Travelled to:
1 × Italy
1 × Korea
1 × USA
Collaborated with:
L.Zhang J.Arinez S.Biller G.Xiao Z.Jia
Talks about:
line (4) product (3) serial (3) bernoulli (2) perform (2) analysi (2) machin (2) finit (2) time (2) manufactur (1)
Person: Guorong Chen
DBLP: Chen:Guorong
Contributed to:
Wrote 4 papers:
- CASE-2013-ChenZAX #analysis #finite
- Analysis of production completion time in Bernoulli serial lines with finite buffers (GC, LZ, JA, GX), pp. 770–775.
- CASE-2012-ChenZAB #analysis #approach #performance #realtime
- Real-time performance analysis of production lines: A system-theoretic approach (GC, LZ, JA, SB), pp. 656–661.
- CASE-2011-ChenZAB #energy #feedback
- Feedback control of machine startup for energy-efficient manufacturing in Bernoulli serial lines (GC, LZ, JA, SB), pp. 666–671.
- CASE-2016-JiaZCAX #evaluation #finite #geometry #performance
- Performance evaluation in finite production run-based serial lines with geometric machines (ZJ, LZ, GC, JA, GX), pp. 450–455.