Travelled to:
1 × Canada
1 × China
Collaborated with:
P.Shrinivas M.Venkataramana S.Jain S.Dulluri
Talks about:
optim (2) use (2) processor (1) inventori (1) parallel (1) incompat (1) discount (1) advertis (1) schedul (1) product (1)
Person: N. R. Srinivasa Raghavan
DBLP: Raghavan:N=_R=_Srinivasa
Contributed to:
Wrote 4 papers:
- CASE-2006-RaghavanV #optimisation #parallel #product line #scheduling #using
- Scheduling Parallel Batch Processors with Incompatible Job Families Using Ant Colony Optimization (NRSR, MV), pp. 507–512.
- CASE-2006-ShrinivasR
- Optimal advertisement-innovation mix for maximizing the discounted flow of profit (PS, NRSR), pp. 562–567.
- CASE-2005-DulluriSR #predict
- Predicting price-tag for customized goods (SD, PS, NRSR), pp. 136–141.
- CASE-2005-JainR #analysis #modelling #using
- Analysis of base-stock controlled production-inventory system using discrete-time queueing models (SJ, NRSR), pp. 37–42.