Travelled to:
1 × Canada
1 × India
1 × Italy
1 × Korea
1 × Taiwan
1 × USA
Collaborated with:
M.Dahane S.Dellagi K.Ba S.Turki H.Zied Z.Hajej R.A.F.Gomez S.Hennequin
Talks about:
product (5) mainten (4) optim (3) plan (3) subcontractor (2) subcontract (2) manufactur (2) outsourc (2) deliveri (2) system (2)
Person: Nidhal Rezg
DBLP: Rezg:Nidhal
Contributed to:
Wrote 6 papers:
- CASE-2014-BaDR #maintenance #policy
- Green management of Spare parts for an integrated optimal maintenance and production policy (KB, SD, NR), pp. 359–364.
- CASE-2012-TurkiZN #maintenance
- Impact of delivery time on optimal production/delivery/maintenance planning (ST, HZ, NR), pp. 335–340.
- CASE-2011-DahaneR #multi #outsourcing
- Economic model of outsourcing for a subcontractor manufacturing system in a single subcontractor — multi-outsourcers relationship (MD, NR), pp. 450–455.
- CASE-2010-DahaneR #integration #process
- Integration of subcontracting activity in a production planning for randomly failing manufacturing system: Feasibility and profitability conditions (MD, NR), pp. 100–105.
- CASE-2009-ZiedSN #maintenance #probability #random
- An optimal production/maintenance planning under stochastic random demand, service level and failure rate (ZH, SD, NR), pp. 292–297.
- CASE-2007-GomezHR #fuzzy #logic #maintenance
- Decision Making Based on Fuzzy Logic for Product Subcontracting Taking into Account Maintenance Actions (RAFG, SH, NR), pp. 771–776.