Travelled to:
1 × Germany
1 × India
1 × The Netherlands
Collaborated with:
M.Mäntylä T.O.A.Lehtinen C.Lassenius O.Oliinyk M.Schoelzke M.Becker S.Schneickert F.Khomh B.Adams E.Engström
Talks about:
test (2) case (2) industri (1) softwar (1) pressur (1) develop (1) control (1) context (1) review (1) requir (1)
Person: Kai Petersen
DBLP: Petersen:Kai
Contributed to:
Wrote 3 papers:
- REFSQ-2015-OliinykPSBS #case study #evaluation #feature model #industrial #metric #modelling
- Metrics for the Evaluation of Feature Models in an Industrial Context: A Case Study at Opel (OO, KP, MS, MB, SS), pp. 33–48.
- ICSE-2014-MantylaPLL #development #empirical #overview #perspective #requirements #testing
- Time pressure: a controlled experiment of test case development and requirements review (MM, KP, TOAL, CL), pp. 83–94.
- ICSM-2013-MantylaKAEP #agile #on the #testing
- On Rapid Releases and Software Testing (MM, FK, BA, EE, KP), pp. 20–29.