Collaborated with:
Manuel Fechter T.Dietz Bernd Waschneck Thomas Altenmüller A.Kyek
Talks about:
semiconductor (1) reconfigur (1) manufactur (1) complianc (1) schedul (1) assembl (1) system (1) hybrid (1) calcul (1) studi (1)
Person: Thomas Bauernhansl
DBLP: Bauernhansl:Thomas
Contributed to:
Wrote 2 papers:
- CASE-2018-WaschneckABK #case study #scheduling
- Case Study on Operator Compliance to Scheduling Decisions in Semiconductor Manufacturing (BW, TA, TB, AK), pp. 649–652.
- CASE-2019-FechterDB #assembly #configuration management #hybrid
- Cost calculation model for reconfigurable, hybrid assembly systems (MF, TD, TB), pp. 836–841.