Green Job Shop Scheduling Problem with Machine at Different Speeds using a multi-objective grey wolf optimization algorithm*
BibSLEIGH corpus
BibSLEIGH tags
BibSLEIGH bundles
BibSLEIGH people
EDIT!
CC-BY
Open Knowledge
XHTML 1.0 W3C Rec
CSS 2.1 W3C CanRec
email twitter

Yuesheng Luo, Chao Lu, Xinyu Li, Ling Wang, Liang Gao 0001
Green Job Shop Scheduling Problem with Machine at Different Speeds using a multi-objective grey wolf optimization algorithm*
CASE, 2019.

CASE 2019
DBLP
Scholar
DOI
Full names Links ISxN
@inproceedings{CASE-2019-LuoLLWG,
	author        = "Yuesheng Luo and Chao Lu and Xinyu Li and Ling Wang and Liang Gao 0001",
	booktitle     = "{Proceedings of the 15th International Conference on Automation Science and Engineering}",
	doi           = "10.1109/COASE.2019.8843132",
	isbn          = "978-1-7281-0356-3",
	pages         = "573--578",
	publisher     = "{IEEE}",
	title         = "{Green Job Shop Scheduling Problem with Machine at Different Speeds using a multi-objective grey wolf optimization algorithm*}",
	year          = 2019,
}

Tags:



Bibliography of Software Language Engineering in Generated Hypertext (BibSLEIGH) is created and maintained by Dr. Vadim Zaytsev.
Hosted as a part of SLEBOK on GitHub.