Travelled to:
1 × Taiwan
Collaborated with:
H.Zhu Xinming Hu W.Cui
Talks about:
schedul (2) problem (2) constrain (1) algorithm (1) deliveri (1) aircraft (1) resourc (1) project (1) product (1) mainten (1)
Person: Zhiqiang Lu
DBLP: Lu:Zhiqiang
Contributed to:
Wrote 3 papers:
- CASE-2014-CuiL #scheduling
- Integrated production scheduling and periodic maintenances on a single machine with release dates (WWC, ZL), pp. 353–358.
- CASE-2018-LuZH #assembly #optimisation #problem
- Optimization of Material Delivery Problem for Aircraft Moving Assembly Line (ZL, HZ, XH), pp. 926–930.
- CASE-2018-ZhuLH #algorithm #heuristic #multi #problem #scheduling
- A Modified Heuristic Algorithm for Resource Constrained Multi-project Scheduling Problem based on Inspection and Rework (HZ, ZL, XH), pp. 1058–1063.