Travelled to:
1 × China
1 × USA
Collaborated with:
S.Ding J.G.Shanthikumar J.Yi M.T.Zhang
Talks about:
heterogen (2) workstat (2) stochast (2) serial (2) machin (2) model (2) batch (2) uncertainti (1) schedul (1) process (1)
Person: Raha Akhavan-Tabatabaei
DBLP: Akhavan-Tabatabaei:Raha
Contributed to:
Wrote 3 papers:
- CASE-2007-DingAS #modelling #probability
- Stochastic Modeling for Serial-Batching Workstations with Heterogeneous Machines (SD, RAT, JGS), pp. 77–81.
- CASE-2007-DingSA #modelling #probability
- Stochastic Modeling for Serial-Batching Workstations with Heterogeneous Machines (SD, JGS, RAT), p. 91–?.
- CASE-2006-DingYZA #clustering #evaluation #multi #nondeterminism #optimisation #performance #process #tool support
- Performance Evaluation and Schedule Optimization of Multi-Cluster Tools with Process Times Uncertainty (SD, JY, MTZ, RAT), pp. 112–117.