Travelled to:
2 × USA
Collaborated with:
Y.Hsu Y.Lin
Talks about:
schedul (2) constraint (1) function (1) resourc (1) pipelin (1) optimum (1) heurist (1) under (1) wind (1) path (1)
Person: Cheng-Tsung Hwang
DBLP: Hwang:Cheng=Tsung
Contributed to:
Wrote 2 papers:
- DAC-1991-HwangHL #functional #pipes and filters #scheduling
- Scheduling for Functional Pipelining and Loop Winding (CTH, YCH, YLL), pp. 764–769.
- DAC-1990-HwangHL #constraints #heuristic #scheduling
- Optimum and Heuristic Data Path Scheduling Under Resource Constraints (CTH, YCH, YLL), pp. 65–70.