Travelled to:1 × Spain
Collaborated with:∅ M.Chrobak L.Epstein J.Noga J.Sgall R.v.Stee T.Tichý
Talks about:preemptiv (1) parallel (1) overload (1) sequenc (1) schedul (1) system (1) machin (1) readi (1) time (1) tail (1)
Person: Nodari Vakhania
 DBLP: Vakhania:Nodari
Contributed to:
Wrote 2 papers:
- ICALP-2002-ChrobakENSSTV #scheduling
 - Preemptive Scheduling in Overloaded Systems (MC, LE, JN, JS, RvS, TT, NV), pp. 800–811.
 - SAC-1997-Vakhania #parallel
 - Sequencing jobs with readiness times and tails on parallel machines (NV), pp. 438–446.
 













