Travelled to:
1 × Canada
1 × India
1 × Italy
1 × USA
Collaborated with:
J.Li S.Biller J.Arinez N.Huang P.K.Howard F.Ju G.Xiao
Talks about:
manufactur (3) qualiti (3) flexibl (3) system (3) product (2) monoton (2) batteri (2) analysi (2) batch (2) bottleneck (1)
Person: Junwen Wang
DBLP: Wang:Junwen
Contributed to:
Wrote 5 papers:
- CASE-2011-JuWLBX #framework #simulation
- Virtual battery: A simulation framework for batteries in electric vehicles (FJ, JW, JL, SB, GX), pp. 648–653.
- CASE-2011-WangLH #analysis #modelling
- Modeling and analysis of care delivery services within patient rooms (JW, JL, PKH), pp. 537–542.
- CASE-2010-WangLAB #approach #flexibility #quality
- Improving quality in flexible manufacturing systems: A bottleneck transition approach (JW, JL, JA, SB), pp. 610–616.
- CASE-2009-WangLABH #flexibility #quality
- Monotonic and non-monotonic properties of product quality in flexible manufacturing systems with batch operations (JW, JL, JA, SB, NH), pp. 13–18.
- CASE-2008-WangLABH #analysis #flexibility #quality
- Quality analysis in flexible manufacturing systems with batch productions (JW, JL, JA, SB, NH), pp. 460–465.