Travelled to:
1 × Sweden
Collaborated with:
∅ G.C.Carniel A.J.Benavides C.Miralles
Talks about:
schedul (2) shop (2) flow (2) algorithm (1) problem (1) worker (1) search (1) permut (1) includ (1) disabl (1)
Person: Marcus Ritt
DBLP: Ritt:Marcus
Contributed to:
Wrote 2 papers:
- CASE-2015-CarnielBRM #scheduling
- Including workers with disabilities in flow shop scheduling (GCC, AJB, MR, CM), pp. 985–991.
- CASE-2016-Ritt #algorithm #bound #permutation #problem #scheduling
- A branch-and-bound algorithm with cyclic best-first search for the permutation flow shop scheduling problem (MR), pp. 872–877.