Travelled to:
1 × China
Collaborated with:
S.Chandrasekaran S.G.Ponnambalam N.Vijayakumar
Talks about:
algorithm (1) makespan (1) flowshop (1) varianc (1) schedul (1) problem (1) particl (1) flowtim (1) complet (1) permut (1)
Person: R. K. Suresh
DBLP: Suresh:R=_K=
Contributed to:
Wrote 1 papers:
- CASE-2006-ChandrasekaranSPV #algorithm #optimisation #permutation #problem #scheduling
- An Application of Particle Swarm Optimization Algorithm to Permutation Flowshop Scheduling Problems to Minimize Makespan, Total Flowtime and Completion Time Variance (SC, RKS, SGP, NV), pp. 513–518.