Travelled to:
1 × USA
Collaborated with:
T.Nishi M.Inuiguchi I.E.Grossmann
Talks about:
schedul (2) method (2) lagrangian (1) decomposit (1) simultan (1) flowshop (1) success (1) product (1) problem (1) multipl (1)
Person: Yuichiro Hiranaka
DBLP: Hiranaka:Yuichiro
Contributed to:
Wrote 2 papers:
- CASE-2007-NishiHI #problem #scheduling
- A Successive Lagrangian Relaxation Method for Solving Flowshop Scheduling Problems with Total Weighted Tardiness (TN, YH, MI), pp. 875–880.
- CASE-2007-NishiHIG #composition #generative #multi #scheduling
- A Decomposition Method with Cut Generation for Simultaneous Production Scheduling and Routing for multiple AGVs (TN, YH, MI, IEG), pp. 658–663.