #architecture #linear #scheduling
- Linear-Time, Optimal Code Scheduling for Delayed-Load Architectures (TAP, CNF), pp. 256–267.
- STOC-1991-CoffmanG #proving #scheduling
- Proof of the 4/3 Conjecture for Preemptive vs. Nonpreemptive Two-Processor Scheduling (EGCJ, MRG), pp. 241–248.
- ICALP-1991-JungSS #algorithm #constraints #parallel #precedence #scheduling
- A Parallel Algorithm for Two Processors Precedence Constraint Scheduling (HJ, MJS, PGS), pp. 417–428.
- ICALP-1991-RaviAK #approximate #graph #problem #scheduling
- Ordering Problems Approximated: Single-Processor Scheduling and Interval Graph Completion (RR, AA, PNK), pp. 751–762.
- CHI-1991-PlaisantS #scheduling
- Scheduling on-off home control devices (CP, BS), pp. 459–460.
- AdaEurope-1991-Maymir-Ducharme #ada #realtime #scheduling
- Ada 9X Real-Time Scheduling Alternatives (FAMD), pp. 37–48.
- PLILP-1991-ErtlK #constraints #logic programming #scheduling #using
- Optimal Instruction Scheduling using Constraint Logic Programming (MAE, AK), pp. 75–86.
- ASPLOS-1991-BradleeEH #scheduling
- Integrating Register Allocation and Instruction Scheduling for RISCs (DGB, SJE, RRH), pp. 122–131.
- ASPLOS-1991-Mangione-SmithAD #design #scheduling
- Vector Register Design for Polycyclic Vector Scheduling (WHMS, SGA, ESD), pp. 154–163.
- PPoPP-1991-NicolauW #bound #parallel
- Optimal Schedules for Parallel Prefix Computation with Bounded Resources (AN, HW), pp. 1–10.
- SOSP-1991-AndersonBLL #effectiveness #kernel #parallel
- Scheduler Activations: Effective Kernel Support for the User-Level Management of Parallelism (TEA, BNB, EDL, HML), pp. 95–109.
- SOSP-1991-GovindanA #scheduling
- Scheduling and IPC Mechanisms for Continuous Media (RG, DPA), pp. 68–80.
- SOSP-1991-VaswaniZ #memory management #multi #scheduling
- The Implications of Cache Affinity on Processor Scheduling for Multiprogrammed, Shared Memory Multiprocessors (RV, JZ), pp. 26–40.
- ICLP-1991-AliK #scheduling
- Scheduling Or-Parallelism in Muse (KAMA, RK), pp. 807–821.
- DAC-1990-CloutierT #algorithm #scheduling
- The Combination of Scheduling, Allocation, and Mapping in a Single Algorithm (RJC, DET), pp. 71–76.
- DAC-1990-CompasanoB #algorithm #scheduling #synthesis #using
- Synthesis Using Path-Based scheduling: algorithms and Exercises (RC, RAB), pp. 450–455.
- DAC-1990-GrantD #algorithm #memory management #synthesis
- Memory, Control and Communications Synthesis for Scheduled Algorithms (DMG, PBD), pp. 162–167.
- DAC-1990-HwangHL #constraints #heuristic #scheduling
- Optimum and Heuristic Data Path Scheduling Under Resource Constraints (CTH, YCH, YLL), pp. 65–70.
- DAC-1990-KuM #constraints #scheduling
- Relative Scheduling Under Timing Constraints (DCK, GDM), pp. 59–64.
- DAC-1990-PapachristouK #algorithm #linear #optimisation #scheduling
- A Linear Program Driven Scheduling and Allocation Method Followed by an Interconnect Optimization Algorithm (CAP, HK), pp. 77–83.
- CSCW-1990-BeardPHBNS #scheduling #visual notation
- A Visual Calendar for Scheduling Group Meetings (DB, MP, AH, DB, AN, YPS), pp. 279–290.
- POPL-1990-PalemS #scheduling
- Scheduling Time-Critical Instructions on RISC Machines (KVP, BBS), pp. 270–280.
- CC-1990-KrohaF #compilation #multi #scheduling
- A Compiler with Scheduling for a Specialized Synchronous Multiprocessor System (PK, PF), pp. 132–146.
- CAV-1990-Wong-ToiD #process #specification
- Synthesizing Processes and Schedulers from Temporal Specifications (HWT, DLD), pp. 272–281.
- NACLP-1990-Crammond #implementation #parallel #scheduling
- Scheduling and Variable Assignment in the Parallel PARLOG Implementation (JAC), pp. 642–657.
- DAC-1989-BalakrishnanM #approach #design #scheduling #synthesis
- Integrated Scheduling and Binding: A Synthesis Approach for Design Space Exploration (MB, PM), pp. 68–74.
