Travelled to:
1 × China
1 × India
1 × USA
Collaborated with:
F.Qiao L.Li Z.Wang Q.Kang H.Xiao L.Wang
Talks about:
schedul (3) semiconductor (2) parallel (1) product (1) process (1) multipl (1) assembl (1) weight (1) object (1) method (1)
Person: Qidi Wu
DBLP: Wu:Qidi
Contributed to:
Wrote 3 papers:
- CASE-2009-LiQW #parallel #scheduling
- ACO-based scheduling of parallel batch processing machines to minimize the total weighted tardiness (LL, FQ, QW), pp. 280–285.
- CASE-2008-KangXWW #assembly #scheduling
- A swarm-dynamic scheduling method for semiconductor assembly production line (QK, HX, LW, QW), pp. 91–96.
- CASE-2006-WangQW #multi #optimisation #scheduling
- Scheduling Semiconductor Wafer Fabrication with Optimization of Multiple objectives (ZW, FQ, QW), pp. 253–258.