Travelled to:
1 × Portugal
1 × UK
Collaborated with:
I.Makarouni J.E.Psarras G.Kostaras D.Askounis
Talks about:
industri (2) problem (2) real (2) criteria (1) sequenc (1) schedul (1) environ (1) world (1) steel (1) scale (1)
Person: G. Mitrou
DBLP: Mitrou:G=
Contributed to:
Wrote 2 papers:
- ICEIS-2000-KostarasMMP #industrial #multi #problem #scalability
- Solving Large Scale Multi-Criteria Job Sequencing Problems in Real Industrial Environments (GK, IM, GM, JEP), pp. 157–162.
- ICEIS-1999-PsarrasMMA #industrial #optimisation #problem #scheduling
- Optimizing a Real-World Scheduling Problem in the Steel Industry (JEP, GM, IM, DA), p. 767.