Travelled to:1 × Canada
Collaborated with:A.Vergnano C.Thorstensson B.Lennartson P.Falkman M.Pellicciari C.Yuan S.Biller
Talks about:schedul (1) energi (1) detail (1) robot (1) optim (1) level (1) embed (1) high (1)
Person: Francesco Leali
 DBLP: Leali:Francesco
 DBLP: Leali:Francesco
Contributed to:
Wrote 1 papers:
- CASE-2010-VergnanoTLFPYBL #energy #optimisation #scheduling
- Embedding detailed robot energy optimization into high-level scheduling (AV, CT, BL, PF, MP, CY, SB, FL), pp. 386–392.












