Travelled to:1 × Sweden
Collaborated with:A.J.Benavides M.Ritt C.Miralles
Talks about:schedul (1) worker (1) includ (1) disabl (1) shop (1) flow (1)
Person: Germano C. Carniel
DBLP: Carniel:Germano_C=
Contributed to:
Wrote 1 papers:
- CASE-2015-CarnielBRM #scheduling
- Including workers with disabilities in flow shop scheduling (GCC, AJB, MR, CM), pp. 985–991.












