Travelled to:
1 × China
1 × Italy
1 × Switzerland
1 × USA
Collaborated with:
Q.Wang Z.Cao Y.Peng H.Wu X.Cheng L.Xie J.Xiao Y.Yang N.Jiang L.Gou X.Liu M.Li
Talks about:
base (3) schedul (2) method (2) semiconductor (1) probabilist (1) manufactur (1) recommend (1) preemptiv (1) increment (1) establish (1)
Person: Yongji Wang
DBLP: Wang:Yongji
Contributed to:
Wrote 4 papers:
- CASE-2011-CaoPW #scheduling
- A drum-buffer-rope based scheduling method for semiconductor manufacturing system (ZC, YP, YW), pp. 120–125.
- SEKE-2009-XieWXWY #named #scheduling
- PP-HAS: A Task Priority Based Preemptive Human Resource Scheduling Method (LX, QW, JX, YW, YY), pp. 655–660.
- RecSys-2008-WuWC #analysis #automation #incremental #probability #recommendation #semantics
- Incremental probabilistic latent semantic analysis for automatic question recommendation (HW, YW, XC), pp. 99–106.
- ICSE-2006-WangJGLLW #approach #named #performance #process #statistics
- BSR: a statistic-based approach for establishing and refining software process performance baseline (QW, NJ, LG, XL, ML, YW), pp. 585–594.