Zhengcai Cao, Yazhen Peng, Yongji Wang
A drum-buffer-rope based scheduling method for semiconductor manufacturing system
CASE, 2011.
@inproceedings{CASE-2011-CaoPW, author = "Zhengcai Cao and Yazhen Peng and Yongji Wang", booktitle = "{Proceedings of the Seventh International Conference on Automation Science and Engineering}", doi = "10.1109/CASE.2011.6042397", isbn = "978-1-4577-1730-7", pages = "120--125", publisher = "{IEEE}", title = "{A drum-buffer-rope based scheduling method for semiconductor manufacturing system}", year = 2011, }