Jing-jing Wang, Ling Wang
An Iterated Greedy Algorithm for Distributed Hybrid Flowshop Scheduling Problem with Total Tardiness Minimization
CASE, 2019.
@inproceedings{CASE-2019-WangW,
author = "Jing-jing Wang and Ling Wang",
booktitle = "{Proceedings of the 15th International Conference on Automation Science and Engineering}",
doi = "10.1109/COASE.2019.8842885",
isbn = "978-1-7281-0356-3",
pages = "350--355",
publisher = "{IEEE}",
title = "{An Iterated Greedy Algorithm for Distributed Hybrid Flowshop Scheduling Problem with Total Tardiness Minimization}",
year = 2019,
}











