Collaborated with:
Z.Lu H.Zhu
Talks about:
problem (2) constrain (1) algorithm (1) deliveri (1) aircraft (1) schedul (1) resourc (1) project (1) inspect (1) heurist (1)
Person: Xinming Hu
DBLP: Hu:Xinming
Contributed to:
Wrote 2 papers:
- CASE-2018-LuZH #assembly #optimisation #problem
- Optimization of Material Delivery Problem for Aircraft Moving Assembly Line (ZL, HZ, XH), pp. 926–930.
- CASE-2018-ZhuLH #algorithm #heuristic #multi #problem #scheduling
- A Modified Heuristic Algorithm for Resource Constrained Multi-project Scheduling Problem based on Inspection and Rework (HZ, ZL, XH), pp. 1058–1063.