Travelled to:
1 × Canada
1 × Italy
1 × USA
Collaborated with:
S.C.Steneberg ∅
Talks about:
schedul (3) model (2) constraint (1) transient (1) consecut (1) problem (1) multipl (1) mission (1) control (1) versus (1)
Person: Ralf Fröhlich
DBLP: Fr=ouml=hlich:Ralf
Contributed to:
Wrote 3 papers:
- CASE-2011-FrohlichS #multi #scheduling
- Transient multiple hoist scheduling of consecutive cyclic schedules (RF, SCS), pp. 357–362.
- CASE-2010-FrohlichS #automation #constraints #matrix #modelling #problem #scheduling #using
- Relation matrices for automated MILP modeling of scheduling problems using temporal constraints (RF, SCS), pp. 69–74.
- CASE-2008-Froehlich #modelling
- Mission control: Local versus global modeling of robot tasking and routing (RF), pp. 566–571.