Travelled to:
1 × Taiwan
Collaborated with:
L.Li Zhihong Min L.Li Haodan She Nan Xiang
Talks about:
schedul (2) semiconductor (1) manufactur (1) strategi (1) research (1) parallel (1) collabor (1) product (1) process (1) entrant (1)
Person: Qingyun Yu
DBLP: Yu:Qingyun
Contributed to:
Wrote 3 papers:
- CASE-2014-LiY #scheduling
- ACO-ICSA based scheduling of re-entrant manufacturing system with Mix-processing Style (LL, QY), pp. 87–92.
- CASE-2017-SheYML #collaboration #scheduling
- A collaborative scheduling strategy for twin fab (HS, QY, ZM, LL), pp. 723–728.
- CASE-2017-XiangYML #parallel #policy #research
- Research on release control policies of parallel semiconductor production lines (NX, QY, ZM, LL), pp. 296–301.