Collaborated with:
N.Koziris I.Drositis G.Manis G.K.Papakonstantinou
Talks about:
schedul (2) uet (2) uct (2) processor (1) uniform (1) geometr (1) number (1) depend (1) optim (1) loop (1)
Person: Theodore Andronikos
DBLP: Andronikos:Theodore
Contributed to:
Wrote 2 papers:
- PDP-2002-DrositisAMPK #2d #dependence #geometry #scheduling
- Geometric Scheduling of 2-D UET-UCT Uniform Dependence Loops (ID, TA, GM, GKP, NK), p. 343–?.
- PDP-2000-AndronikosK #scheduling
- Optimal scheduling for UET-UCT grids into fixed number of processors (TA, NK), pp. 237–243.