Travelled to:
1 × Germany
Collaborated with:
P.Malani Q.Qiu Q.Wu
Talks about:
multiprocessor (1) determinist (1) workload (1) schedul (1) voltag (1) applic (1) scale (1) adapt (1) time (1) real (1)
Person: Prakash Mukre
DBLP: Mukre:Prakash
Contributed to:
Wrote 1 papers:
- DATE-2008-MalaniMQW #adaptation #multi #nondeterminism #realtime #scalability #scheduling
- Adaptive Scheduling and Voltage Scaling for Multiprocessor Real-time Applications with Non-deterministic Workload (PM, PM, QQ, QW), pp. 652–657.