Xiao Jing, Zheng Li
A MILP-based batch scheduling for two-stage hybrid flowshop with sequence-dependent setups in semiconductor assembly and test manufacturing
CASE, 2010.
@inproceedings{CASE-2010-JingL, author = "Xiao Jing and Zheng Li", booktitle = "{Proceedings of the Sixth International Conference on Automation Science and Engineering}", doi = "10.1109/COASE.2010.5584514", isbn = "978-1-4244-5447-1", pages = "87--92", publisher = "{IEEE}", title = "{A MILP-based batch scheduling for two-stage hybrid flowshop with sequence-dependent setups in semiconductor assembly and test manufacturing}", year = 2010, }