Travelled to:
1 × Mexico
2 × USA
Collaborated with:
S.A.Mahlke E.S.Davidson H.S.Lee C.J.Newburn G.S.Tyson
Talks about:
schedul (2) predic (2) stack (2) awar (2) microarchitectur (1) probabilist (1) constraint (1) techniqu (1) resourc (1) modulo (1)
Person: Mikhail Smelyanskiy
DBLP: Smelyanskiy:Mikhail
Contributed to:
Wrote 3 papers:
- CGO-2004-SmelyanskiyMD #probability #scheduling
- Probabilistic Predicate-Aware Modulo Scheduling (MS, SAM, ESD), pp. 151–162.
- CGO-2003-SmelyanskiyMDL #constraints #scheduling
- Predicate-Aware Scheduling: A Technique for Reducing Resource Constraints (MS, SAM, ESD, HHSL), pp. 169–178.
- HPCA-2001-LeeSNT #architecture #stack
- Stack Value File: Custom Microarchitecture for the Stack (HHSL, MS, CJN, GST), pp. 5–14.