Travelled to:
1 × Korea
Collaborated with:
B.Vogel-Heuser M.Merz T.Hadlich K.Eckert A.Fay C.Diedrich
Talks about:
system (3) autom (2) manufactur (1) distribut (1) disciplin (1) redeploy (1) industri (1) softwar (1) network (1) control (1)
Person: Timo Frank
DBLP: Frank:Timo
Contributed to:
Wrote 2 papers:
- CASE-2012-FrankHEFDV #automation #modelling #realtime #requirements #using
- Using contact points to integrate discipline spanning real-time requirements in modeling Networked Automation Systems for manufacturing systems (TF, TH, KE, AF, CD, BVH), pp. 851–856.
- CASE-2012-MerzFV #automation #distributed #industrial #runtime
- Dynamic redeployment of control software in distributed industrial automation systems during runtime (MM, TF, BVH), pp. 863–868.