8 papers:
- CASE-2015-DiganiHSS #approach #coordination #multi #polynomial #programming
- A Quadratic Programming approach for coordinating multi-AGV systems (VD, MAH, LS, CS), pp. 600–605.
- CASE-2015-LiLFZT #automation
- Vision-based intelligent forklift Automatic Guided Vehicle (AGV) (LL, YL, MF, ZZ, HT), pp. 264–265.
- CASE-2011-KalinovcicPBB #algorithm #multi #scheduling
- Modified Banker’s algorithm for scheduling in multi-AGV systems (LK, TP, SB, VB), pp. 351–356.
- SAC-2010-ChoePR #estimation
- Dispatching AGVs with noisy estimation of crane operation time (RC, TP, KRR), pp. 1288–1293.
- CASE-2007-NishiHIG #composition #generative #multi #scheduling
- A Decomposition Method with Cut Generation for Simultaneous Production Scheduling and Routing for multiple AGVs (TN, YH, MI, IEG), pp. 658–663.
- HCI-IPT-2007-HuangPX #design
- AGV Simulator and Implementer Design (QH, TP, WX), pp. 818–826.
- CASE-2006-NishiM #composition #optimisation #petri net #problem
- Decomposition of Petri Nets for Optimization of Routing Problem for AGVs in Semiconductor Fabrication Bays (TN, RM), pp. 236–241.
- TOOLS-ASIA-1997-WangMG #database #object-oriented
- An Object-Oriented Environment Database for AGV Path Planing (TW, QHM, NEG), pp. 86–95.