- DAC-1989-GoossensVM #optimisation #scheduling
- Loop Optimization in Register-Transfer Scheduling for DSP-Systems (GG, JV, HDM), pp. 826–831.
- DAC-1989-NgV #framework #multi #scheduling #simulation
- A Framework for Scheduling Multi-Rate Circuit Simulation (APCN, VV), pp. 19–24.
- DAC-1989-PaulinK #algorithm #scheduling #synthesis
- Scheduling and Binding Algorithms for High-Level Synthesis (PGP, JPK), pp. 1–6.
- DAC-1989-PotkonjackR #algorithm #graph #resource management #scheduling
- A Scheduling and Resource Allocation Algorithm for Hierarchical Signal Flow Graphs (MP, JMR), pp. 7–12.
- DAC-1989-WangM #functional #scheduling #simulation
- Scheduling High-Level Blocks for Functional Simulation (ZW, PMM), pp. 87–90.
- VLDB-1989-AbbottG #realtime #scheduling #transaction
- Scheduling Real-Time Transactions with Disk Resident Data (RKA, HGM), pp. 385–396.
- VLDB-1989-CareyJL #scheduling
- Priority in DBMS Resource Scheduling (MJC, RJ, ML), pp. 397–410.
- ML-1989-HilliardLRP #approach #classification #hybrid #learning #problem #scheduling
- Learning Decision Rules for scheduling Problems: A Classifier Hybrid Approach (MRH, GEL, GR, MRP), pp. 188–190.
- SOSP-1989-TuckerG #multi #process #scheduling
- Process Control and Scheduling Issues for Multiprogrammed Shared-Memory Multiprocessors (AT, AG), pp. 159–166.
- TAV-1989-ChoiMP #execution #named #scheduling
- PMothra: Scheduling Mutants for Execution on a Hypercube (BC, AM, BP), pp. 58–65.
- DAC-1988-LamD #performance
- Performance of a New Annealing Schedule (JL, JMD), pp. 306–311.
- VLDB-1988-AbbottG #evaluation #performance #realtime #scheduling #transaction
- Scheduling Real-time Transactions: a Performance Evaluation (RKA, HGM), pp. 1–12.
- PLDI-1988-Lam #effectiveness #pipes and filters #scheduling
- Software Pipelining: An Effective Scheduling Technique for VLIW Machines (MSL), pp. 318–328.
- Best-of-PLDI-1988-Lam88a #effectiveness #pipes and filters #scheduling
- Software pipelining: an effective scheduling technique for VLIW machines (with retrospective) (MSL), pp. 244–256.
- CSL-1988-Priese #on the
- On the Existence of Fair Schedulers (LP), pp. 272–287.
- JICSCP-1988-ButlerDLOOS88 #perspective #scheduling
- Scheduling OR-Parallelism: An Argonne Perspective (RB, TD, ELL, RO, RAO, RLS), pp. 1590–1605.
- DAC-1987-PaulinK #automation #scheduling #synthesis
- Force-Directed Scheduling in Automatic Data Path Synthesis (PGP, JPK), pp. 195–202.
- HCI-CE-1987-NakamuraS #case study #flexibility #scheduling
- Human Decision Making in Computer-Based Scheduling within a Flexible Manufacturing System: An Experimental Study (NN, GS), pp. 257–264.
- HCI-SES-1987-ZwahlenA #development
- Development of a Work-Rest Schedule for VDT Work (HTZ, CCAJ), pp. 157–164.
- POPL-1987-BernsteinJR #parallel #scheduling
- Scheduling Arithmetic and Load Operations in Parallel with No Spilling (DB, JMJ, MR), pp. 263–273.
- ASPLOS-1987-ColwellNOPR #architecture #compilation #scheduling
- A VLIW Architecture for a Trace Scheduling Compiler (RPC, RPN, JJO, DBP, PKR), pp. 180–192.
- ICLP-1987-Hermenegildo87 #execution #logic programming #memory management #precedence #source code
- Relating Goal-Scheduling, Precedence, and Memory Management in AND-Parallel Execution of Logic Programs (MVH), pp. 556–575.
- Best-of-PLDI-1986-MuchnickG #architecture #performance #pipes and filters #scheduling
- Efficient instruction scheduling for a pipelined architecture (with retrospective) (SSM, PBG), pp. 167–174.
- STOC-1985-VaziraniV #problem #scheduling
- The Two-Processor Scheduling Problem is in R-NC (UVV, VVV), pp. 11–21.
- POPL-1985-BernsteinPR #memory management #parallel #scheduling
- Optimal Scheduling of Arithmetic Operations in Parallel with Memory Accesses (DB, RYP, MR), pp. 325–333.
