Travelled to:
1 × Canada
1 × Korea
1 × USA
Collaborated with:
L.Mönch C.Habla U.Hönig W.Schiffmann T.Ponsignon H.Ehm
Talks about:
semiconductor (2) manufactur (2) schedul (2) heurist (2) complex (2) shop (2) exploratori (1) architectur (1) decomposit (1) bottleneck (1)
Person: Rene Driessel
DBLP: Driessel:Rene
Contributed to:
Wrote 4 papers:
- CASE-2012-DriesselM #case study #composition #heuristic #scheduling
- An exploratory study of a decomposition heuristic for complex shop scheduling with transportation (RD, LM), pp. 413–418.
- CASE-2010-DriesselHMS #architecture #assessment #heuristic #parallel #performance #scheduling
- A parallel shifting bottleneck heuristic for scheduling complex job shops: Architecture and performance assessment (RD, UH, LM, WS), pp. 81–86.
- CASE-2007-HablaDMPE
- A Short-Term Forecast Method for Demand Quantities in Semiconductor Manufacturing (CH, RD, LM, TP, HE), pp. 94–99.
- CASE-2007-HablaMD #approach #capacity #finite
- A Finite Capacity Production Planning Approach for Semiconductor Manufacturing (CH, LM, RD), pp. 82–87.