Travelled to:
1 × Canada
1 × India
1 × Italy
Collaborated with:
M.P.Fanti W.Ukovich M.Dotoli A.M.Mangini Monica Clemente Massimiliano Nolich
Talks about:
constraint (2) distribut (2) schedul (2) problem (2) center (2) solv (2) transport (1) symmetri (1) intermod (1) contain (1)
Person: Gabriella Stecco
DBLP: Stecco:Gabriella
Contributed to:
Wrote 4 papers:
- CASE-2011-FantiSU #constraints #problem #scheduling #symmetry #using
- Solving scheduling problems in distribution centers using symmetry breaking constraints (MPF, GS, WU), pp. 58–65.
- CASE-2010-FantiSU #constraints #scheduling
- Scheduling the internal operations in distribution centers with buffer constraints (MPF, GS, WU), pp. 75–80.
- CASE-2009-DotoliFMSU #analysis #petri net
- The impact of ICT on an Intermodal Transportation System: an analysis by Petri Nets (MD, MPF, AMM, GS, WU), pp. 513–518.
- CASE-2017-ClementeFNSU #modelling #multi #problem
- Modelling and solving the multi-day container drayage problem (MC, MPF, MN, GS, WU), pp. 231–236.