Travelled to:
1 × Sweden
1 × Taiwan
1 × USA
Collaborated with:
Z.Wang M.Lyu M.Li Wenliang Chen
Talks about:
product (4) system (3) polici (3) inaccuraci (2) inventori (2) control (2) robust (2) delay (2) time (2) distribut (1)
Person: Felix T. S. Chan
DBLP: Chan:Felix_T=_S=
Contributed to:
Wrote 4 papers:
- CASE-2015-LyuWC #algorithm #heuristic #integer #programming
- Mixed integer programming model and heuristic algorithm for production planning of continuous casting and hot rolling (ML, ZW, FTSC), pp. 1503–1508.
- CASE-2014-LiCW #policy #robust
- A robust (r, Q) policy for a simple VMI system with inventory inaccuracy and time-delay (ML, FTSC, ZW), pp. 652–657.
- CASE-2013-WangC #multi #policy #robust
- A robust production control policy for a multiple-stage production system with inventory inaccuracy and time-delay (ZW, FTSC), pp. 77–82.
- CASE-2017-ChenWC #multi #policy #probability
- Steady state probability distribution of a two-product-type and multi-parallel-machine system under prioritized hedging point control policy (WC, ZW, FTSC), pp. 224–230.