Travelled to:
1 × Canada
1 × China
1 × India
1 × Italy
1 × Korea
1 × Sweden
1 × Taiwan
3 × USA
Collaborated with:
W.Ukovich A.M.Mangini M.Dotoli G.Iacobellis G.Stecco G.Rotunno Lorenzo Abbatecola M.Roccotelli Massimiliano Nolich N.Costantino M.Falagario F.Sciancalepore Giovanni Pedroncelli S.Pizzuti J.Lesage K.Viard Monica Clemente Andrea Rusich Giambattista Fiume Alfredo Favenza Bartolomeo Silvestri Salvatore Digiesi R.Laraspata L.Abbatecola
Talks about:
system (9) petri (6) net (6) model (5) distribut (4) approach (4) problem (4) vehicl (4) manag (4) strategi (3)
Person: Maria Pia Fanti
DBLP: Fanti:Maria_Pia
Contributed to:
Wrote 23 papers:
- CASE-2015-FantiIU #multimodal
- A decision support system for multimodal logistic management (MPF, GI, WU), pp. 63–68.
- CASE-2015-FantiMRUP #energy #strict
- A control strategy for district energy management (MPF, AMM, MR, WU, SP), pp. 432–437.
- CASE-2014-FantiLIMUA #approach
- A Decision Support System approach for the postal delivery operations (MPF, RL, GI, AMM, WU, LA), pp. 588–593.
- CASE-2014-FantiMULV #health #petri net
- A Petri net model of an integrated system for the Health Care At Home management (MPF, AMM, WU, JJL, KV), pp. 582–587.
- CASE-2013-FantiIRU #analysis #scheduling #simulation
- A simulation based analysis of production scheduling in a steelmaking and continuous casting plant (MPF, GI, GR, WU), pp. 150–155.
- CASE-2012-DotoliFIR #agile #modelling #simulation #using
- A lean manufacturing strategy using Value Stream Mapping, the Unified Modeling Language, and discrete event simulation (MD, MPF, GI, GR), pp. 668–673.
- CASE-2012-FantiIMU #case study #design #evaluation #performance
- A three level strategy for the design and performance evaluation of Hospital Departments: A case study (MPF, GI, AMM, WU), pp. 323–328.
- CASE-2011-CostantinoDFFMSU #approach #design #fuzzy #network #programming
- A fuzzy programming approach for the strategic design of distribution networks (NC, MD, MF, MPF, AMM, FS, WU), pp. 66–71.
- CASE-2011-DotoliFI #first-order #hybrid #petri net
- A freeway traffic control model by first order hybrid Petri nets (MD, MPF, GI), pp. 425–431.
- CASE-2011-FantiSU #constraints #problem #scheduling #symmetry #using
- Solving scheduling problems in distribution centers using symmetry breaking constraints (MPF, GS, WU), pp. 58–65.
- CASE-2010-CostantinoDFFMSU #design #network
- A model for the strategic design of Distribution Networks (NC, MD, MF, MPF, AMM, FS, WU), pp. 406–411.
- CASE-2010-FantiSU #constraints #scheduling
- Scheduling the internal operations in distribution centers with buffer constraints (MPF, GS, WU), pp. 75–80.
- CASE-2009-DotoliFMSU #analysis #petri net
- The impact of ICT on an Intermodal Transportation System: an analysis by Petri Nets (MD, MPF, AMM, GS, WU), pp. 513–518.
- CASE-2009-DotoliFMU #fault #framework #online #petri net
- On-line fault diagnosis in a Petri Net framework (MD, MPF, AMM, WU), pp. 42–47.
- CASE-2008-DotoliFM #automation #fault #first-order #hybrid #monitoring #petri net
- Fault monitoring of automated manufacturing systems by first order hybrid Petri nets (MD, MPF, AMM), pp. 181–186.
- CASE-2007-DotoliFM #identification #monitoring #on the #petri net #specification
- On Line Identification of Discrete Event Systems via Petri Nets: an Application to Monitor Specification (MD, MPF, AMM), pp. 893–898.
- CASE-2006-DotoliFM #case study #identification #online
- On-Line Identification of Discrete Event Systems: a Case Study (MD, MPF, AMM), pp. 405–410.
- CASE-2016-AbbatecolaFU #overview #problem
- A review of new approaches for Dynamic Vehicle Routing Problem (LA, MPF, WU), pp. 361–366.
- CASE-2017-ClementeFNSU #modelling #multi #problem
- Modelling and solving the multi-day container drayage problem (MC, MPF, MN, GS, WU), pp. 231–236.
- CASE-2017-FantiINRU
- A decision support system for cooperative logistics (MPF, GI, MN, AR, WU), p. 394.
- CASE-2018-AbbatecolaFPU #approach #clustering #problem
- A New Cluster-Based Approach for the Vehicle Routing Problem with Time Windows (LA, MPF, GP, WU), pp. 744–749.
- CASE-2018-FantiMRFF #architecture #in the cloud
- A Cloud Computing Architecture for Eco Route Planning of Heavy Duty Vehicles (MPF, AMM, GR, GF, AF), pp. 730–735.
- CASE-2019-FantiMRSD
- Electric Vehicle Fleet Relocation Management for Sharing Systems based on Incentive Mechanism (MPF, AMM, MR, BS, SD), pp. 1048–1053.