Travelled to:
1 × India
Collaborated with:
S.G.Ponnambalam M.Yogeswaran
Talks about:
manufactur (1) schedul (1) flexibl (1) system (1) object (1) materi (1) machin (1) integr (1) multi (1) handl (1)
Person: Tan Wei Yung
DBLP: Yung:Tan_Wei
Contributed to:
Wrote 1 papers:
- CASE-2009-YungPY #flexibility #multi #scheduling
- Multi-objective ACO for integrated scheduling of machines and material handling equipment in flexible manufacturing systems (TWY, SGP, MY), pp. 304–309.