BibSLEIGH
BibSLEIGH corpus
BibSLEIGH tags
BibSLEIGH bundles
BibSLEIGH people
CC-BY
Open Knowledge
XHTML 1.0 W3C Rec
CSS 2.1 W3C CanRec
email twitter
Used together with:
schedul (5)
problem (3)
total (2)
makespan (1)
setup (1)

Stem flowshop$ (all stems)

5 papers:

DATEDATE-2015-WaqasGKSBSVC #heuristic #online #scalability #scheduling
A re-entrant flowshop heuristic for online scheduling of the paper path in a large scale printer (UW, MG, JK, LJS, TB, SS, PV, HC), pp. 573–578.
ICALPICALP-v1-2013-MuchaS #problem #scheduling #symmetry
No-Wait Flowshop Scheduling Is as Hard as Asymmetric Traveling Salesman Problem (MM, MS), pp. 769–779.
CASECASE-2010-JingL #assembly #hybrid #scheduling
A MILP-based batch scheduling for two-stage hybrid flowshop with sequence-dependent setups in semiconductor assembly and test manufacturing (XJ, ZL), pp. 87–92.
CASECASE-2007-NishiHI #problem #scheduling
A Successive Lagrangian Relaxation Method for Solving Flowshop Scheduling Problems with Total Weighted Tardiness (TN, YH, MI), pp. 875–880.
CASECASE-2006-ChandrasekaranSPV #algorithm #optimisation #permutation #problem #scheduling
An Application of Particle Swarm Optimization Algorithm to Permutation Flowshop Scheduling Problems to Minimize Makespan, Total Flowtime and Completion Time Variance (SC, RKS, SGP, NV), pp. 513–518.

Bibliography of Software Language Engineering in Generated Hypertext (BibSLEIGH) is created and maintained by Dr. Vadim Zaytsev.
Hosted as a part of SLEBOK on GitHub.