7 papers:
OOPSLA-2014-BarrM #debugging #named- Tardis: affordable time-travel debugging in managed runtimes (ETB, MM), pp. 67–82.
CASE-2012-DimitrovB #algorithm #evaluation #reduction #scheduling #search-based- Criteria evaluation considering the current time used by a genetic scheduling algorithm for changeover and tardiness reduction (TD, MB), pp. 425–430.
CASE-2009-LiQW #parallel #scheduling- ACO-based scheduling of parallel batch processing machines to minimize the total weighted tardiness (LL, FQ, QW), pp. 280–285.
CASE-2008-Monch #heuristic #parallel- Heuristics to minimize total weighted tardiness of jobs on unrelated parallel machines (LM), pp. 572–577.
CASE-2007-NishiHI #problem #scheduling- A Successive Lagrangian Relaxation Method for Solving Flowshop Scheduling Problems with Total Weighted Tardiness (TN, YH, MI), pp. 875–880.
CASE-2006-ChengSOYII #performance #scheduling- A fast rescheduling method in semiconductor manufacturing allowing for tardiness and scheduling stability (MC, MS, JO, MY, HI, KI), pp. 100–105.
CASE-2005-PanSY #approach #optimisation #problem- A new optimization approach to the general single machine earliness-tardiness problem (YP, LS, HY), pp. 43–48.