Travelled to:
2 × France
Collaborated with:
S.Reichelt O.Scheickl M.Krause O.Bringmann A.Hergenhan W.Rosenstiel
Talks about:
time (2) interconnect (1) constraint (1) influenc (1) softwar (1) autosar (1) system (1) design (1) compon (1) simul (1)
Person: Gökhan Tabanoglu
DBLP: Tabanoglu:G=ouml=khan
Contributed to:
Wrote 2 papers:
- DATE-2009-ReicheltST #constraints #design #realtime
- The influence of real-time constraints on the design of FlexRay-based systems (SR, OS, GT), pp. 858–863.
- DATE-2007-KrauseBHTR #component #simulation
- Timing simulation of interconnected AUTOSAR software-components (MK, OB, AH, GT, WR), pp. 474–479.