Travelled to:
1 × China
Collaborated with:
N.R.S.Raghavan
Talks about:
processor (1) parallel (1) incompat (1) schedul (1) famili (1) coloni (1) optim (1) batch (1) use (1) job (1)
Person: M. Venkataramana
DBLP: Venkataramana:M=
Contributed to:
Wrote 1 papers:
- CASE-2006-RaghavanV #optimisation #parallel #product line #scheduling #using
- Scheduling Parallel Batch Processors with Incompatible Job Families Using Ant Colony Optimization (NRSR, MV), pp. 507–512.