5 papers:
- DATE-2015-WaqasGKSBSVC #heuristic #online #scalability #scheduling
- A re-entrant flowshop heuristic for online scheduling of the paper path in a large scale printer (UW, MG, JK, LJS, TB, SS, PV, HC), pp. 573–578.
- CASE-2014-LiY #scheduling
- ACO-ICSA based scheduling of re-entrant manufacturing system with Mix-processing Style (LL, QY), pp. 87–92.
- CASE-2013-JiaJL #algorithm #scheduling
- A job-family-oriented algorithm for re-entrant batch processing machine scheduling (WJ, ZJ, YL), pp. 1022–1027.
- CASE-2007-WangL #analysis #approximate #modelling #reliability
- Approximate Analysis of Re-Entrant Lines with Bernoulli Reliability Models (CW, JL), pp. 398–403.
- CASE-2005-ZhangFZ #assembly #capacity #modelling #multi #workflow
- Dynamic capacity modeling with multiple re-entrant workflows in semiconductor assembly manufacturing (MTZ, JF, EZ), pp. 160–165.