Travelled to:
1 × Canada
1 × China
1 × Sweden
1 × Taiwan
Collaborated with:
T.Chen C.Chen S.Lo H.Lee H.Hsu C.Chen Y.Liu Y.Lin M.Huang C.Cheng C.Cheng
Talks about:
system (3) manufactur (2) robot (2) base (2) semiconductor (1) reschedul (1) synthesi (1) strategi (1) humanoid (1) diagnost (1)
Person: Han-Pang Huang
DBLP: Huang:Han=Pang
Contributed to:
Wrote 6 papers:
- CASE-2015-HuangHCC #performance #synthesis
- Efficient grasp synthesis and control strategy for robot hand-arm system (MBH, HPH, CCC, CAC), pp. 1256–1257.
- CASE-2014-ChenHL #development
- Development of an e-diagnostics system based on Web-services (CHC, HPH, SYL), pp. 686–691.
- CASE-2014-LeeHH
- Lifting motion planning for humanoid robots (HyL, HPH, HKH), pp. 1174–1179.
- CASE-2006-HuangC #online
- On-Line Rescheduling for Semiconductor Manufacturing (HPH, TYC), pp. 106–111.
- CASE-2006-HuangCC #mobile #safety
- Mobile Diagnosis based on RFID for Food Safety (HPH, CSC, TYC), pp. 357–362.
- CASE-2005-LiuHL #flexibility #scheduling #using
- Dynamic scheduling of flexible manufacturing system using support vector machines (YHL, HPH, YSL), pp. 387–392.