Travelled to:
1 × Italy
1 × USA
Collaborated with:
T.Lee J.Lee D.Kim Jun Kim Sang-Soo Park
Talks about:
schedul (4) cluster (2) machin (2) tool (2) constraint (1) transient (1) parallel (1) uniform (1) resourc (1) product (1)
Person: Hyun-Jung Kim
DBLP: Kim:Hyun=Jung
Contributed to:
Wrote 4 papers:
- CASE-2013-KimLK #clustering #scheduling #tool support
- Optimal scheduling of transient cycles for single-armed cluster tools (DKK, TEL, HJK), pp. 874–879.
- CASE-2011-KimL #clustering #constraints #scheduling #tool support
- Scheduling of cluster tools with ready time constraints for small lot production (HJK, TEL), pp. 96–101.
- CASE-2017-KimPK #3d #multi #scheduling
- Scheduling 3D printers with multiple printing alternatives (JK, SSP, HJK), pp. 488–493.
- CASE-2018-KimL #parallel #scheduling
- Uniform Parallel Machine Scheduling with Dedicated Machines, Job Splitting and Setup Resources (HJK, JHL), pp. 661–663.