Collaborated with:
N.Tonellotto R.Baraglia R.Ferrini L.Ricci
Talks about:
constrain (1) parallel (1) schedul (1) heurist (1) applic (1) list (1) grid (1)
Person: Ramin Yahyapour
DBLP: Yahyapour:Ramin
Contributed to:
Wrote 1 papers:
- PDP-2008-TonellottoBFRY #heuristic #parallel #scheduling
- QoS-constrained List Scheduling Heuristics for Parallel Applications on Grids (NT, RB, RF, LR, RY), pp. 379–383.