Travelled to:
1 × China
Collaborated with:
M.Cheng M.Sugi J.Ota M.Yamamoto K.Inoue
Talks about:
semiconductor (1) manufactur (1) reschedul (1) schedul (1) stabil (1) method (1) tardi (1) allow (1) fast (1)
Person: Hiroki Ito
DBLP: Ito:Hiroki
Contributed to:
Wrote 1 papers:
- CASE-2006-ChengSOYII #performance #scheduling
- A fast rescheduling method in semiconductor manufacturing allowing for tardiness and scheduling stability (MC, MS, JO, MY, HI, KI), pp. 100–105.