Travelled to:
1 × Italy
Collaborated with:
Z.Cao Y.Wang
Talks about:
semiconductor (1) manufactur (1) schedul (1) system (1) method (1) buffer (1) rope (1) drum (1) base (1)
Person: Yazhen Peng
DBLP: Peng:Yazhen
Contributed to:
Wrote 1 papers:
- CASE-2011-CaoPW #scheduling
- A drum-buffer-rope based scheduling method for semiconductor manufacturing system (ZC, YP, YW), pp. 120–125.