- PODS-1984-GrahamGS #database #reliability #scheduling #transaction
- Reliable Scheduling of Database Transactions for Unreliable Systems (MHG, NDG, BST), pp. 300–310.
- PODS-1984-RaihaT #formal method #online #towards
- Towards a Theory of Online Schedulers (KJR, HT), pp. 323–332.
- ICALP-1983-HartS #concurrent #how #probability
- Concurrent Probabilistic Program, or: How to Schedule if You Must (SH, MS), pp. 304–318.
- ASPLOS-1982-AhujaA #architecture #communication #hardware #multi #scheduling
- A Multi-Microprocessor Architecture with Hardware Support for Communication and Scheduling (SA, AA), pp. 205–209.
- SIGMOD-1981-GoudaD #database #distributed #query
- Optimal Semijoin Schedules For Query Processing in Local Distributed Database Systems (MGG, UD), pp. 164–175.
- VLDB-1981-MerrettKY #scheduling
- Scheduling of Page-Fetches in Join Operations (THM, YK, HY), pp. 488–498.
- STOC-1980-Lloyd #constraints #scheduling
- Critical Path Scheduling of Task Systems with Resource and Processor Constraints (Extended Abstract) (ELL), pp. 436–446.
- DAC-1979-Sherwood #hybrid #logic #scheduling
- A hybrid scheduling technique for hierarchical logic simulators or “Close Encounters of the Simulated Kind” (WS), pp. 249–254.
- VLDB-1977-GardarinL #algorithm #consistency #database #nondeterminism #scalability #scheduling
- Scheduling Algorithms for Avoiding Inconsistency in Large Databases (GG, PL), pp. 501–506.
- POPL-1975-Cohen #parallel #scheduling #semantics
- A Semantic Model for Parallel Systems with Scheduling (ESC), pp. 87–94.
- SOSP-1975-AgrawalaB #memory management #modelling #scheduling
- Models of Memory Scheduling (AKA, RMB), pp. 217–222.
- SOSP-1975-ChandyR #execution #order #probability #scheduling
- Scheduling Partially Ordered Tasks with Probabilistic Execution Times (KMC, PFR), pp. 169–177.
- SOSP-1975-CoffmanM #scheduling
- Selecting a Scheduling Rule that Meets Pre-Specified Response Time Demands (EGCJ, IM), pp. 187–191.
- SOSP-1975-LamS #algorithm #analysis #scheduling
- Analysis of a Level Algorithm for Preemptive Scheduling (SL, RS), pp. 178–186.
- STOC-1974-VairavanD #parallel #scheduling #source code #strict
- Parallel Scheduling of Programs in a Restricted Model of Computation (KV, RAD), pp. 248–255.
- SOSP-1973-BrunoCS #independence #scheduling
- Scheduling Independent Tasks to Reduce Mean Finishing Time (Extended Abstract) (JLB, EGCJ, RS), pp. 102–103.
- SOSP-1973-Fuller #random #scheduling
- Random Arrival and the MTPT Drum Scheduling Discipline (SHF), pp. 54–57.
- SOSP-1973-GareyG #bound #scheduling
- Bounds on Scheduling with Limited Resources (MRG, RLG), pp. 104–111.
- SOSP-1973-KrauseSS #algorithm #multi #scheduling
- A Task Scheduling Algorithm for a Multiprogramming Computer System (KLK, VYS, HDS), pp. 112–118.
- SOSP-1973-Ullman #polynomial #problem #scheduling
- Polynomial Complete Scheduling Problems (JDU), pp. 96–101.
- DAC-1972-Merwin #development
- Estimating software development schedules and costs (REM), pp. 1–4.
- SOSP-J-1973-TeoreyP72 #analysis #comparative #policy #scheduling
- A Comparative Analysis of Disk Scheduling Policies (TJT, TBP), pp. 177–184.
- SOSP-1971-Baskett #dependence #scheduling
- The Dependence of Computer System Queues upon Processing Time Distribution and Central Processor Scheduling (FB), pp. 109–113.
- SOSP-1971-Hansen #multi #scheduling
- Short Term Scheduling in Multiprogramming Systems (PBH), pp. 101–105.
- SOSP-1971-Rodriguez-Rosell #behaviour #how #parametricity
- Experimental Data on How Program Behavior Affects the Choice of Scheduler Parameters (JRR), pp. 156–163.
- SOSP-1971-TeoreyP #analysis #comparative #policy #scheduling
- A Comparative Analysis of Disk Scheduling Policies (Abstract) (TJT, TBP), pp. 114–121.
- SOSP-1969-Hellerman #principle #scheduling
- Complementary replacement: a meta scheduling principle (HH), pp. 43–46.
- SOSP-1967-Lampson68 #multi #scheduling
- A scheduling philosophy for multiprocessing systems (BWL), pp. 347–360.